Bilad Oman LLC-Steel Industries

Project Production Plan -Month/Year


Sl.No Job.No Client Work Order Details Total W.O. Date Of Weight No Receipt (MT) Workable (MT) NonWorkable (MT) Tons or % Affecting Workable Prod.(Due Type of structures WIP status as on :_________ Spill over from Last Month Prep weld Paint Comp. Balance Remarks As On :__________ Prod.Planned For Workable (MT) Wk:1 Wk:2 Wk:3 Wk:4 01-07 08-15 16-22 23-31

Total Work Order received In Month_______ Work Order Details Sl.No Job.No Client W.O. No Total Weight (MT) Date Of Receipt Workable (MT)

#DIV/0!

NonWorkable (MT)

Tons or % Affecting Workable Prod.(Due to N/A-

Type of structures

WIP status as on :___________ Cummulative workable Prep. weld Paint Comp. Balance Remarks

Total

#DIV/0!

0 Total Planned

0 0

PRD/DPF-7.0.1,REV_1

Bilad Oman L.L.C.-Steel Industries


Inspection Request
Sl No. Job No. Work Order Drg No. Item No.

Date :
Qty. Process WelderID

Report No.
Joint NDT Remarks

Offered By.

Signature

Inspection Comments All Items are Released for Blasting and Painting Except for the Hold Items as Commented Above Inspected By.

Signature

Date

Time

PRD/PDF-7.0.4,REV_1

BLASTING & PAINTING - February 2012


TOTAL DATE
1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb 29-Feb
0

BS-46 MT M-Hrs

BS-49 MT M-Hrs

BS-51 MT M-Hrs

BS-52 MT M-Hrs

MT

M-Hrs

TOTAL PRODUCTIV ITY

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Man-Hrs Consumption Report


BS-60 MT M-Hrs BS-61 MT M-Hrs BS-62 MT M-Hrs
National MANDAYS Production Strength Expat Supply Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

#DIV/0!

#DIV/0!

#DIV/0!

Absent

Rework

Flashings / Non Gutter/ IDLE MAN HOURS productivity Handrails/ Mhr's Sagrods/ Rod

Overtime

Available M-hrs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Bilad Oman L.L.C-Steel Industries


PRODUCTIVITY REPORT -Month /Year
Description Production Strength Absentism Rework IDLE Man Hours Flashing / Gutter / Handrails/ Anchor Bolts / Sagrods Non-Productive Hrs. Overtime Available Manpower Production Productivity Project No. Project Name UOM Man days Man days M-Hrs. M-Hrs. M-Hrs. M-Hrs. M-Hrs. M-Hrs. MT M-hrs/Ton Total FG. After Painting
Man-Hrs Preparation Man-Hrs Fit Up Man-Hrs Welding Man-Hrs Painting Total Man-Hrs Avg M-hrs/Ton Production

AS ON:
PAINTING

PREP

FITUP

WELD

TOTAL

0 0.00 0.00 0.00 0.00 0.00


Equivalent Production (MT)

Total FG
Work Order

0.00

Other Items Production--Report


Project No. Description Qty. Weight RM RATE (M.Hr's/UNIT)

Total Other Item's Equivalent Production

0.000

Rework Details
Project No. Work Order

Man Hour's

RATE (M.Hr's/UNIT)

Equivalent production (MT)

REMARKS

Total Rework Equivalent Production

0.000

PRD/DPF-7.0.8 REV_1

Bilad Oman L.L.C-Steel Industries


Job Card
Name : Trade :
Date

Department
Emp.
Month: Allocation to jobs (hours) BO-420051 BO-420052 BO-420054 BO-420062 BO-420063 P (hrs) OT (hrs) P (hrs) OT (hrs) P (hrs) OT (hrs) P (hrs) OT (hrs) P (hrs) OT (hrs) 5 8.5 8.5 0 2 2 8.5 8.5 2 2 3.5 0 0 2

TOTAL (HRS) 10.5 10.5 10.5 10.5 10.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL

22

3.5

2 Verified By

17

Signature Foreman

PRD/DPF-7.0.5 REV_1

Bilad Oman LLC -Steel Industries

Tool Box Talk


DEPARTMENT: SUBJECT: Sl.No HAZARDS Date : TIME: CONTROL MEASURES

Sl.

Employees-Present ( Name)

Employee NO

Designation

Signature

Training Conducted By
NAME SIGN DATE

HSE/TBT/01 REV_03

BILAD OMAN LLC


Steel Industries

IN-HOUSE TRAINING RECORD


Department : Subject :
S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Training Start Date : Training Duration : DETAILS OF TRAINING

Details of the Employee Trained


S.No. 1 2 3 4 5 6 7 8 9 10 Name Emp. No. Trade Signature

Declaration By Trainer
I certifiy that the above employees have understood the subject and attained required competence level with respect to training imparted.

Training Conducted By
Name Position Signature

HRD/DPF/10.0.1 Rev_0

BILAD OMAN LLC


Daily Production Plan
TOTAL
A
1 2 3 4 5 6

Month-Year
1 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 3 4 5 6 7 8 9 ## ## ## ## ## ## ## ## ## ## 20 ## 22 23 24 25 26 27 28 29

PREPARATION
Beam Proceesor Plate processor Sheet Processor Machining work BU-Auto BU-Manual

B
1 2 3 4

FABRICATION
LIGHT STRUCTURE MEDIUM STRUCTURE HEAVY STRUCTURE EXTRA HEAVY STRUCTURE

C
1 2 3 4

WELDING
LIGHT STRUCTURE MEDIUM STRUCTURE HEAVY STRUCTURE EXTRA HEAVY STRUCTURE

Page 10 of 14

BILAD OMAN LLC


Daily Production Plan
TOTAL
A D
1 2 3 4

Month-Year
1 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Primer Mid Final Actual Primer Mid Final Planned Primer Mid Final Actual Primer Mid Final Planned Primer Mid Final Actual Primer Mid Final Planned Primer Mid Final Actual Primer Mid Final 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 11 of 14 2 3 4 5 6 7 8 9 ## ## ## ## ## ## ## ## ## ## 20 ## 22 23 24 25 26 27 28 29

PREPARATION BLASTING
Auto Blast 1 Auto Blast 2 Manual Blast 1 Manual Blast 2

PAINTING

LIGHT STRUCTURE

MEDIUM STRUCTURE

HEAVY STRUCTURE

EXTRA HEAVY STRUCTURE

30

31

Page 12 of 14

30

31

Page 13 of 14