Electrical Transient Analyzer Program
Number of Buses:
Number of Branches:
1 0 2 3
1 0 0 1 0 0 2
Total Load V-Control
XFMR2 Total Tie PD Impedance Line/Cable Reactor XFMR3
Swing
Maximum No. of Iteration:
System Frequency:
Unit System:
Project Filename:
Output Filename:
Precision of Solution:
Method of Solution: Adaptive Newton-Raphson Method
99
0.0001000
60.00 Hz
English
practica1
C:\Users\labctr\Desktop\flacal\practica1\flujo1.lfr
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 2
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Adjustments
Transformer Impedance:
Reactor Impedance:
Tolerance
Overload Heater Resistance:
Transmission Line Length:
Cable Length:
Temperature Correction
Transmission Line Resistance:
Cable Resistance:
Apply
Adjustments /Global
Individual
Percent
Apply
Adjustments
Individual
/Global Degree C
Individual
Individual
Individual
Individual
Yes
Yes
No
No
No
Yes
Yes
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 3
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Bus Input Data
Sub-sys
Generic Constant I Constant Z Constant kVA Initial Voltage Bus
Mvar MW Mvar MW Mvar MW Mvar MW Ang. % Mag. kV ID
Load
Bus1 1 0.0 115.000 100.0
Bus2 1 0.0 13.200 100.0
Bus3 1 0.0 13.200 100.0 9.000 0.000
0.000 0.000 9.000
Total Number of Buses: 3
0.000 0.000 0.000 0.000 0.000
ID kV
Generation Bus
Sub-sys Type
Voltage
% Mag. Angle MW Mvar Max Min
Generation Mvar Limits
% PF
Bus1 1 Swing 0.0 115.000 100.0
0.000 0.000
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 4
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Line/Cable Input Data
ID Library Size T (C)
Line/Cable
Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)
Adj. (ft)
#/Phase % Tol.
Length
Y R X
Cable1 15NCUS3 3/0 328.1 1 0.089655 0.036000 75 0.0
Line / Cable resistances are listed at the specified temperatures.
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 5
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
2-Winding Transformer Input Data
ID MVA Prim. kV Sec. kV % Z1 X1/R1 Prim. Sec.
Transformer % Tap Setting
% Tol.
Rating Z Variation
+ 5% - 5%
Phase Shift
Type Angle % Z
Adjusted
Phase
T1 4.80 23.70 0 0 0 0 0 0.000 4.8000
3-Phase
Dyn 25.000 115.000 13.200
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 6
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Branch Connections
ID From Bus To Bus R X Z Type
CKT/Branch % Impedance, Pos. Seq., 100 MVA Base Connected Bus ID
Y
T1 Bus1 0.81 19.18 19.20 Bus2 2W XFMR
Cable1 Bus2 1.69 0.68 1.82 Bus3 Cable
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 7
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
LOAD FLOW REPORT
Bus
ID kV
Voltage
Ang.
% Mag.
Generation
MW Mvar
Load
MW Mvar
Load Flow
MW Mvar Amp ID %PF
XFMR
%Tap
Bus1 * 115.000 0.0 100.000 0.160 8.977 Bus2 8.977 0.160 45.1 100.0
0 0
Bus2 13.200 -1.0 99.911 Bus3 8.970 0.005 392.7 100.0
0 0 0 0
Bus1 -8.970 -0.005 392.7 100.0
Bus3 13.200 -1.0 99.760 0.000 8.957 Bus2 -8.957 0.000 392.7 100.0
0 0
*
# Indicates a bus with a load mismatch of more than 0.1 MVA
Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 8
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Bus Loading Summary Report
ID
Bus
kV
Directly Connected Load
MW Mvar MVA % PF Amp Rated Amp Loading MW Mvar MW Mvar
Constant kVA Constant Z Constant I
Percent
Generic
MW Mvar
Total Bus Load
Bus1 115.000 8.978 45.1 100.0 0 0 0 0 0 0 0 0
Bus2 13.200 8.970 392.7 100.0 0 0 0 0 0 0 0 0
Bus3 13.200 8.957 392.7 100.0 0 0 8.957 0 0 0 0 0
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 9
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Branch Loading Summary Report
ID Type
Loading
Amp
%
Capability
(MVA)
MVA %
Loading (output)
CKT / Branch Cable & Reactor
Transformer
Loading (input)
% MVA
Ampacity
(Amp)
Cable1 Cable 210.17 392.70 186.85 *
T1 Transformer 25.000 8.978 35.9 8.970 35.9
* Indicates a branch with operating load exceeding the branch capability.
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 10
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Branch Losses Summary Report
ID MW Mvar MW Mvar kW kvar From To
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Vd
in Vmag
6.5 154.6 100.0 99.9 0.09 T1 8.977 0.160 -8.970 -0.005
13.6 5.5 99.9 99.8 0.15 Cable1 8.970 0.005 -8.957 0.000
20.1 160.1
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 11
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
Alert Summary Report
Cable
95.0 100.0
Bus
Marginal Critical
95.0 100.0
Loading
% Alert Settings
95.0 100.0
95.0 100.0
95.0 100.0
Line
Transformer
Reactor
Panel
95.0 100.0
95.0 98.0
102.0 105.0
95.0 100.0
95.0 100.0
95.0 100.0
100.0
Generator Excitation
Bus Voltage
UnderExcited (Q Min.)
OverExcited (Q Max.)
UnderVoltage
OverVoltage
Protective Device
Generator
Inverter/Charger
100.0 95.0
Critical Report
Device ID Type Rating/Limit Condition Unit Operating % Operating Phase Type
186.9 3-Phase Overload Cable1 Cable Amp 210,17 392,70
Location:
Engineer:
Study Case: LF
12.5.0E
Page: 12
SN: ESPELTGAEC
Filename: practica1
Project:
ETAP
Contract:
Date: 04-21-2014
Revision: Base
Config.: Normal
0.000 0.000 0.000
0.000 0.000 0.000
Lagging 100.00 8.957
Total Generic Load:
Total Constant I Load:
0.000 0.000
0.160 0.020
Number of Iterations: 3
System Mismatch:
Apparent Losses:
SUMMARY OF TOTAL GENERATION , LOADING & DEMAND
0.000
Lagging
Lagging
0.000 8.957
0.000 0.000
99.98 8.978 0.160 8.977
0.000 0.000 0.000
99.98 8.978 0.160 8.977
% PF MVA Mvar MW
Total Static Load:
Total Motor Load:
Total Demand:
Source (Non-Swing Buses):
Source (Swing Buses):