Location From To

Tentative
S/W
Schedule
Tentative
Concrete
Schedule
Tentative
Asphalt
Schedule
Scope of Work Traffic Impact
Budget
Estimates
Dewdney Avenue Courtney Street McCarthy Blvd July August October
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic will be restricted to single lane, two way traffic
during construction. Some residents and businesses
may have limited or no access to driveways during
construction. Transit bus stop locations will be affected,
though buses will continue during construction.
$527,000.00
McKee Crescent
(East Leg)
Shannon Road
(W)
Chisholm Road Contractor Contractor Contractor
Rebuild/LIP - Rebuild catch basin and manholes,
install new tops as required. Reinstall sidewalk, curb
and gutter. Rebuild road, install weeping tile and
asphalt pave.
Access will be restricted and at times closed (during
paving) for vehicle traffic during construction.
$640,200.00
Albert Street Dewdney Avenue 7th Avenue July June/July October
Recap (TL)- Minimal work will be done and may
include some rebuild catch basins and manholes,
install new tops and concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic will be restricted to single lane, two way traffic
during construction. Some residents and businesses
may have limited or no access to Albert Street
driveways during construction. Transit bus stop
locations will be affected and the bus may be re-routed
during construction.
$457,190.00
Broadway Avenue Ottawa Street Winnipeg Street Complete Complete Late June Recap - Asphalt mill and pave
Traffic and transit may be rerouted during paving.
Business and residents on the north side of Broadway
Ave. may have limited or no access during paving, there
is some alleyway access.
$165,500.00
Massey Road Grant Drive Parliament Avenue Yes Yes Yes
Recap (TL)- Minimal work will be done and may
include some rebuild catch basins and manholes,
install new tops and concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Access will be restricted and at times closed (during
paving) for vehicle traffic during construction. The bus
will be re-routed during construction.
$567,000.00
Langley Street
(South Leg)
Dunning Crescent
(S)
Jubilee Avenue Contractor Contractor Contractor
Rebuild/LIP - Relocate and install catch basins and
manholes as required. Reinstall sidewalk, curb and
gutter. Rebuild road, install weeping tile and asphalt
pave.
Access will be restricted and at times closed for vehicle
traffic during road rebuilding/paving.
$830,400.00
College Avenue Winnipeg Street Elliot Street
City Water
Work
--------
Contractor
Sewer Work
Contractor Contractor
Recap - Replace water connections as required.
Rebuild catch basins and manholes, install new tops
as required. Concrete replacement sidewalk, curb and
gutter as required. Mud jacking curb and gutter to
improve drainage. Asphalt milling and paving.
Access will be restricted and at times closed (during
paving) for vehicle traffic during construction. The bus
will be rerouted on an adjacent street during the
construction. Please contact transit for bus route
updates.
$791,500.00
2014 Street Infrastructure Renewal
1
Location From To
Tentative
S/W
Schedule
Tentative
Concrete
Schedule
Tentative
Asphalt
Schedule
Scope of Work Traffic Impact
Budget
Estimates
2014 Street Infrastructure Renewal
13th Avenue Lewvan Drive Pasqua Street Yes Yes Yes
Recap (TL)- Minimal work will be done and may
include some rebuild catch basins and manholes,
install new tops and concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Access will be restricted and at times closed (during
paving) for vehicle traffic during construction. The bus
will be re-routed during construction.
$123,300.00
Rae Street 23rd Avenue Hill Avenue
50% complete
May
50% complete
May
May/June Recap - Asphalt mill and pave
The access will be limited and the restrictions will may
cause some traffic delays at certain times of the day.
$208,000.00
12th Avenue Albert Street Lorne Street None None Early May
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Downtown congestion may occur at certain times of the
day for commuters. The bus may be rerouted during
paving.
$410,000.00
Gordon Road Queen Street Albert Street Complete Complete Mid May Recap - Asphalt mill and pave
Traffic will be restricted to single lane, two way traffic
during paving. Some residents and businesses may
have limited or no access to driveways during paving.
Transit bus stop locations will be affected in the paving
location, though buses will continue along Gordon Road
during paving.
$1,390,000.00
Broad Street
Wascana Drive
(Bridge)
College Avenue June June/July September
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic will be restricted to single lane, two way traffic
during construction. Some residents and businesses
may have limited or no access to driveways during
construction. Transit bus stop locations will be affected,
though buses will continue during construction.
$1,658,800.00
Broad Street 23rd Avenue Wascana Bridge June August September
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic will be restricted to single lane, two way traffic
during construction. Some residents and businesses
may have limited or no access to driveways during
construction. Transit bus stop locations will be affected,
though buses will continue during construction.
$380,000.00
Broad Street 14th Avenue Victoria Avenue Complete
50% complete
June/July
September Recap - Asphalt mill and pave
Traffic and transit may be rerouted during paving.
Business along Broad St. may have limited or no
access during paving, as there is no alternative access.
$540,000.00
2
Location From To
Tentative
S/W
Schedule
Tentative
Concrete
Schedule
Tentative
Asphalt
Schedule
Scope of Work Traffic Impact
Budget
Estimates
2014 Street Infrastructure Renewal
Dewdney Avenue Rupert Street Grosvenor Street May May May/June
Recap - Water and sewer installation of new high
capacity catch basins, asphalt mill and pave
Access ramps off and on Ring Rd. on north side of
Dewdney Ave. may be restricted or closed when
construction is underway. Traffic may be rerouted to
another street during construction.
$211,600.00
College Avenue Broad Street Winnipeg Street
City Water
Work
--------
Contractor
Sewer Work
Contractor Contractor
Recap - Replace water connections as required.
