County Submission
Arlington, Virginia
South & North Block
Sidewalk Closed
Ahead Cross at
11th Street
9’ - 10”
Legend
2. Sediment Tank
Walkway
9’ - 10”
Underwood Building
Bik
eL
25
Leadership Building eter
an
4. Signage
0’ L
rM
W
e
Wate
Tra
ils
.F.
on
ile
Blv
4’
r
Proposed Office
d
11’
11’
5. Covered Pedestrian Walkway
11th Street, North
M
at
Tra
Pa t Bo
W
er
Cla
r k un
es
ial
6. M Metro Station
ile
in
St
ren
gL dL
r
Tra
or
es
metro
a n ne
ag
don
tB
NORTH BLOCK
e
iler
ou
a
Lo
nd
Proposed Office
Blv
7. Dumpster
Concrete Staging
2
a
Tra
La
d (o
din
ne
ile
1
gZ
ne-
SOUTH BLOCK
Tra
Sidewalk Closed
on
wa
iler
8. Temporary Construction Fence
e
y) Eas st Bou Bike La
Ea
tB
Material Storage
9. Pedestrian Path
ou d La e
6’10’ 10’ Proposed Residential
nd
WM SHAF
n n
AIR
Lan e 2
Sidewalk Closed
ATA T
Sidewalk Closed Cross at
e
North Garfield
n
Cross at
1
North Garfield
Virginia
Dominion Power
Temporay
Virginia Power Sediment Tank Concrete Staging
Dominion Power Hoist Loading Zone 11. Material Hoist
6’ 10’ 10’
B. TRUCK ROUTE -TRUCKS WILL HAUL IN EQUIPMENT AND MATERIAL USING NORTH HIGHLAND STREET, WASHINGTON BLVD
CLARENDON BLVD., NORTH GARFIELD STREET, WILSON BLVD AND 11TH STREET. TRUCKS WILL NOT ENTER INTO RESIDENTIAL NEIGHBORHOODS
February 5, 2008
C. SIDEWALKS AT NORTH HIGHLAND ST. AND CLARENDON BLVD. CLOSED DURING DEMOLITION ACTIVITIES. THE COVERED WALKWAY WILL BE INSTALLED WHEN N
NEW CONSTRUCTION REACHES THE HEIGHT LIMITS INDICATED PER IBC CODE SECTION 3104 AND SECTION 3201.
D. NORTH BOUND LANE 2 ON NORTH HIGHLAND STREET TO BE OPEN DAILY, EXCEPT DURING HOURS OF CONSTRUCTION (9:00 AM TO 3:00 PM) FOR LOADING AND UNLOADING.
LANE CLOSURE WILL BEGIN 25’ SOUTH OF CLARENDON BLVD.
E. NO CHANGES IN THE LANE STRIPING WILL BE REQUIRED ON NORTH HIGHLAND ST. OR CLARENDON BLVD. DURING CONSTRUCTION.
F. PARKING METERS HI1109-HI1117, CL3002-CL3012, AND GA1102-GA1120 WILL BE OUT OF SERVICE AND METER HEADS WILL BE REMOVED FOR DURATION OF PROJECT.