You are on page 1of 4

DOCU NO

INSTALLATION SCHEDULE OF POWER TRANSFORMER


CUSTOMER
PROJECT
NO

Al Gihaz.co

LOCATION

SAUDI Madinah

Modon Madinah 380 kV

SPECIFICATION

3PH 60HZ 40 MVAR 2SET

1/2

D - Day

Month & Date


Work activities

PAGE

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

1 Preparation for assembly and unpacking


2 Assembly of radiators & Banks
3 Assembly of conservator with pipe line
4 Dry air filling
5 Assembly of HV, HVN & TV Bushings and box
6

Assembling of LV Bushing and chamber

Assembling of accessories pipe

Assembling of acc'y (cooling fan, wiring etc)

Vacuum (Less than 0.5torr, 60hour )

10 Oil filling to storage tank


11 Oil filling in transformer under vacuum
12 Oil Circulation in transformer
13 Touch up paint
14 Finishing works
15 Site Test
16
SUPERVISOR(HYUNDAI)
M
/
P

OPERATOR FOR OIL FILTERING M/C

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2

TEST MAN
WORKER (1FORMAN)

8 8 8 8 8 8 8 8 8 8 8 8 8

12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

DRY AIR CYLINDER (40bt)


E
Q
U
I
P
M
E
N
T

MOBIL CRANE (50Ton)


GENERATOR
FILTERING M/C (6,000 / hours)
VACCUM M/C & VACCUM GAUGE
OIL STORAGE TANK (CAPA : 30,000 litres) x 2
CHAIN BLOCK (5Ton)
TORQUE WRENCH(1~200N,M)

HHI A24-4TF(B)-1

Cable Chamber 2 Weeks

A4(297mm X 210m

1/2

51 52 53

2 2 2

mm X 210mm)

INSTALLATION SCHEDULE OF POWER TRANSFORMER


CUSTOMER
PROJECT
NO

Al Gihaz.Co

LOCATION

SAUDI Madinah City 6-Jan-2016

Modon Madinah 380kV

SPECIFICATION

3PH 60HZ 502MVA 3SET


D - Day

Month & Date


Work activities

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

1 Preparation for assembly and unpacking


2 Assembly of radiators & Banks
3 Assembly of conservator with pipe line
4 Dry air filling
5 Assembly of HV, HVN & TV Bushings and box
6

Assembling of LV Bushing and chamber

Assembling of accessories pipe

Assembling of acc'y (cooling fan, wiring etc)

Vacuum (Less than 0.5torr, 60hour )

10 Oil filling to storage tank(162,500 L)


11 Oil filling in transformer under vacuum
12 Oil Circulation in transformer
13 Touch up paint
14 Finishing works
15 502 TR #2
15 502 TR #3

TEST MAN

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2

WORKER (1FORMAN)

8 8 8 8 8 8 8 8 8 8 8 8 8

SUPERVISOR(HYUNDAI)
M
/
P

OPERATOR FOR OIL FILTERING M/C

DRY AIR CYLINDER (60bt)


E
Q
U
I
P
M
E
N
T

MOBIL CRANE (50Ton)


GENERATOR
FILTERING M/C (6,000 / hours)
VACCUM M/C & VACCUM GAUGE
OIL STORAGE TANK (CAPA : 30,000 litres) x 2
CHAIN BLOCK (5Ton)
TORQUE WRENCH(1~200N,M)

HHI A24-4TF(B)-1

Cable Chamber 2 Weeks

12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

51 52 53 54 55 56 57 58 59 60