You are on page 1of 20

Calculation of velocity and flow at various slopes using Manning formula

V, Q @ 100% full pipe

max slope

min
slope

5.00%

0.50%

4.00%

0.40%

3.33%

0.33%

2.86%

0.29%

2.50%

0.25%

2.22%

0.22%

2.00%

0.20%

1.67%

0.17%

1.43%

0.14%

1.25%

0.13%

PI

3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159

Dia

(m)

Roughness
factor for
concrete pipes

0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.6
0.7
0.8

0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011

Rh

0.050
0.063
0.075
0.088
0.100
0.113
0.125
0.150
0.175
0.200

Cross section area (m2)

Slope 0.2 %

Slope 0.3 %

100% full

V (m/s)

Q (m3/s)

V (m/s)

(m2)
0.031
0.049
0.071
0.096
0.126
0.159
0.196
0.283
0.385
0.503

0.0020
1.016
1.148
1.272
1.390

0.0020
0.025
0.042
0.067
0.101

0.0030
0.886
0.981
1.073
1.160
1.245
1.406
1.558
1.703

Slope 0.35 %

Slope 0.4 %

Slope 0.45 %

Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s)


0.0030
0.063
0.094
0.135
0.185
0.244
0.397
0.600
0.856

0.0035
0.847
0.956
1.060
1.159
1.253
1.345
1.518
1.683
1.839

0.0035
0.042
0.068
0.102
0.146
0.199
0.264
0.429
0.648
0.925

0.0040
0.780
0.906
1.023
1.133
1.239
1.340
1.437
1.623
1.799
1.966

0.0040
0.025
0.044
0.072
0.109
0.156
0.213
0.282
0.459
0.692
0.988

0.0045
0.828
0.960
1.085
1.202
1.314
1.421
1.525
1.722
1.908
2.086

0.0045
0.026
0.047
0.077
0.116
0.165
0.226
0.299
0.487
0.734
1.048

Slope 0.5 %
V (m/s)
0.0050
0.872
1.012
1.143
1.267
1.385
1.498
1.607
1.815
2.011
2.198

Slope 0.55 %

Q (m3/s) V (m/s)
0.0050
0.027
0.050
0.081
0.122
0.174
0.238
0.316
0.513
0.774
1.105

0.0055
0.915
1.062
1.199
1.329
1.453
1.571
1.685
1.903
2.109
2.306

Q (m3/s)
0.0055
0.029
0.052
0.085
0.128
0.183
0.250
0.331
0.538
0.812
1.159

Calculation of load factor %


at 50% full

at 75% full

Line N-32

Line

0.47

0.32

Line N-33-14

0.34

0.22

Line N-32

0.35

0.24

Line N-32-10

0.57

0.75

Line N-32

0.39

0.26

Line N-32-7

0.35

0.23

Line N-32

0.35

0.24

Line N-32-6

0.24

0.16

Line N-32

0.41

0.27

10

Line N-32-4

0.35

0.23

11

Line N-32

0.29

0.19

12

Line N-32

0.31

0.21

13

Line N-32-1

0.50

0.67

14

Line N-32

0.31

0.21

Line N-18-2

0.18

0.12

Line N-18-2-11

0.59

0.39

Line N-18-2

0.28

0.19

Line N-18-2

0.36

0.24

Line N-18-2-7

0.29

0.19

Line N-18-2

0.30

0.20

Line N-18-2-5

0.29

0.19

Line N-18-2

0.35

0.23

Line N-18-2

0.38

0.26

10

Line N-18-2-2

0.47

0.32

11

Line N-18-2

0.42

0.28

Section
1
2
3

Calculation of velocity and flow at various slopes using Manning formula


V, Q @ 75% full pipe

max slope

min
slope

5.00%

0.50%

4.00%

0.40%

3.33%

0.33%

2.86%

0.29%

2.50%

0.25%

2.22%

0.22%

2.00%

0.20%

1.67%

0.17%

1.43%

0.14%

1.25%

0.13%

PI

3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159

Dia

(m)

Roughness
factor for
concrete pipes

0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.6
0.7
0.8

0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011

Rh

0.050
0.063
0.075
0.088
0.100
0.113
0.125
0.150
0.175
0.200

Cross section area (m2)

Slope 0.2 %

Slope 0.3 %

100% full

75% full

V (m/s)

Q (m3/s)

V (m/s)

