PROJECT CONTROL PROCEDURES AND SYSTEMS PROJECT CONTROL SYSTEMS FOR MAINTENANCE ACTIVITIES.

. 1.Preventative maintenance Preventative maintenance actions are to be performed for the items that exhibit a well defined deterioration characteristic such as the chance failure increasing with time e.g. Mean Time to Failure; The action will delay, prevent or predict the occurrence of the identified failure mode. Preventive maintenance is intended to be performed either before an item fails, or reaches the point where an unacceptable level of performance has occurred.

Control S !tem Met"o#olo$ %or Preventative maintenance


Start (Site Takeover)

Pro ect planning team will prepare a Preventative maintenance schedule based upon the maintenance activities as specified in O&eration 'Maintenance Ta!( Sc"e#)le OMTS re$i!ter and scope of *OR+S for each of t"e a!!et location a! !&eci%ie# in t"e Contract #oc)ment , A!!et Re$i!ter, Dra-in$! an# contract a!!et! #ata.

Project Planner/CMMS operator to generate WOs based on the schedule prepared earlier on daily basis as per ork re!uired"

Planning #ngineer to revie the WOs generated

Target $ate need to be changed%

!"
Planning #ngineer approves the details o& WO"

#$%

Planning #ngineer changes the details &or WO as necessary

Planning #ngineer distributes the WO to the ork supervisors

Supervisors received the WOs and e'ecute the PM tasks as per the OMTS tasks register &or the locations speci&ied in contract

Supervisors co(plete the actual ork reports and &ailure reports to Planning engineer"

Planning tea( check actual ork details and analy)e ork per&or(ance and prepare ork co(pletion report

Planner CMMS operator to update WO details in CMMS and close the WO"