Persons at Risk Hazard Type Risk Level

Painter a. Fall of person from height


Any operative working in the vicinity of Spray Painting b. Fall of person on same level
c. Fall of person into/through hole
d. Fall of object from height
e. Fall of object at same Level
Control Measures f. Protruding objects
g. Flying objects
1. Safe system of work agreed before work commences to include ventilation. No sources h. Manual handling/lifting
of ignition. i. Machinery
2. Correct use of Personal Protective Equipment to include:- Mask, Goggles, Hard Hat, J. Vehicular
Boots, Gloves and Respiratory Equipment. k. Mechanical lifting
3. Storage facility for paint, appropriate signs displayed warning of hazards. l. Mechanical handling
4. MSDS provided by Subcontractor. Evidence that employees are aware of PPE required m. Confined space
5. Hose/cable routes where applicable managed to prevent trip hazards. n. Cleaning/purging
6. Fire extinguisher (dry powder) positioned at work face and in Stores. o. Maintenance
7. Area barriered off/notices posted. (See Company Procedure when working in confined spaces). p. Pressure systems
8. Interface with other trades is to be in strict compliance with Permit to Work for potential q. Electrical
flammable atmospheres. r. Fire HM
9. Correct handling and use of equipment. s. Explosion/bursting
t. Water
10. Periodic Health check up shall be carried out as per the Dubai Municipality Guidelines. u. Asphyxiation
v. Inhalation HH
w. Contact
x. Noise & vibration
y. Ionising radiations
z. Non-ionising radiations
aa. Handtools
bb. Electrical handtools.
cc. Climatic
dd. Hazardous substances HM
ee. Collapse of stacking/structure
ff. Housekeeping
gg. Inadequate lighting
hh. Weld failure
ii Other