Shree Samarth Academy’s Shree Samarth Polytechnic

EMM ESS AIRCORN PVT.LTD


Maharashtra State Board of Technical Education

A project report on-


Industrial Training
Partial Fulfillment of the Requirement for the Diploma in
Mechanical Engineering

By-

Ajit Anil Yenare


[2014660164]
GUIDED BY-

[ Prof. KADUS .R.K. ]

Shree Samarth Academy’s Shree Samarth Polytechnic

Mhasane Phata, Ahmednagar (414301)

Maharashtra State Board of Technical Education


2

CERTIFICATE
CERTIFICATE

This is to certify that the project work entitledWrite a report on

Industrial Training

Submitted By :-

Ajit Anil Yenare


[2014660164]

In the partial fulfillment of Diploma in Mechanical Engineering has


been Satisfactory carried out under my guidance as per the requirement
of Maharashtra State Board of Technical Education, Mumbai during the
academic year 2021-2022.

Date- / /202
Place- Mhasne phata,Parner

GUIDE HOD PRINCIPAL

(Prof .KADUS.R.K ) (Prof . Kadus R.K.) ( Prof .Anarase B.V.)


3

Acknowledgments

I would like to express my deep and sincere gratitude to my Guide Kadus.R.K. Department
of Mechanical Engineering, for guiding me to accomplish this lndustrialTraning I express
my deep gratitude to Prof . Kadus R.K. Head of Mechanical EngineeringDepartment, for
his valuable guidance and constant encouragement. I am very much thankful to Prof
.Anarase B.V., Principal, Shree Samarth Academy’s Shree Samarth Polytechnic, Mhasane
Phata.

I would also like to acknowledge the EMM ESS AIRCORN PVT.LTD. , for allowing
me to undergo the Industrial Training at their Service Center .Mr. Pratik Lagad Sir
are acknowledged for providing the information and help during Training period.

Last but not least, it would not have possible for me to complete the training without
support of my family members. Constant encouragement and support of my Father
and Mother made me possible to complete the work.

Place: Mhasne Phata

Date :-
4

Table Of Content

 Certificate

 Acknowlagement

 Company Profile

 My Role And Responsibility During Traning

 Conclution

 Weekly Overview Of Industrial Training Activities 1st


Week
 Weekly Overview Of Industrial Training Activities 2nd
Week
 Weekly Overview OF Industrial Training Activities 3rd
Week
 Weekly Overview Of Industrial Training Activities 4 the
Week

 Weekly Overview Of Industrial TrainingActivities 5 the


Week

 Weekly Overview Of Industrial Training Activities 6th


Week
5

Company Profile

Name Of Company :- EMM ESS AIRCORN PVT LTD.

Address :- RANJANGAON MIDC PUNE


PUNE , 412209.

Phone No :- 9834909170.

Email :- vsy@emmessaircorn.com.

Total No Of Employees :- 380.

Work :- Servicing And Maintenance Of AC, Chillers,


VRV Systems, Ductable AC.
6

My Role And Responsibility During The

Training

• Daily Join The Duty On 10:00 To 06:00 And Sunday W/Off.

• Daily Attend The Toll Box Metting.

• Check The Work Planner.

• Check Our Tool Bag Before Start The Work

• Remove The Power Supply Connection Before Work [If Required]

• Ensure The Work Place Is Free For Work

• Take Help Of Skilled Person During Difficult Work


7

Knowledge That I Have Acquired During

Training

➢ Team Work

i. Brtter Problem Solving

ii. Increased Potention For Innovation

iii. Enhanced Personal Growth

➢ Leader Ship Quality

i. It Will Help Me Clarify My Vision

ii. It Will Improve My Carrier


Prospect

iii. It Will Boost My Confidence

iv. Peovides Appropriate Resource


8

➢ Time Management

i. Clear Daily Goal

ii. Reaching Goal Faster

iii. Increase Productivity

➢ Communication Skll

i. It Will Help Me To Increased Job


Satisfaction

ii. It Will Help Me To Problem


Solving

iii. It Will Help Me To Team


Building
9

Diffrant Types Of Tool And Equipment

1. Tube Cutter :-

2 Brazzing Torch :-

3. Gauge And Charging Line ;-


10

4. Clamp Meter;- 5. Vaccume Pump :-

6. Drill Machine :- 7. Tube Bender :-


11

Diffrant Types Of Mashines

1. VRV System :-
12

2. CHILLER :-

3. WATER COOLER :-
13

4. SPLIT AC :-
• AC Indoor Unit ;-

• AC Out Door Unit :-


14

Conclusion

It was a wonderful experience for me while during industrial visit. This visit
has developed my thinking skill, practical knowledge related to the
industrial environment. This visit give me a real insight into the
maintenance, department industry. I enjoy each every bit work I had into
this project.
There industrial visit gives a lot of information about various aspect of
production, maintenance as well operation of a company. The
dissemination of knowledge by the support organization analysis of
company we found that there is a bigger market for the industrial
revolutions. confectionery in unorganized retail store if proper supply of
good without breakage is there. pravat India dominates the volume
dominated market due to its brand equity and better production strategy.

