WORK EXPERIENCE
Supervising and monitoring civil and finishing works progress for the
construction of a Laboratory Building including a Switchgear and a Maintenance
Building, from April 2017 to present.
Activities:
1- Coordination and meeting with contractors (visit to vendor factories,
expediting material production, resolving technical issues).
2- Quality inspections (RFI) of works offered by Contractor for acceptance.
3- Supervision of Mobilization to site including mass excavation, fence, site
facilities.
4- Supervision of Contractor construction of concrete superstructure
(including soil probing, isolated and strip footing, mass foundation, columns,
slabs, staircases). Excavation and construction of 250 meters length
pedestrian underground tunnel (under S.E. Al Naimi Street) including 60
maxi size precast module sections, installation of curtain wall and façade
precast panel (870 panels), external civil works (retaining walls, backfilling,
manholes, waterproofing, landscape and hardscape etc..).
Saudi Aramco: Company General Use
Supervising and monitoring civil and finishing works progress for the
construction of a Utility Building (Generators, AC Units, Transformers,
Switchgear, Battery room), Data Center (including server rom, CRAC
units/switchgear, battery and offices room) and a Conference Center (including
a Multipurpose Hall, an Auditorium of 1000 seats, offices, meeting rooms,
seismic isolated TV broadcasting studio and a large kitchen restaurant size area)
from June 2012 to January 2017.
Activities:
1- Coordination and meeting with contractors and Consultant (visit to vendor
factories, expediting material production, resolving technical issues).
2- Quality inspections (RFI) of works offered by Contractor for acceptance.
3- Supervision of Contractor for finishing works (raised floor, interior glazing,
high level drywall partitions of 5, 10, 20 meters high, demountable and
movable partitions, metal doors, carpeting, resinous flooring, bespoke
furniture, interior metal cladding and lining, interior ceiling and wall GFRP
3D featured panels, acoustic ceiling, digital wall screen and 6x3 meter
projection screen with backwall projection system installation)
4- Supervision of Contractor for civil works (seismic flooring for TV
broadcasting studio, Stage rigging system, Steel catwalk, interior screed,
CMU block work, steel structure framing installation) and Façade (GFRC
cladding, Curtain Wall glazing and skylights installation).
5- Technical Queries review
6- Verifying and reporting weekly progress and highlights to higher
management.
7- Material package approval review.
8- IFC, Shop drawings, method of statement review.
9- Reviewing Exception Item Lists and follow up the closure with Contractor
and all Stakeholders.
10- Supervising Contract Safety requirements implementation on site.
11- Preparation of Mid Form Contracts and change orders (MTO and company
estimates review)
Supervising and monitoring civil and finishing works progress for the
construction of an Auditorium (1000 seats), a Restaurant, a Library and a Data
Center, from March 2009 to March 2010.
Activities:
1- Coordination and meeting with contractors and Consultant (visit to vendor
factories, expediting material production, resolving technical issues).
2- Quality inspections (RFI) of works offered by Contractor for acceptance.
3- Supervision of Contractor for finishing works (raised floor, interior glazing,
drywall partitions, metal doors, carpeting, marble/carpet/wooden flooring,
bespoke furniture, wooden acoustic lining, acoustic fabric interior ceiling and
wall, stage rigging system installation)
4- Supervision of Contractor for civil works (Steel catwalk, interior screed,
CMU block work, steel structure framing installation) and Façade (Curtain
Wall terracotta cladding, Curtain Wall Alabaster marble cladding, Curtain
Wall glazing and skylights installation).
5- Technical Queries review
6- Verifying and reporting weekly progress and highlights to higher
management.
7- Material package approval review.
8- IFC, Shop drawings, method of statement review.
9- Reviewing Exception Item Lists and follow up the closure with Contractor
and all Stakeholders.
10- Supervising Contract Safety requirements implementation on site.
With Zuhair Fayez Partnership, Lead architect producing project proposals and
detail design of several government civil projects (schools, mosques,
multipurpose hall, sport facilities, markets, restaurants, medical clinic, housing)
for Thuwall Development.
Activities:
1- review of shop drawings
2- Review of material submittal
3- Review of MTO and vendor quotations
4- Review of Schedule of works
5- Supervision of construction works (steel works mezzanines erection,
screed flooring, carpet/marble/ceramic/resinous flooring installation,
drywall construction, glazing installation.
6- Coordination with other disciplines (HVAC and electrical)
7- Quality inspections (RFI) for acceptance.
8- Supervision of Contractor for finishing works (raised floor, interior
glazing, drywall partitions, metal doors, carpeting, marble/carpet/wooden
flooring, bespoke furniture, wooden acoustic lining, acoustic fabric
interior ceiling and wall)
9- Material package approval review.
10- Closing Exception Item Lists for Client acceptance.
Activities:
1- Design concept and IFC drawings.
2- Quality control.
3- Management of project and schedule of works.
4- Work permit.
5- MEP review and coordination with mechanical,
electrical and civil disciplines
Saudi Aramco: Company General Use
Activities:
1- Design concept and IFC drawings.
2- Quality control.
3- Management of project and schedule of works.
4- Work permit.
5- MEP review and coordination with mechanical, electrical and civil
disciplines.
EDUCATION