(m2)
0.031
0.049
0.071
0.096
0.126
0.159
0.196
0.283
0.385
0.503

(m2)
0.024
0.037
0.053
0.072
0.094
0.119
0.147
0.212
0.289
0.377

0.0020
1.016
1.148
1.272
1.390

0.0020
0.018
0.032
0.051
0.075

0.0030
0.886
0.981
1.073
1.160
1.245
1.406
1.558
1.703

Slope 0.35 %

Slope 0.4 %

Slope 0.45 %

Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s)


0.0030
0.047
0.071
0.101
0.138
0.183
0.298
0.450
0.642

0.0035
0.847
0.956
1.060
1.159
1.253
1.345
1.518
1.683
1.839

0.0035
0.031
0.051
0.076
0.109
0.150
0.198
0.322
0.486
0.693

0.0040
0.780
0.906
1.023
1.133
1.239
1.340
1.437
1.623
1.799
1.966

0.0040
0.018
0.033
0.054
0.082
0.117
0.160
0.212
0.344
0.519
0.741

0.0045
0.828
0.960
1.085
1.202
1.314
1.421
1.525
1.722
1.908
2.086

0.0045
0.020
0.035
0.057
0.087
0.124
0.170
0.225
0.365
0.551
0.786

Slope 0.5 %
V (m/s)
0.0050
0.872
1.012
1.143
1.267
1.385
1.498
1.607
1.815
2.011
2.198

Slope 0.55 %

Q (m3/s) V (m/s)
0.0050
0.021
0.037
0.061
0.091
0.131
0.179
0.237
0.385
0.580
0.829

0.0055
0.915
1.062
1.199
1.329
1.453
1.571
1.685
1.903
2.109
2.306

Q (m3/s)
0.0055
0.022
0.039
0.064
0.096
0.137
0.187
0.248
0.404
0.609
0.869

Calculation of load factor %


at 50% full

at 75% full

Line N-32

Line

0.63

0.42

Line N-33-14

0.45

0.30

Line N-32

0.47

0.31

Line N-32-10

0.75

0.75

Line N-32

0.53

0.35

Line N-32-7

0.46

0.31

Line N-32

0.47

0.31

Line N-32-6

0.32

0.21

Line N-32

0.55

0.37

10

Line N-32-4

0.46

0.31

11

Line N-32

0.38

0.26

12

Line N-32

0.41

0.28

13

Line N-32-1

0.67

0.67

14

Line N-32

0.41

0.27

Line N-18-2

0.24

0.16

Line N-18-2-11

0.79

0.53

Line N-18-2

0.38

0.25

Line N-18-2

0.48

0.32

Line N-18-2-7

0.39

0.26

Line N-18-2

0.40

0.27

Line N-18-2-5

0.39

0.26

Line N-18-2

0.47

0.31

Line N-18-2

0.51

0.34

10

Line N-18-2-2

0.63

0.42

11

Line N-18-2

0.56

0.37

Section
1
2
3

Calculation of velocity and flow at various slopes using Manning formula


V, Q @ 50% full pipe

max slope

min
slope

5.00%

0.50%

4.00%

0.40%

3.33%

0.33%

2.86%

0.29%

2.50%

0.25%

2.22%

0.22%

2.00%

0.20%

1.67%

0.17%

1.43%

0.14%

1.25%

0.13%

PI

3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159

Dia

(m)

Roughness
factor for
concrete pipes

0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.6
0.7
0.8

0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011

Rh

0.050
0.063
0.075
0.088
0.100
0.113
0.125
0.150
0.175
0.200

Cross section area (m2)

Slope 0.2 %

Slope 0.3 %

Slope 0.35 %

Slope 0.4 %

Slope 0.45 %

Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s)

Slope 0.5 %
V (m/s)

Slope 0.55 %

100% full

50% full

V (m/s)

Q (m3/s)

V (m/s)

Q (m3/s) V (m/s)

(m2)

(m2)

