MANPOWER PLAN VS ACTUAL Quality Manager S.I Coordinator Inspection Engineer Quality Engineer QAQC Engineer Sr.

QAQC Engineer Sr. Quality Lead Quality Lead Planned as on 22 August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011 Actual Planned as on 22nd August 2011
nd

Remark 1 1 1 1 1 1 2 3 2 1 0 1 1 1 2 2 25 7 positions TBA - 1 Mech. QC Inspector - 1 GRE Inspector 24 - 1 Piping Inspector - 2 Insulation Inspector - 1 E&I Inspector - 1 Welding Inspector 1 1

QC Inspector

Actual

NDT Coordinator Overall Planned Actual

Planned as on 22nd August 2011 Actual

36 #REF!

Name Intan Zuria Hanini Mohd Fairoz Shukor Kamarudin Berahim Shamsul Sulaiman Vicknewaran Thilak Raj Mohd Ainan

Resigned staff Designation Quality Engineer Inspection Engineer Piping Inspector Welding Inspector QC Inspector QC Engineer QC Engineer

Replacement TBA TBA TBA TBA TBA Raja Ravivarma Mohd Ridzuan