Professional Documents
Culture Documents
Description AMOUNT
Labor- Fitting the new bath, Plastering walls where required and preparation of all
surfaces
for the installation of the new suite, shelves on the bath and tile, Build Tiling wall 1,250.00
up the ceiling and the floor (laying underlay ifneeded), Fitting all needed
accessories, Painting and decorating the ceiling and Cleaning and leaving the
bathroom in a usable condition.
TOTAL OF THE ABOVE £1,500.00