0.0020

0.0020

0.0030

0.0030

0.0035

0.0035

0.0040

0.0040

0.0045

0.0045

0.0050

0.0050

0.0055

Q (m3/s)
0.0055

0.031
0.049
0.071
0.096
0.126
0.159
0.196
0.283
0.385
0.503

0.016
0.025
0.035
0.048
0.063
0.080
0.098
0.141
0.192
0.251

1.016
1.148
1.272
1.390

0.012
0.021
0.034
0.050

0.886
0.981
1.073
1.160
1.245
1.406
1.558
1.703

0.031
0.047
0.067
0.092
0.122
0.199
0.300
0.428

0.847
0.956
1.060
1.159
1.253
1.345
1.518
1.683
1.839

0.021
0.034
0.051
0.073
0.100
0.132
0.215
0.324
0.462

0.780
0.906
1.023
1.133
1.239
1.340
1.437
1.623
1.799
1.966

0.012
0.022
0.036
0.055
0.078
0.107
0.141
0.229
0.346
0.494

0.828
0.960
1.085
1.202
1.314
1.421
1.525
1.722
1.908
2.086

0.013
0.024
0.038
0.058
0.083
0.113
0.150
0.243
0.367
0.524

0.872
1.012
1.143
1.267
1.385
1.498
1.607
1.815
2.011
2.198

0.014
0.025
0.040
0.061
0.087
0.119
0.158
0.257
0.387
0.553

0.915
1.062
1.199
1.329
1.453
1.571
1.685
1.903
2.109
2.306

0.014
0.026
0.042
0.064
0.091
0.125
0.165
0.269
0.406
0.579

Calculation of load factor %


at 50% full

at 75% full

Line N-32

Line

0.95

0.63

Line N-33-14

0.67

0.45

Line N-32

0.71

0.47

Line N-32-10

1.13

0.75

Line N-32

0.79

0.53

Line N-32-7

0.70

0.46

Line N-32

0.71

0.47

Line N-32-6

0.48

0.32

Line N-32

0.82

0.55

10

Line N-32-4

0.70

0.46

11

Line N-32

0.58

0.38

12

Line N-32

0.62

0.41

13

Line N-32-1

1.00

0.67

14

Line N-32

0.62

0.41

Line N-18-2

0.36

0.24

Line N-18-2-11

1.18

0.79

Line N-18-2

0.57

0.38

Line N-18-2

0.72

0.48

Line N-18-2-7

0.58

0.39

Line N-18-2

0.60

0.40

Line N-18-2-5

0.58

0.39

Line N-18-2

0.70

0.47

Line N-18-2

0.77

0.51

10

Line N-18-2-2

0.95

0.63

11

Line N-18-2

0.83

0.56

Section
1
2
3

Hydraulic load in Fixture units (F.U) calculation sheet


Engineering college
Fixture
Lavatory
Floor drain
Sink
W.C flush valve
Drinking fountain
Total

Hydraulic load (F.U)


1
2
1.5
6
0.5

Qty.
190
30
100
190
50
round to

Total F.U
190
60
150
1140
25
1565
1800
FU

Computer, science, community , applied medical science,


A-B4, A-B5, A-B6, A-B8, A-B9, A-B10, A-B11, & A-B13buildings
Fixture
Hydraulic load (F.U)
Lavatory
1
Floor drain
2
Sink
1.5
W.C flush valve
6
Drinking fountain
0.5
Total

Qty.
150
30
40
130
30
round to

Medical college
Fixture
Lavatory
Shower drain
Floor drain
Sink
W.C flush valve
Drinking fountain
Total

Hydraulic load (F.U)


1
1.5
2
1.5
6
0.5

Qty.
234
20
30
110
200
50
round to

Total F.U
150
60
60
780
15
1065
1200
FU

Total F.U
234
30
60
165
1200
25
1714
2000
FU

Building AB-17
Fixture
Lavatory
Floor drain
Sink
W.C flush valve
Drinking fountain
Total

Hydraulic load (F.U)


1
2
1.5
6
0.5

Qty.
64
8
10
46
4
round to

Buildings AB-15, AB-15


Fixture
Lavatory
Floor drain
Sink
W.C flush valve
Drinking fountain
Total

Hydraulic load (F.U)


1
2
1.5
6
0.5

Qty.
64
8
10
46
4
round to

Building AB-18
Fixture
Lavatory
Floor drain
Sink
W.C flush valve
Drinking fountain
Total

Hydraulic load (F.U)


1
2
1.5
6
0.5

Qty.
32
8
8
32
4
round to

Building AB-19
Fixture
Lavatory
Floor drain
Sink
W.C flush valve
Drinking fountain
Total

Hydraulic load (F.U)


