WCDMA optimization is very important part in the life of the network. Mainly, the optimization contents the preparation, single site verification, RF optimization, parameters optimization.
Internal Use
Chapter 1 Introduction of Optimization Flow Chapter 2 The preparation for the Optimization Project
Internal Use
Document output
Internal Use
Chapter 1 Introduction of Optimization Flow Chapter 2 The Preparation for the Optimization Project
Internal Use
Internal Use
Getting the Network Information The radio network planning report The radio network optimization report (optional) The parameters tables about UTRAN The statistic data and the information reflected by users
Internal Use
Optimization tools and Optimization software Optimization tools UMTS scanner (DTI) UMTS test UE Digital camera, GPS, Compass YBT250 to position interference Optimization software Probe Assistant Traffic statistic data analysis Mapinfo
Internal Use
Chapter 1 Introduction of Optimization Flow Chapter 2 The preparation for the Optimization Project
Internal Use
Preparation Checking Warning Checking the state of cell Checking the parameters of radio access network Checking the configuration: scrambling code, configuration, neighbor cell table, handover parameters
power
Internal Use
Site verification
Checking the service function of each site Signal strength Feeder Jumper LA/RA update PS attach PS attach PS detach The voice call setup PDP active Intra-frequency handover Inter-system handover Inter-system cell-reselection.
Internal Use
10
Chapter 1 Introduction of Optimization Flow Chapter 2 The preparation for the Optimization Project
Internal Use
11
RF Optimization
Purpose
Optimize CPICH, services coverage and best server Decrease the interference at the minimum level Decrease the pilot pollution at the minimum level Optimize neighbor cells table Solve the call drop caused by RF
Internal Use
12
RF Optimization
Drive test
Preparation Tools Map Parameters Car, human resource Data analysis Poor coverage Best Server Pilot pollution Neighbor cells table Interference Call drop caused by RF
Internal Use
13
RF Optimization
HUAWEI Recommendation Description & Reason
Chapter 1 Introduction of Optimization Flow Chapter 2 The preparation for the Optimization Project
Internal Use
15
Parameters Optimization
Drive test
Drive test for special area Statistic analysis Conclusion
Internal Use
16
Decrease the access success rate Decrease the call drop Increase the quality of service
Internal Use
17
Drive test
The call setup test for voice service The continuous call test for voice service Idle mode test The call setup test for video phone service The continuous call test for voice service The call setup test for PS service The continuous call test for PS service
The test should be performed repeatedly to the position with problems to make sure that the problem is repeatable
Internal Use
18
Analyzing and finding out the solution for access failure (system bugs, power control parameter, cell selection and reselection parameter etc.) Analyzing and finding out the solution for drop call (system bugs, power control parameter, handover parameter etc.) Analyzing and finding out the solution for service quality related problems (system bugs, power control parameter, RLC parameter etc.)
Internal Use
19
Common Control Channel Power Allocation parameters RL Maximum Power parameters Intra-frequency Handover parameters Inter-frequency Handover parameters Inter-RAT Handover parameters Power Control parameters Access parameters Other related parameters
Internal Use
20
Operator offices, residence of VIP Key hotels or entertainment location Government location Locations of large company or group subscribers Locations tend to be cared , such as railway station or airport
Internal Use
21
Chapter 1 Introduction of Optimization Flow Chapter 2 The Preparation for the Optimization Project
Internal Use
22
Optimization Report
The optimization report should be presented after the project passes the customer acceptance. The optimization report should include:
Project background introduction Existing network status Acceptance criteria Optimization process Problem analysis and adjustment recommendation, and the effect for the implemented part Acceptance test and result Leftover problems and suggestions from the optimization point of view.