WBS

Name 1.1 Prepare needs assessment 1.2 Determine location 1.3 Define budget 1.4 1.5 2.1 2.2 2.3 2.4 2.5 3.1 3.2 3.3 3.4 3.5 4.1 4.2 4.3 4.4 4.5 4.6 Determine desired finish date Specify quality level Develop plans Obtain permits Finalize construciton documents Obtain bids Select GC Construct space Meet with GC and architect Document issues Monitor changes walkthrough Organize move Develop final timeline Hire moving company Identify issues Prep for move Move

Estimated_Work 160h 80h 20h 4h 4h 320h 4h 80h 8h 16h 480h 4h 4h 48h 16h 120h 24h 16h 8h 40h 16h

Duration 4w 4w 1w 1w 1w 4w 6w 1w 3w 2d 12w .5d .5d 12w 1d 3w 5d 1w 1d 1w 2d