FC1

FC1

TB1

S-2

TB1 ** ALL COLUMN DIMENSION ARE 230 MM X 550 MM. CONCRETE GRADE ARE M20. ** TB = TRANSFER BEAM ** FC = FLOATING COLUMN INDICATED AS ** MOMENT, SHEAR AND VERTICAL LOAD ARE IN SERVICE LOAD LIKE DEAD LOAD + LIVE LOAD
OPTION 1 OPTION 2 REQUIRED STEEL SECTION

S-2

BEAM NO.

BEAM LENGTH

ACTUAL BEAM DIMENSION AT SITE

MOMENT AT CENTER OF SPAN

MOMENT AT SUPPORT

SHEAR AT SUPPORT

REQUIRED CONCRETE SECTION

TB1

3 METER

B - 230 MM D - 300 MM

14 TON*M

3 TON*M

25 TON

B - 230 MM D - 700 MM

ISMB 400

TB2 FC2 TB2 S-2

3.75 METER

B - 230 MM D - 300 MM

48 TON*M

3 TON*M

32 TON

B - 230 MM D - 900 MM

ISMB 600

COLUMN NO.

DIMENSION B - 230 MM D - 550 MM B - 230 MM D - 550 MM

VERTICAL LOAD 27 TON 55 TON

FC1 S-2 FC2

SO, WHICH OPTION/METHOD I WILL USE FOR REBAR OF EXISTING BEAM. TB1 (1) INCREASE DEPTH OF EXISTING BEAM FROM 300 MM TO 900 MM BY REBAR JACKETING BEAM WITH EPOXY RESIN GROUT. (2) INCREASE DEPTH OF EXISTING BEAM BY PROVIDE ISMB 600/400 FROM EXISTING R.C.C BEAM BY FC1 FC1 ANCHOR FASTENER AND BASE PLATE CONNECTION.