1
2
1.5
6
0.5

Qty.
40
8
6
40
4
round to

Total F.U
64
16
15
276
2
373
500
FU

Total F.U
64
16
15
276
2
373
500
FU
Total F.U
32
16
12
192
2
254
500
FU

Total F.U
40
16
9
240
2
307
500
FU

villa
Fixture
Lavatory
Shower drain
Floor drain
Cloth washer (commercial)
Cloth washer (domesticl)
Bidet
Sink
W.C flush valve
Wash room group
Drinking fountain
Bathtub
Total

Hydraulic load (F.U)


1
1.5
2
2
1.5
1
1.5
6
8
0.5
1.5

Qty.
6
6
0
0
0
1
6
0

round to

Total F.U
6
9
0
0
0
0
1.5
36
0
0
0
52.5
70
FU

Hotel
Fixture
Lavatory
Shower drain
Floor drain
Cloth washer (commercial)
Sink
W.C flush valve
Drinking fountain
Bathtub
Total

Hydraulic load (F.U)


1
1.5
2
2
1.5
6
0.5
1.5

Qty.
200
200
30
10
50
200
30
20
round to

Students Dormitories (1 buildings)


Fixture
Lavatory
Shower drain
W.C flush valve
kitchenette
Total

Hydraulic load (F.U)


1
1.5
6
2

Qty.
80
80
80
8
round to

Total F.U
200
300
60
20
75
1200
15
30
1900
2000

Total F.U
80
120
480
16
696
750

apartment
Fixture
Lavatory
Shower drain
Floor drain
Cloth washer (commercial)
Sink
W.C flush valve
Total

Hydraulic load (F.U)


1
1.5
2
2
1.5
6

Qty.
3
2
2
1
2
2
round to

Total F.U
3
3
4
2
3
12
27
40

1. Use Table 3.5 (Step #1) to determine number of fixture units


2. Then use Table 3.6 (Step #2) to convert Fixture Units to GPM
3. Enter the GPM in the GPM box under "Design Flow Rate" on the Pump Design Guide.

Step #1:
Table 3.5: Demand Weight of Fixtures, in Fixture Units.
Weight,
Fixture Type

Occupancy

Number

in

of

Fixture Units

Fixtures

Total

Bathtub

Private

x ____ =

_____

Bathtub

Public

x ____ =

_____

Bedpan Washer

Public

10

x ____ =

_____

Bidet

Private

x ____ =

_____

Bidet

Public

x ____ =

_____

Combination Sink & Tray

Private

x ____ =

_____

Dental Unit or Cuspidor

Public

x ____ =

_____

Dental Lav.

Private

x ____ =

_____

Dental Lav.

Public

x ____ =

_____

Drinking Fountain

Private

x ____ =

_____

Drinking Fountain

Public

x ____ =

_____

Kitchen Sink

Private

x ____ =

_____

Kitchen Sink

Public

x ____ =

_____

Lavatory

Private

x ____ =

_____

Lavatory

Public

x ____ =

_____

Laundry Tray

Private

x ____ =

_____

Laundry Tray

Public

x ____ =

_____

Shower, each Head

Private

x ____ =

_____

Shower, each Head

Public

x ____ =

_____

Sink, service

Private

x ____ =

_____

Sink, service

Public

x ____ =

_____

Urinal, pedestal

Public

10

x ____ =

_____

Urinal (Wall lip)

Public

x ____ =

_____

Urinal stall

Public

x ____ =

_____

Urinal w/ flush tank

Public

x ____ =

_____

Wash Sink, each set of faucets

Public

x ____ =

_____

Water Closet, Flush Valve

Private

x ____ =

_____

Water Closet, Flush Valve

Public

10

x ____ =

_____

Water Closet, Flush Tank

Private

x ____ =

_____

Water Closet, Flush Tank

Public

x ____ =

_____

TOTAL FIXTURE FLOW UNITS =

_____

Step #2:

Table 3.6: Conversions - Gallons Per Minute to Fixture Units


Fixture Units

Fixture Units

Fixture Units

Fixture Units

Fixture Units

Fixture Units

Flow (GPM)

L/s

(Flush Tank)

(Flush Tank)

Flow (GPM)

L/s

(Flush Tank)

(Flush Tank)

Flow (GPM)

L/s

(Flush Tank)

(Flush Tank)

