You are on page 1of 2

Plant Information for Project Engineering and Offer Preparation

We appreciate the completion of the questionnaire as detailed as possible. The information provided
will help us to prepare and submit an optimal offer for your PV plant monitoring and control system.

General Plant Information


Plant designation Installed DC power [kWp]
Prospective date of ☐ Plant already in operation (retrofit)*
commissioning *Please complete system migration / retrofit information sheet.
Delivery address
Location of PV (if differing from
plant (address) location of PV
plant)
Name:
Technical contact
Requested date of
person/project Email:
offer
engineer
Phone:
Distance btw. plant
Planned Internet ☐ DSL ☐ LTE ☐ UMTS ☐ SatDSL ☐ substation on PV site
and grid
connection ☐ local monitoring w/o internet conn. ☐ up to 4 km ☐ 4 until 30 km
connection point
Inverters (INV)
Manufacturer Type / designation
No. of INV in every
No. of INV stations
station
☐ Central inverters ☐ String inverters
Inverter concept Inverter interface ☐ Ethernet ☐ RS485
☐ Inv. gateway (e.g. Huawei Smartlogger)
Combiner Box (CB) / Zone monitoring
Planned DC
☐ Inverter monitoring ☐ Zone monitoring ☐ String monitoring (inside combiner)
monitoring
Manufacturer / No. of CB per
Type CB inverter
☐ Ethernet ☐ RS485
CB Interface Alternatively: ☐ CB shall be supplied by skytron
☐ other gateway (e.g. via inverter)
Tracker
Manufacturer Type, designation
No. of control units
Interface ☐ Ethernet ☐ RS485
in every station
Energy Meters
Manufacturer Type, designation
Planned location of
☐ inverter station: …… pcs. per station ☐ Transmission station/substation: …… pcs.
installation and no.
Interface ☐ S0 ☐ RS485 (half duplex) ☐ Ethernet Please consult our compatibility list at www.skytron-energy.com

Requirements for monitoring system


FB 8.2.2.02 PV-Plant-Information-SystemDesign EN
01 10_2018
skytron® energy GmbH Franz- Ehrlich- Strasse 9 / 12489 Berlin Berliner Sparkasse Bank Code: 100 500 00 / A/C No.: 660 407 0113
Phone: +49 30 338 430 - 0 / Fax: +49 30 338 430 – 99 BIC BELADEBE / IBAN DE89 100 500 00 660 407 0113
service@skytron-energy.com / www.skytron-energy.com

Managing Director: Olaf Donner, Robert Schaefer Place of performance and jurisdiction is Berlin
VAT ID: DE 295 424 299 Register Court: Amtsgericht Berlin-Charlottenburg HRB 163298 B
Irradiation
☐ according to IEC61724 Class A ☐ desired amount: Pyrano. horiz./tilt.
measurement Ref. cell

☐ recomm. based on IEC61724 Cl. B Amb./Mod. Temp Weather st.

☐ no weather equipment needed


Inputs for status …….. digital inputs per data logger
notification …….. analog inputs per data logger
data logger ☐ AC power supply ☐ fan heater
☐ integrated splicebox
features ☐ AC power supply and UPS ☐ climate controller

Real-time SCADA Operation (on/off switching of devices)


Individual location of ……. pcs. in inverter station
☐ inverters ☐ circuit breakers:
switching of installation ……. pcs. in transmission station/substation

Interface of ☐ Modbus RTU ☐ Modbus TCP


breaker ☐ other protocol ☐ dry contact

Plant Control and Grid Stability Management

Grid operator

Please attach all available information concerning the grid operator’s power plant control requirements such as:

 Grid connection code  Grid connection approval  other technical documents or specifications from the grid operator
Active power
☐ Active power reduction/curtailment (grid operator set point) ☐ Frequency control P(f)
control/reduction
Reactive power
☐ Q/cosϕ set points ☐ Characteristic: ☐ Static value:
control (cos ϕ) e.g. cos ϕ(P), Q(U), cos ϕ(U), etc.

Interface of utility ☐ IEC 60870-5-101 ☐ Dry contacts (relay signals) ☐ DNP3

☐ IEC 60870-5-104 ☐ Analog Signals (e.g. 4..20mA) ☐ others:

Other requirements

Documents (please attach)


 Data sheet (inv., CB, tracker, meter)  Circuit diagrams (DC-Layout, AC-Layout , Network-Layout,…)  Plant layout plan

Comments

Please send the completed form by email to sales@skytron-energy.com.Thank you very much for your kind cooperation.
Be assured that all information will be treated confidentially.

FB 8.2.2.02 PV-Plant-Information-SystemDesign EN
01 10_2018
skytron® energy GmbH Franz- Ehrlich- Strasse 9 / 12489 Berlin Berliner Sparkasse Bank Code: 100 500 00 / A/C No.: 660 407 0113
Phone: +49 30 338 430 - 0 / Fax: +49 30 338 430 – 99 BIC BELADEBE / IBAN DE89 100 500 00 660 407 0113
service@skytron-energy.com / www.skytron-energy.com

Managing Director: Olaf Donner, Robert Schaefer Place of performance and jurisdiction is Berlin
VAT ID: DE 295 424 299 Register Court: Amtsgericht Berlin-Charlottenburg HRB 163298 B

You might also like