Review of City Center Plaza encroachments and tree impacts

1986: 8th Street at Main Street looking north

Fall 1986: Construction begins

Holiday season - December 1986 January 1987:


5

1987: The Groves first


summer

western blocks

1990s: Wells Fargo Center and Boise Convention Center fill in the two
6

May 2012: Saturday Market at The Grove


7

Proposed Boise Center: Will enclose the final block Imaginative mix Active street level uses Lively architecture Great transparency Finally makes the tower urban Energize the Grove on daily basis

10

Basement/Valley Ride Transit Center level

Street level

11

Proposed encroachment

8th Street/north spoke existing

Upper level

12

Proposed 9-10 encroachment beginning at level 2

Approximate existing tree canopies

13

Revised 7-10 encroachment beginning at level 3

14

Original 80 right-of-way Original utilities 1986: 8th Street at Main Street looking south

15

Right-of-way revised to 40 in 1986

16

Existing Utilities 3 Utility lines near trees Valve boxes, laterals

Multiple manholes

17

Proposed utility trenches

18

19

20

21

22

9 trees will be affected by construction of the VRT space

23

9 trees will be affected by construction of the VRT space

24

May 2009: The Grove

25

9 existing trees in at-grade tree wells 5 replacement trees in structural tubs

Proposed ceiling beams Proposed columns

26

Soil volume matters, long term

27

28