-1 Balu Phapale
2 JV On Month Start
3 P.S. Parmar
As Per
Requirment
4 P. S. Parmar
As Per
requirment
6 R. Kumar On Daly Basis
7 MF Daily Basis
1 Jaspreet
2 Jaspreet
3
4
MINUTES OF MEETING
Circle Name: Production Review Circle Leader : Press Shop offic
Action Plan
IC From the Qlty B4 Material Hand Over to despatch Qlty will Provide the IC Report to Despatch for Each order in a uniform Way or regular Basis .
Members Absent: Nil
Members Present :
N. Narayan Rajesh
B. Plapla
D.K. Gupta P.S.Parmar
Chairman Name : MR .Niraj Narayan
DKG
SO-65000026 (Lac Del ) Production not complited will get despatch in April
SO-65000048(Hecla Quebec ) Production will Hand over the Material On 31-03 for the Qlty Clearance
Material Issue From the Store No One is allowed for the Lifting the Material with out issue Slip regarding to Production or Project work
DPR Report from the Hand Lining DPR will Be on regular Basis from the HL / Auto Clave Department To PPC
MC Breakdown
Jaspreet
Despatch
Prepared By Approved By Plant Head
Maintenance will Provide the PM Plan in the Beginning of Month Start Only any Other Request for Maintenance will be
Considered aas a Break down .
Replacement of damaged Mould Part
Mould Depart ment will Provide the Damaged Mould Part List to PPC For the replacement for the Same . And the
removal for the Damaged Part from the Sap will be in the Scope of Mould Department .
In House Fabrication Plan for CI ,PI, Short insert
For CI ,PI and Short insert which req Fabricated in-house "PPc Will directly Provide the Plan to Fabrication as per thr
Requirement "