. 1.Preventative maintenance Preventative maintenance actions are to be performed for the items that exhibit a well defined deterioration characteristic such as the chance failure increasing with time e.g. Mean Time to Failure; The action will delay, prevent or predict the occurrence of the identified failure mode. Preventive maintenance is intended to be performed either before an item fails, or reaches the point where an unacceptable level of performance has occurred.
Pro ect planning team will prepare a Preventative maintenance schedule based upon the maintenance activities as specified in O&eration 'Maintenance Ta!( Sc"e#)le OMTS re$i!ter and scope of *OR+S for each of t"e a!!et location a! !&eci%ie# in t"e Contract #oc)ment , A!!et Re$i!ter, Dra-in$! an# contract a!!et! #ata.
Project Planner/CMMS operator to generate WOs based on the schedule prepared earlier on daily basis as per ork re!uired"
!"
Planning #ngineer approves the details o& WO"
#$%
Supervisors received the WOs and e'ecute the PM tasks as per the OMTS tasks register &or the locations speci&ied in contract
Supervisors co(plete the actual ork reports and &ailure reports to Planning engineer"
Planning tea( check actual ork details and analy)e ork per&or(ance and prepare ork co(pletion report
Planner CMMS operator to update WO details in CMMS and close the WO"