You are on page 1of 1

PRESSURE EQUIPMENT

INSPECTION REQUIREMENTS
IDENTIFICATION
Unit:
Train3- Unit-02
Tag No:
03-V0222
Equipment Name:
No.2 Reclaimer Overhead KO
Drum
VESSEL/CONFINED SPACE ENTRY REQUIRED: YES NO
CLEANING & PURGING REQUIREMENTS
Water Wash Caustic Wash Fuel Gas Purge Air Purge
Steaming N2 Purge Other: As Per Oerations Re!uirement
OPENING FOR INSPECTION
an !a"s #es No Oen man "a# $.
$nternal an !a"s #es No
Channel Co%er #es No
&un'le remo%al #es No
Other Opening #es No
Comments:
SUPPORT SERVICES REQUIRED FOR INSPECTION
(emister )emo%al #es No %& re!uired remove demister &or insection o& to head.
Schoepentoeter remo%al #es No
)aschig )ings )emo%al #es No
Sca**ol'ing )equire' #es No 'mall sca(oldin) ma# *e re!uired to reach the to o&
vessel.
echanical Cleaning #es No Po"er *rush "elds and +, *and on either side at selected
locations &or NDT as er %nsector-s instructions.
+ighting )equire' #es No Vessel sa&e .and lams
Comments: /. Actual "eld cleanin) ma# increase or decrease. 2. Ventilator 0air mover re!uired at
manhole.
INSPECTION
,isual $nspection #es No
Ultrasonic $nspection #es No On shell and domes
("e Penetrant #es No
agnetic Particle #es No On "elds and .A1 on the shell and dished ends
E''" Current #es No
)a'iograph" #es No
Comments: $inor slud)e 0 de*ris removal ma# *e necessar# a&ter initial oenin).
ADDITIONAL REQUIREMENTS
-"'ro.Pneumatic Test #es No
P), Ser%icing #es No
Other #es No
Comments
MANPOWER
/atargas $nspector #es No / 2atar)as %nsector
O$S N(E Technicians #es No 2 ND3 technicians
$nspection Time / T"elve-hour shi&t
PREPARED BY
Signature:
Name:
Title:
(ate:
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000

You might also like