Thank You

Ajit Anil Yenare


15

Weekly Overview Of Industrial Training

Avtivities

1st Week

Date Day Activity Carried Out

04-07-2022 Monday • Introduction Of All Team Members


• Introduction Of All Utility Members And
Office Staff
05-07-2022 Tuesday • Identification Of Tools

06-07-2022 Wednesday • Servicing of 1.5 TR Split AC

07-07-2022 Thursday • 2 TR Split AC Main PCB Replace And


Servicing

08-07-2022 Friday • 12 TR Chiller Servicing Done

09-07-2022 Saturday • 20 HP VRV System Inverter PCB Replace

10-07-2022 Sunday • Holiday


16

2nd Week

Date Day Activity Carried Out

11-07-2022 Monday • 7.5 TR Chiller Servicing


• Chiller Gas Pressure Cheak

12-07-2022 Tuesday • 19 HP VRV Indoor Filter Cleaning


• And Outdoor Unit Condenssor Cleaning

13-07-2022 Wednesday • 150 litter Water Cooler Compressor


Replace And Gas Charging

14-07-2022 Thursday • 40 HP VRV Machine Compressor


Change And Gas Charging

15-07-2022 Friday • 1.5 TR AC IDU Main PCB Cheak And


Replace

16-07-2022 Saturday • 25 HP VRV Inverter PCB Cheak And


Replace

17-07-2022 Sunday • Holiday


17

3rd Week

Date Day Activity Carried Out

18-07-2022 Monday • 1.5 TR AC Servicing


• AC Gas Pressure Cheaking

19-07-2022 Tuesday • 250 Litter Water Cooler Leakage Finding


• And Gas Charging

20-07-2022 Wednesday • 2.0 TR Split AC Compressor Cheak,


• Replace And Gas Charging

21-07-2022 Thursday • 1.5 TR AC [Nos – 2 ] Leakage Testing


And Gas Charging

22-07-2022 Friday • 7.5 TR Ductable AC Gas Charging


• 7.5 TR Ductable AC Gas Charging

23-07-2022 Saturday • 1.5 TR AC Indoor Blower Moter Cheak


• And Replace

24-07-2022 Sunday • Holiday


18

4th Week

Date Day Activity Carried Out

25-07-2022 Monday • Split AC [Nos – 06 ] IDU And ODU


Servicing Done

26-07-2022 Tuesday • 40 HP VRV Machine Fault Finding


And Main PCB Replace
• Indoor Filter Cleaning
• Outdoor Condenssor Coil Cleaning

27-07-2022 Wednesday • Panel AC Servicing


• 2.0 TR Casset AC Servicing

28-07-2022 Thursday • 18 HP VRV Inverter PCB Cheaking


And Replace It

29-07-2022 Friday • 2.0 TR AC ODU Condenssor Fan


Motor Cheak And Replace

30-07-2022 Saturday • 1.5 TR Window AC Foult Finding And


Temp Sensor Replace

31-07-2022 Sunday • Holiday


19

5th Week

Date Day Activity Carried Out

01-08-2022 Monday • 45 HP VRV Machine Compressor Replace


And Vaccumeing And Gas Charging

02-08-2022 Tuesday • 20 HP VRV Machine IDU Coil Sensor


Replace
• IDU And ODU Servicing

03-08-2022 Wednesday • 150 Litter Water Cooler Capacitor


Replace
• Condenssor Coil Cleaning

04-08-2022 Thursday • 12 TR Ductable AC Compressor


Cheak And Replace
• Leakage Testing And Gas Charging

05-08-2022 Friday • 2.0 TR Inverter Split AC ODU Main PCB


Cheak And Replace

06-08-2022 Saturday • 1.5 TR Inverter AC Compressor Replace


• Leakage Testing And Gas Charging

07-08-2022 Sunday Holiday


20

6th Week

Date Day Activity Carried Out

08-08-2022 Monday • 12 TR AHU Fault Finding ,

• Cooling Tower Fan Motor Replace

09-08-2022 Tuesday • 18 HP VRV Machine Cheaking

• Condenssor Fan Motor Replace

10-08-2022 Wednesday • 320 Litter Water Cooler Cheaking

• Relay And OLP Replace

11-08-2022 Thursday • Water Disspenssor Cheak And


• Replace The Compressor
• Leakage Tasting And Gas Charging
12-08-2022 Friday • 2.0 TR Split AC Compressor Replace

• And Gas Charging


13-08-2022 Saturday • 40 HP VRV Machine Inverter PCB
Cheak And Replace

14-08-2022 Sunday Holiday