Latitude East

– A Multiplex Project Steel in Buildings CASE STUDY


!MODELOFPRE PLANNINGFORSUCCESS

Structural Steel Delivered:

• Speed of Construction – earlier occupancy


• Competitive Cost – reduced construction
costs preliminaries and overheads
• Reduced congestion in a CBD environment www.beyond2.com.au
• Sustainability benefits through the ability
to reuse and recycle.
Latitude East
– A Multiplex Project
- A model of pre-planning for success.
Following on from the highly acclaimed These columns were linked in an east, west
Ernst and Young Building, Multiplex are direction with primary 610UB, while the
completing another high profile Sydney north, south secondary beams (460UB,
CBD project on the same site. 310UB) at 2.8m centres were connected
with angle cleats to the main beams which
Latitude East is a 24 storey complex, based took advantage of cost effective beam line
on an existing 12 storey platform. This fabrication.
construction features a visually stunning Over this frame a composite Bondek
atrium with exposed lift and stair structures. floor was placed which include all façade
The building is based on a composite requirements.
structural steel frame with Bondek flooring
features that have significantly reduced the The required fire rating was achieved
weight of the structure and improved its through the concrete filled 600 diameter
speed of construction. columns and fire rating to the primary
beams only.
The complexity of this construction
concerned working around the existing Areas of cantilevered floors were constructed
tenancy and 24 hour operational car park and by incorporating column stubs, profile cut
logistics of truck movements within a very around the beam to allow a continuous
restricted access CBD site. Truck loadings primary beam to pass through; the beam
and movements were coordinated so was then fully welded to the stub. Carefully
fabricated assembles were unloaded in the placed prefabricated reinforced cages
correct sequence for cranage. This proved a from the column below gave the columns
significant benefit over the truck movements continuity.
which would have been associated with
traditional concrete construction. The roof plant room loads were distributed
to perimeter columns by suspending the
In this building Lysaghts D&C were the plant room floor from node points to a
prime subcontractors to Multiplex and a fabricated truss system, thus minimizing the
cooperative planning process was used to number of columns to be strengthened in
identify potential problems up front and to the existing structure.
overcome them.

This process together with the flexibility of


the off site fabrication process delivered
minimal disruption to the site, a fast Acknowledgements:
program allowing follow on trades in quick
succession and a clean site with a well Builder:
“To achieve the tight
managed construction process. Multiplex programme and
Architects:
To achieve the tight programme and budget Crone Partners budget constraints
constraints and to take advantage of
technological developments it was essential
Engineering:
Structural TTW
and to take advantage
for this forward planning and co ordination Façade Connell Mort McDonald of technological
between the consultants (Architect, Crone Mechanical Waterman AHV
Partners and Engineer, Taylor Thompson Prime Contractor: developments it was
Whitting) the steel fabricator, mechanical Lysaghts D&C essential for this
services, concrete and façade contractors to Subcontract Fabrication:
be thorough and all inclusive. Allman Fabrications Steel Lift Shaft forward planning and
Sebastian Engineering Beamline Structurals
The structure featured 600 diameter circular Phoenix Engineering Welded Connections
co ordination
steel columns, reinforced. The column Erection: between the
reinforcing was prefabricated to suit the Penrith Rigging
column lengths and include the splice laps. Detailing: … contractors
These were supplied to the steel fabricator Elmasri
who inserted and tack welded them in
to be thorough and
position. This resulted in the column being all inclusive.”
erected as complete units.