USHATEK SDN BHD

CONTRACT NO: TNB: 706/2007 TYPICAL WORK PROGRAMME FOR 1 (ONE) SITE Revision: 01
ESTABLISHMENT OF 275KV/132KV/33KV PUCHONG PERDANA SUB-STATION Date:
SUBJECT: SLOPE PROTECTION AT LOCATION NO. IP4-1(2B), IP4(3A), IP4/1(3A), IP4/2(3A) AND IP5(3A) Prepared by: Mohdrs
Year
Month
Description of Activities Date
Day No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
LEGEND NOTES
Work Programme 1). THE ABOVE WORK PROGRAMME IS FOR ONE TYPICAL SITE ONLY.
2). TOTAL COMPLETION PERIOD FOR ONE SITE IS 15 DAYS.
SITE CLEARANCE 9
10 HANDING OVER
b). INSTALLATION WORK
a). DELIVERY MATERIAL
8 SOIL STABILIZATION
7 BACKFILLING WORKS
c). INSTALLATION WORKS
a). DELIVERY MATERIAL
b). EXCAVATION WORKS
BAKAU PILE WORKS
a).DELIVERY MATERIAL
b). INSTALLATION WORK
GABION WORK
a). Client provide drawings
2
7/20/2010
I
t
e
m
s
1
4 PREPARE PLATFORM
SURVEY & SETTING OUT 3
LETTER OF AWARD
MOBILIZATION
5
6
(444874 - P)
C:\...\...\233338364.xls.ms_office.Xls (Work Programme ) Page 1 of 47 Printed: 6/10/2014 @ 7:52 AM