Rebuild catch basins and manholes, install new tops
as required. Concrete replacement sidewalk, curb and
gutter as required. Mud jacking curb and gutter to
improve drainage. Asphalt milling and paving.
Access will be restricted and at times closed (during
paving) for vehicle traffic during construction. Traffic will
be rerouted on the adjacent side of median during the
construction so that two way traffic is maintained during
this work.
$1,286,800.00
Elphinstone Street Dewdney Avenue 4th Avenue
City Water
Work
--------
Contractor
Sewer Work
Contractor Contractor
Recap - Replace water connections as required.
Rebuild catch basins and manholes, install new tops
as required. Concrete replacement sidewalk, curb and
gutter as required. Mud jacking curb and gutter to
improve drainage. Asphalt milling and paving.
Access will be restricted and at times closed (during
paving) for vehicle traffic during construction. The work
zone may be divided into two phases to facilitate traffic
flow. The bus will be rerouted down an adjacent street
during the work. Please contact transit for bus route
updates.
$916,200.00
Gordon Road Albert Street Grant Road Contractor Contractor Contractor
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. The turn bay for
west/south bound traffic will be lengthened to
accommodate the increased traffic volume. Mud
jacking curb and gutter to improve drainage. Asphalt
milling and paving.
Sewer and Concrete works will require traffic
restrictions, creating single lane traffic at times. Traffic
will be restricted to single lane, two way traffic during
paving. Some residents and businesses may have
limited or no access to driveways during paving. Transit
bus stop locations will be affected in the paving location,
though buses will continue along Gordon Road during
paving.
$547,300.00
Rochdale Blvd
Devonshire Drive
(Rail Crossing)
Arnason Street None None Yes
Rail Crossing - Rail company to install new steel
lines. After which City crews will mill and pave to
restore the pavement for traffic crossing over tracks.
Traffic accommodation not available at this time. $420,000.00
3
Location From To
Tentative
S/W
Schedule
Tentative
Concrete
Schedule
Tentative
Asphalt
Schedule
Scope of Work Traffic Impact
Budget
Estimates
2014 Street Infrastructure Renewal
Albert Street 25th Avenue 23rd Avenue Early June May/June June
Recap (TL)- Minimal work will be done and may
include some rebuild catch basins and manholes,
install new tops and concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic will be restricted to single lane, two way traffic
during construction. Some residents and businesses
may have limited or no access to Albert Street
driveways during construction. Transit bus stop
locations will be affected and the bus may be re-routed
during construction.
$512,800.00
McIntosh Street 4th Avenue 2nd Avenue Contractor Contractor Contractor
Recap - Sewer rebuilds and concrete work. Asphalt
mill and pave
Access will be restricted and at times closed (during
paving) for vehicle traffic during the construction.
$459,900.00
3rd Avenue Pasqua Street Elphinstone Street June Contractor Yes
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic accommodation not available at this time. $383,000.00
Truesdale Drive Quance Street Victoria Avenue May
Contractor
June
June
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic accommodation not available at this time. $761,000.00
Broad Street 9th Avenue N Elmview Road None Yes October
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Davet at 9th Avenue will be removed and replaced with
cantilever signals, which will require some traffic
reconfiguration as per Traffic and Signals Department.
$542,000.00
Dewdney Avenue Park Street Rupert Street Yes Contractor Yes
Recap - Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and paving.
Traffic accommodation not available at this time. $283,000.00
Rodenbush Drive 12th Avenue N (W) 12th Avenue N (E)
City Water May
--------
Contractor
Sewer Work
Contractor Contractor
Recap - Replace water connections and hydrants as
required. Rebuild catch basins and manholes, install
new tops as required. Concrete replacement sidewalk,
curb and gutter as required. Mud jacking curb and
gutter to improve drainage. Asphalt milling and
paving.
Access will be restricted and at times closed (during
paving) for vehicle traffic during the construction. The
contractor work zone will be divided into two phases,
from 12th Avenue North to Broad Street to
accommodate the through traffic north of Rodenbush
Drive. The Tender closes April 23rd, so the contract
should be awarded by May12th.
$1,794,700.00
4
Location From To
Tentative
S/W
Schedule
Tentative
Concrete
Schedule
Tentative
Asphalt
Schedule
Scope of Work Traffic Impact
Budget
Estimates
2014 Street Infrastructure Renewal
Prince of Wales
Drive
Victoria Avenue Victoria Avenue None
Contractor
May
June
Rebuild - Left turn lane widening, working in
conjunction with Traffic and Signals Department. This
work will be done by the Contractor. The City crews
will complete the paving and line painting.
Traffic will at times become congested on Victoria
Avenue during some of the construction works. The
trucking industry will be notified in advance of the work
to reroute trucks.
$600,000.00
Smith Street 12th Avenue 11th Avenue April Yes Yes
Rebuild - Reconstruction of street and sidewalks,
upgrades to streetscape and signals.
Access will be restricted and at times closed for vehicle
traffic during the construction.
$2,500,000.00
Ring Road
Crossover west of
McDonald Street
Crossover west of
Broad Street
None None May
Build - Two crossovers to be used for the upcoming
recap of Ring Road
The trucking industry will be provided advance notice of
the restrictions to reduce the truck volume during
construction. The traffic will be slowed in the work
zones so it will become congested at certain times
during the day.
Ring Road Albert Street Victoria Avenue None None July/August
Recap - Asphalt mill and pave inlay on driving lanes
only. Mill and pave several access ramps as required.
Rebuild the NW off ramp from Ring Road to Victoria
south/east bound traffic to repair failure.
The trucking industry will be provided advance notice of
the restrictions to reduce the truck volume during
construction. The traffic will be slowed in the work
zones so it will become congested at certain times
during the day.
$4,700,000.00