The document provides details to improve the end anchorage of a corroded column by welding new rebar of the same size to existing beam reinforcement. The construction sequence involves hacking the beam's top cover to expose the compression reinforcement, welding the new column rebar to achieve the prescribed lapping length, applying anti-corrosive coating, and filling the hacked portion with non-shrink grout. This method can only be used if the rebar size is less than 25mm.
The document provides details to improve the end anchorage of a corroded column by welding new rebar of the same size to existing beam reinforcement. The construction sequence involves hacking the beam's top cover to expose the compression reinforcement, welding the new column rebar to achieve the prescribed lapping length, applying anti-corrosive coating, and filling the hacked portion with non-shrink grout. This method can only be used if the rebar size is less than 25mm.
The document provides details to improve the end anchorage of a corroded column by welding new rebar of the same size to existing beam reinforcement. The construction sequence involves hacking the beam's top cover to expose the compression reinforcement, welding the new column rebar to achieve the prescribed lapping length, applying anti-corrosive coating, and filling the hacked portion with non-shrink grout. This method can only be used if the rebar size is less than 25mm.
A Short Guide to the Types and Details of Constructing a Suspension Bridge - Including Various Arrangements of Suspension Spans, Methods of Vertical Stiffening and Wire Cables Versus Eyebar Chains