ROTATING EQUIPMENT DETAIL ON PACKAGE 2 & 3 AS OF MARCH 14 2014

PACKAGE N0. EPC 2 EPC 3 TOTAL PACKAGE N0. EPC 2 EPC 3 TOTAL PACKAGE N0. EPC 2 EPC 3 TOTAL PACKAGE N0. EPC 2 EPC 3 TOTAL PACKAGE N0. EPC 2 EPC 3 TOTAL COMPRESSOR SCOPE 25 0 25 PUMPS SCOPE 183 114 297 STEAM TURBINE SCOPE 0 4 4 AIR BLOWER SCOPE 0 24 24 FINAL GROUTING PENDING CLOSED not required not required FINAL ALIGNMENT PENDING CLOSED 25 0 0 0 25 0 FINAL ALIGNMENT PENDING CLOSED 179 4 93 21 272 25 FINAL ALIGNMENT PENDING CLOSED 4 4 0 0

FINAL GROUTING PENDING CLOSED 111 72 71 43 182 115 FINAL GROUTING PENDING CLOSED not required not required

FINAL GROUTING PENDING CLOSED not required not required

FINAL ALIGNMENT PENDING CLOSED 0 0 12 12 12 12 LOAD TEST PENDING CLOSED 39 0 17 0 56 0

OVERHEAD SCOPE 39 17 56

INSTALLATION PENDING CLOSED 5 34 3 14 8 48