0.063

45

2.835

107

37

145

9.135

611

521

0.126

46

2.898

111

39

150

9.45

638

559

0.189

47

2.961

115

42

155

9.765

665

596

0.252

48

3.024

119

44

160

10.08

692

631

0.315

49

3.087

123

46

165

10.395

719

666

0.378

50

3.15

127

48

170

10.71

748

700

0.441

51

3.213

130

50

175

11.025

778

739

0.504

10

52

3.276

135

52

180

11.34

809

775

0.567

12

53

3.339

141

54

185

11.655

840

811

10

0.63

13

54

3.402

146

57

190

11.97

874

850

11

0.693

15

55

3.465

151

60

200

12.6

945

831

12

0.756

16

56

3.528

155

63

210

13.23

1018

1009

13

0.819

18

57

3.591

160

66

220

13.86

1091

1091

14

0.882

20

58

3.654

165

69

230

14.49

1173

1173

15

0.945

21

59

3.717

170

73

240

15.12

1254

1254

16

1.008

23

60

3.78

175

76

250

15.75

1335

1335

17

1.071

24

62

3.906

185

82

260

16.38

1418

1418

18

1.134

26

64

4.032

195

88

270

17.01

1500

1500

19

1.197

28

66

4.158

205

95

280

17.64

1583

1583

20

1.26

30

68

4.284

215

102

290

18.27

1668

1668

21

1.323

32

70

4.41

225

108

300

18.9

1755

1775

22

1.386

34

72

4.536

236

116

310

19.53

1845

1845

23

1.449

36

74

4.662

245

124

320

20.16

1926

1926

24

1.512

39

76

4.788

254

132

330

20.79

2018

2018

25

1.575

42

78

4.914

264

140

340

21.42

2110

2110

26

1.638

44

80

5.04

275

148

350

22.05

2204

2204

27

1.701

46

10

82

5.166

284

158

360

22.68

2298

2298

28

1.764

49

11

84

5.292

294

168

370

23.31

2388

2388

29

1.827

51

12

86

5.418

305

176

380

23.94

2480

2480

30

1.89

54

13

88

5.544

315

186

390

24.57

2575

2575

31

1.953

56

14

90

5.67

326

195

400

25.2

2670

2670

32

2.016

58

15

92

5.796

337

205

410

25.83

2765

2765

33

2.079

60

16

94

5.922

348

214

420

26.46

2862

2862

34

2.142

63

18

96

6.048

359

223

430

27.09

2960

2960

35

2.205

66

20

98

6.174

370

234

440

27.72

3060

3060

36

2.268

69

21

100

6.3

380

245

450

28.35

3120

3150

37

2.331

74

23

105

6.615

406

270

500

31.5

3620

3620

38

2.394

78

25

110

6.93

431

295

550

34.65

4070

4070

39

2.457

83

26

115

7.245

455

329

600

37.8

4480

4480

40

2.52

86

28

120

7.56

479

365

700

44.1

5380

5380

41

2.583

90

30

125

7.875

506

396

800

50.4

6280

6280

42

2.646

95

31

130

8.19

533

430

900

56.7

7280

7280

43

2.709

99

33

135

8.505

559

460

1000

63

8300

8300

44

2.772

103

35

140

8.82

585

490

Manning Formula

3.142
3.142
3.142
3.142
3.142
3.142
3.142
3.142
3.142
3.142

Hydraulic radius for(Rh=D/4)


round pipes =
Area (m2)
Dia
n
Rh
Af
Ah
Slope
(m)
(m2) (m2) 0.0030
0.2
0.011
0.05
0.031 0.016 0.676
0.25
0.011
0.0625 0.049 0.025 0.784
0.3
0.011
0.075 0.071 0.035 0.886
0.35
0.011
0.0875 0.096 0.048 0.981
0.4
0.011
0.1
0.126 0.063 1.073
0.45
0.011
0.1125 0.159 0.080 1.160
0.5
0.011
0.125 0.196 0.098 1.245
0.6
0.011
0.15
0.283 0.141 1.406
0.7
0.011
0.175 0.385 0.192 1.558
0.8
0.011
0.2
0.503 0.251 1.703

145
164.4

V (m/s)

Slope
0.0035
0.730
0.847
0.956
1.060
1.159
1.253
1.345
1.518
1.683
1.839

V (m/s)
Slope
0.0040
0.780
0.906
1.023
1.133
1.239
1.340
1.437
1.623
1.799
1.966

Slope
0.0050
0.872
1.012
1.143
1.267
1.385
1.498
1.607
1.815
2.011
2.198

438.4858

Af
Ah
0.0030
0.021 0.011
0.038 0.019
0.063 0.031
0.094 0.047
0.135 0.067
0.185 0.092
0.244 0.122
0.397 0.199
0.600 0.300
0.856 0.428

