Any operative working in the vicinity of Spray Painting b. Fall of person on same level c. Fall of person into/through hole d. Fall of object from height e. Fall of object at same Level Control Measures f. Protruding objects g. Flying objects 1. Safe system of work agreed before work commences to include ventilation. No sources h. Manual handling/lifting of ignition. i. Machinery 2. Correct use of Personal Protective Equipment to include:- Mask, Goggles, Hard Hat, J. Vehicular Boots, Gloves and Respiratory Equipment. k. Mechanical lifting 3. Storage facility for paint, appropriate signs displayed warning of hazards. l. Mechanical handling 4. MSDS provided by Subcontractor. Evidence that employees are aware of PPE required m. Confined space 5. Hose/cable routes where applicable managed to prevent trip hazards. n. Cleaning/purging 6. Fire extinguisher (dry powder) positioned at work face and in Stores. o. Maintenance 7. Area barriered off/notices posted. (See Company Procedure when working in confined spaces). p. Pressure systems 8. Interface with other trades is to be in strict compliance with Permit to Work for potential q. Electrical flammable atmospheres. r. Fire HM 9. Correct handling and use of equipment. s. Explosion/bursting t. Water 10. Periodic Health check up shall be carried out as per the Dubai Municipality Guidelines. u. Asphyxiation v. Inhalation HH w. Contact x. Noise & vibration y. Ionising radiations z. Non-ionising radiations aa. Handtools bb. Electrical handtools. cc. Climatic dd. Hazardous substances HM ee. Collapse of stacking/structure ff. Housekeeping gg. Inadequate lighting hh. Weld failure ii Other NICO INTERNATIONAL RISK ASSESSMENT RISK ASSESSMENT NUMBER: 27 ACTIVITY: Hand Painting