AUDIT MANPOWER & COST ESTIMATE

Tool Room Audit (With OT hrs.)


TRADE
Pipe Fitter rate Perday USL Rate Perday

Perday
484 448

Days to Work
26 26

Total
12584 11648

OT Hrs
104 104

OT Rate

Total OT

121 12584 112 11648 Total For 02 Pipe Fitter Total for 02 USL

Grand Total 25168 23296 50,336 46,592

Total Value
Tool Room Audit (With-out OT hrs.)
TRADE
Pipe Fitter rate Perday USL Rate Perday

96,928

Perday
484 448

Days to Work
40 40

Total
19360 17920

OT Hrs
0 0

OT Rate
0 0 Total For 02 Pipe Fitter Total for 02 USL

Total OT
0 0

Grand Total 19360 17920 38720 35840

Total Value
PM of Machines (With OT hrs.)
TRADE
A grade Field Machinist B grade Field Machinist

74560

Perday
668 578

Days to Work
30 30

Total
20040 17340

OT Hrs
104 104

OT Rate

Total OT

167 17368 144.5 15028 Total For 02 A grade Field Machinist Total for 02 B grade Field Machinist

Grand Total 37408 32368 74816 64736

Total Value
PM of Machines (With-out OT hrs.)
TRADE
A grade Field Machinist B grade Field Machinist

139552

Perday
668 578

Days to Work
40 40

Total
26720 23120

OT Hrs
0 0

OT Rate

Total OT

0 0 0 0 Total For 02 A grade Field Machinist Total for 02 B grade Field Machinist

Grand Total 26720 23120 53440 46240

Total Value

99680

PPE Box Filled With Machines Oil Level Machine Cutting Level

Ear Plugs

Glooves Dust Mask

MSEDe-Dusting Behing the Furnace De-Dusting in SAP Room of Machine Shop Any Cable lying Loosely in Machine Shop Fire Extinguisher Pressure (Full/Less) Fire Extinguisher Pressure (Full/Less) Fire Extinguisher + Dusting on Fire Extingisher Any Electrical Light Failure on Any Machine Any sort of leakage Oil Freezed in Trays Cutting Oil Trays Dumped in the Drums All Waste Drums Dumped

Write Tag #