Af

Q (m3/s)
Ah

0.0035
0.023
0.011
0.042
0.021
0.068
0.034
0.102
0.051
0.146
0.073
0.199
0.100
0.264
0.132
0.429
0.215
0.648
0.324
0.925
0.462

0.073
0.0364
0.0194

Q (m3/s)
Af
Ah
0.0040
0.025 0.012
0.044 0.022
0.072 0.036
0.109 0.055
0.156 0.078
0.213 0.107
0.282 0.141
0.459 0.229
0.692 0.346
0.988 0.494

Af
Ah
0.0050
0.027 0.014
0.050 0.025
0.081 0.040
0.122 0.061
0.174 0.087
0.238 0.119
0.316 0.158
0.513 0.257
0.774 0.387
1.105 0.553

2160

max f.u
0.3
0.5
1400
2500
2240 3900
4800 7000

2505.6

480

from chart
l/s
19.4
29
39.9

Manning Formula

max slope

min slope

5.00%

0.50%

4.00%

0.40%

3.33%

0.33%

2.86%

0.29%

2.50%

0.25%

2.22%

0.22%

2.00%

0.20%

1.67%

0.17%

1.43%

0.14%

1.25%

0.13%

3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159
3.14159

Hydraulic radius for round pipes =


Area (m2)
Dia
n
Rh
Af
Ah
(m)
(m2)
(m2)
0.2
0.011
0.05
0.031
0.016
0.25 0.011 0.0625
0.049
0.025
0.3
0.011 0.075
0.071
0.035
0.35 0.011 0.0875
0.096
0.048
0.4
0.011
0.1
0.126
0.063
0.45 0.011 0.1125
0.159
0.080
0.5
0.011 0.125
0.196
0.098
0.6
0.011
0.15
0.283
0.141
0.7
0.011 0.175
0.385
0.192
0.8
0.011
0.2
0.503
0.251

us
imperial

1 gpm
1 gpm

0.076
0.063

l/s
l/s

(Rh=D/4)
V (m/s)

Slope
0.0020
0.004
0.004
0.003
0.003

Slope
0.0030
0.886
0.981
1.073
1.160
1.245
1.406
1.558
1.703

Slope Slope
0.0035 0.0040
0.780
0.847 0.906
0.956 1.023
1.060 1.133
1.159 1.239
1.253 1.340
1.345 1.437
1.518 1.623
1.683 1.799
1.839 1.966

Slope
0.0045
0.828
0.960
1.085
1.202
1.314
1.421
1.525
1.722
1.908
2.086

Slope Slope
0.0050 0.0055
0.872 0.915
1.012 1.062
1.143 1.199
1.267 1.329
1.385 1.453
1.498 1.571
1.607 1.685
1.815 1.903
2.011 2.109
2.198 2.306

Af
Ah
0.0020
0.002 0.012
0.003 0.021
0.004 0.034
0.006 0.050

Af

Ah
0.0030
0.063 0.031
0.094 0.047
0.135 0.067
0.185 0.092
0.244 0.122
0.397 0.199
0.600 0.300
0.856 0.428

Q (m3/s)
Af
Ah
Af
Ah
0.0035
0.0040
0.025 0.012
0.042 0.021 0.044 0.022
0.068 0.034 0.072 0.036
0.102 0.051 0.109 0.055
0.146 0.073 0.156 0.078
0.199 0.100 0.213 0.107
0.264 0.132 0.282 0.141
0.429 0.215 0.459 0.229
0.648 0.324 0.692 0.346
0.925 0.462 0.988 0.494

Q (m3/s)

as per cnps 2005

Af
Ah
0.0045
0.026 0.013
0.047 0.024
0.077 0.038
0.116 0.058
0.165 0.083
0.226 0.113
0.299 0.150
0.487 0.243
0.734 0.367
1.048 0.524

Af
Ah
0.0050
0.027 0.014
0.050 0.025
0.081 0.040
0.122 0.061
0.174 0.087
0.238 0.119
0.316 0.158
0.513 0.257
0.774 0.387
1.105 0.553

