We appreciate the completion of the questionnaire as detailed as possible. The information provided
will help us to prepare and submit an optimal offer for your PV plant monitoring and control system.
Managing Director: Olaf Donner, Robert Schaefer Place of performance and jurisdiction is Berlin
VAT ID: DE 295 424 299 Register Court: Amtsgericht Berlin-Charlottenburg HRB 163298 B
Irradiation
☐ according to IEC61724 Class A ☐ desired amount: Pyrano. horiz./tilt.
measurement Ref. cell
Grid operator
Please attach all available information concerning the grid operator’s power plant control requirements such as:
Grid connection code Grid connection approval other technical documents or specifications from the grid operator
Active power
☐ Active power reduction/curtailment (grid operator set point) ☐ Frequency control P(f)
control/reduction
Reactive power
☐ Q/cosϕ set points ☐ Characteristic: ☐ Static value:
control (cos ϕ) e.g. cos ϕ(P), Q(U), cos ϕ(U), etc.
Other requirements
Comments
Please send the completed form by email to sales@skytron-energy.com.Thank you very much for your kind cooperation.
Be assured that all information will be treated confidentially.
FB 8.2.2.02 PV-Plant-Information-SystemDesign EN
01 10_2018
skytron® energy GmbH Franz- Ehrlich- Strasse 9 / 12489 Berlin Berliner Sparkasse Bank Code: 100 500 00 / A/C No.: 660 407 0113
Phone: +49 30 338 430 - 0 / Fax: +49 30 338 430 – 99 BIC BELADEBE / IBAN DE89 100 500 00 660 407 0113
service@skytron-energy.com / www.skytron-energy.com
Managing Director: Olaf Donner, Robert Schaefer Place of performance and jurisdiction is Berlin
VAT ID: DE 295 424 299 Register Court: Amtsgericht Berlin-Charlottenburg HRB 163298 B