Client:Mr.AliShiyam
(TotalFllorarea68.00x4=272Sq.m)
Option(A)WithRCCstructure
BillNo
1
2
3
4
5
6
7
8
9
10
11
12
Description
Amount(Mvr)
Preliminaries
Groundworks
Concreteworks
Masonryandplastering
Doorsandwindows
FloorandwallTilling
PuttyandPainting
Ceiling
Hydraulicsanddrainage
Electricalinstallation
Metalwork
Roof
Grandtotal
TotalcostwithRCCconcretestructure
Rate per m2
Rate per ft2
MVR
60,000.00
75,000.00
1,400,000.00
375,000.00
210,000.00
200,000.00
150,000.00
95,000.00
170,000.00
185,000.00
50,000.00
80,000.00
3,050,000.00
MVR 3,050,000.00
MVR
MVR
11,214.00 /m2
1,042.19 /ft2
Option(B)WithPrefabricatedstructure
Totalcostwithprefabricatedstructure
Rate per m2
Rate per m2
MVR
MVR
US$
1,258,272.00
4,626.00 /m2
300.00 /m2
Option(C)WithPrefabricatedstructure
Totalcostwithprefabricatedstructure
Rate per m2
Rate per m2
MVR
MVR
US$
2,097,120.00
7,710.00 /m2
500.00 /m2