Af
Ah
0.0055
0.029 0.014
0.052 0.026
0.085 0.042
0.128 0.064
0.183 0.091
0.250 0.125
0.331 0.165
0.538 0.269
0.812 0.406
1.159 0.579

max f.u
from chart
0.25% 0.50%
l/s
1400
19
2500
29
2240 3900
39.9
4800 7000

Calculation of velocity (V) and flow rate (Q) at various slopes using Manning formula at 75% full pipe

Pipe Dia

m
0.2
0.25
0.3
0.35
0.4
0.45
0.5
0.6
0.7
0.8

mm
200
250
300
350
400
450
500
600
700
800

Rh

Roughness
factor for
concrete pipes

Hydraulic
Diameter

0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.011

0.050
0.063
0.075
0.088
0.100
0.113
0.125
0.150
0.175
0.200

Cross section
area

Slope 0.2 %

75% full

V (m/s)

Q (m3/s)

(m2)
0.024
0.037
0.053
0.072
0.094
0.119
0.147
0.212
0.289
0.377

0.0020
1.016
1.148
1.272
1.390

0.0020
0.018
0.032
0.051
0.075

Slope 0.3 %

Slope 0.35 %

Slope 0.4 %

Slope 0.45 %

Slope 0.5 %

Slope 0.55 %

Slope 0.6 %

V (m/s) Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s) V (m/s) Q (m3/s)

V (m/s) Q (m3/s) V (m/s) Q (m3/s)

V (m/s)

Q (m3/s)

0.0030
0.886
0.981
1.073
1.160
1.245
1.406
1.558
1.703

0.0050
0.872
1.012
1.143
1.267
1.385
1.498
1.607
1.815
2.011
2.198

0.0060
0.956
1.109
1.252
1.388
1.517
1.641
1.760
1.988
2.203
2.408

0.0060
0.023
0.041
0.066
0.100
0.143
0.196
0.259
0.422
0.636
0.908

0.0030
0.047
0.071
0.101
0.138
0.183
0.298
0.450
0.642

0.0035
0.847
0.956
1.060
1.159
1.253
1.345
1.518
1.683
1.839

0.0035
0.031
0.051
0.076
0.109
0.150
0.198
0.322
0.486
0.693

0.0040
0.780
0.906
1.023
1.133
1.239
1.340
1.437
1.623
1.799
1.966

0.0040
0.018
0.033
0.054
0.082
0.117
0.160
0.212
0.344
0.519
0.741

0.0045
0.828
0.960
1.085
1.202
1.314
1.421
1.525
1.722
1.908
2.086

0.0045
0.020
0.035
0.057
0.087
0.124
0.170
0.225
0.365
0.551
0.786

0.0050
0.021
0.037
0.061
0.091
0.131
0.179
0.237
0.385
0.580
0.829

0.0055
0.915
1.062
1.199
1.329
1.453
1.571
1.685
1.903
2.109
2.306

0.0055
0.022
0.039
0.064
0.096
0.137
0.187
0.248
0.404
0.609
0.869

MANHOLE NO.
Section

Line #

Line N-32

Line N-33-14

Line N-32

Line N-32-10

Line N-32

Line N-32-7

Line N-32

Line N-32-6

Building

A-B19,

Student Centre

D-B1

Mosque

A-B8

Faculty of Education

A-B9

Faculty of Business Admin.

A-B10

Faculty of Tourism

A-B11

Faculty of Business Admin.

A-B12

Faculty of Tourism

A-B17

Univ. Admin.

A-B16

Grand stadium

Line N-32

10

Line N-32-4

A-B3

Faculti of Science

11

Line (futur)

A-B18

Restaurant

12

Line N-32

13

Line N-32-1

14

Line N-32

A-B14

Faculty of Engineerin

Line N-18-2

Line N-18-2-11

A-B7

Faculty of Social studies

A-B6

English language centre

Line N-18-2

A-B5

Faculty of Agriculture

Line (futur)

Line N-18-2

Line N-18-2-7

A-B15

Central Library

Line (futur)

A-B3

Faculty of Science

Line N-18-2

Line (futur)

A-B18

Restaurant

10

Line N-18-2-5

A-B2

F. of Applied Science

11

Line N-18-2

12

Line N-18-2-2

13

Line N-18-2

A-B4

Qmax.

Qpeak/Qave

Qmax,total

Qmin.

Lit/Sec

Lit/Sec

Lit/person.day

Lit/Sec

Lit/Sec

100

1.736

8.877

5.113

1500

100

1.736

8.877

5.113

2625

100

3.038

14.045

4.623

14.045

6.510

26.239

4.030

26.239

3.038

14.045

4.623

TO

MH17

MH14

MH3

MH14

MH14

MH10

5625

MH3

MH10

MH10

MH7

MH3

MH7

MH7

MH6

MH5

MH6

Qmin/Qave

Qmin,total

Slope

Diameter

2625

100

2625

100

10875
2182

100

2182

100

15239

3.038

14.045

4.623

12.587

45.053

3.579

2.525

12.070

4.779

2.525

12.070

4.779

17.638

59.412

3.368

17.753

Lit/Sec

mm

0.741

0.5

200

28.091
45.053
24.140
59.412

0.370

0.213

0.370

0.213

0.709

0.233

0.709

0.4

250

1.450

0.223

1.450

0.4

300

0.709

0.233

1.418

0.4

250

0.709

0.233

2.868

0.228

2.868

0.4

350

0.572

0.227

1.145

0.4

250

0.572

0.227

4.013

0.228

4.013

0.4

400

0.517

0.223

0.594

0.4

250

0.077

0.189

2000

100

2.315

11.238

4.855

700

50

0.405

2.376

5.865

20.358

66.590

3.271

66.590

4.607

0.226

4.607

0.4

450

13.614

MH6

MH4

17939

MH3

MH4

2182

100

2.525

12.070

4.779

12.070

0.572

0.227

0.572

0.4

250

MH5

2000

50

1.157

5.619

4.855

5.619

0.259

0.223

0.259

0.5

200

MH4

MH1

22121

24.041

75.725

3.150

75.725

5.437

0.226

5.437

0.4

450

MH4

MH1

6545

7.575

29.709

3.922

29.709

2.046

0.270

2.046

0.4

200

MH1

MH32 (Line N--)

28666

31.616

95.047

3.006

95.047

7.484

0.237

7.484

0..4

450

MH13

MH11

3150

100

3.646

16.310

4.474

16.310

0.876

0.240

0.876

0.5

300

MH3

MH11

2625

100

3.038

14.045

4.623

0.709

0.233

1.119

0.4

250

1636

100

1.894

9.531

5.034

0.410

0.216

MH11

MH9

7411

8.578

32.896

3.835

32.896

2.364

0.276

2.364

0.4

350

MH9

2182

2.525

12.070

4.779

12.070

0.572

0.227

0.572

0.5

250

MH9

MH7

9593

11.103

40.649

3.661

40.649

3.188

0.287

3.188

0.5

350

MH2

MH7

2000

50

1.157

5.619

4.855

5.619

0.259

0.223

0.259

0.5

200

MH7

2182

100

2.525

12.070

4.779

12.070

0.572

0.227

0.572

0.5

250

MH5

13775

14.786

50.719

3.430

50.719

4.499

0.304

4.499

0.5

400

MH5

2000

50

1.157

5.619

4.855

5.619

0.259

0.223

0.259

0.5

200

MH3

MH5

2857

100

3.307

15.056

4.553

15.056

0.782

0.237

0.782

0.5

250

MH5

MH2

18632

19.250

62.538

3.249

62.538

6.148

0.319

6.148

0.6

400

MH3

MH2

3000

3.472

15.671

4.513

15.671

0.828

0.238

0.828

0.5

200

MH2

MH-- (Line N-18)

21632

22.722

71.861

3.163

71.861

7.432

0.327

7.432

0.6

400

Faculty of Veterniary

Faculty of Medicine

Qave

1500

FROM

MH7

A-B1

Consumption
Numper of People

100

100

100

23.577

Q at 75% full Velocity

Lit/Sec

m/sec

20.56

0.87

33.34

0.91

54.21

1.02

33.34

0.91

81.77

1.13

33.34

0.91

116.75

1.24

33.34

0.91

159.83

1.34

33.34

0.91

20.56

0.87

159.83

1.34

20.56

0.78

159.83

1.34

60.61

1.14

33.34

0.91

81.77

1.13

37.27

0.91

91.42

1.27

20.56

0.87

37.27

1.01

130.53

1.38

20.56

0.87

37.27

0.91

142.98

1.52

20.56

0.87

142.98

1.52

You might also like