our life span, which can vary widely among indi- viduals. The permanence of inanimate objects also varies in absolute time and importance. For example, commercial communication satellites are expensive to fabricate, difcult to deploy and generally inaccessible for repair, so it is impor- tant that they function properly for a long time. Replacement valves and pacemakers for human hearts can be replaced or repaired, but not with- out considerable risk to the recipient. Equipment sent to the remote research stations of Antarctica is expected to stand up to harsh con- ditions. Buildings, bridges and monuments are also built to endure, but they have nite life- times. Intelligent completions, which combine production monitoring and control, are becoming more common, and require reliable downhole gauges and ow-control valves. 1 Downhole equipment in the oil eld also must stand the test of time. The productive life of an oil or gas well may be 10 or more years, so permanent downhole equipment must last at least that long to satisfy operators expectations. Because it is impractical to conduct equipment tests of such long duration, reliability engineer- ing and failure testing have become mainstays of those people who develop permanent monitoring systems. The result has been an impressive reliability track record for permanent monitoring installations worldwide. In this article, we begin by examining the challenges in permanent monitoring. Next, we consider how engineers develop robust perma- nent gauges to provide a continuous stream of data for the life of a well. Finally, we present examples that demonstrate how the use of per- manent gauges adds value by helping to optimize production and forewarning operators of prob- lems so that preventive or corrective action can be taken. FloWatcher, NODAL, PQG (Permanent Quartz Gauge), PressureWatch, PumpWatcher, Sapphire and WellWatcher are marks of Schlumberger. 1. For more on ow-control aspects of intelligent completions: Algeroy J, Morris AJ, Stracke M, Auzerais F, Bryant I, Raghuraman B, Rathnasingham R, Davies J, Gai H, Johannessen O, Malde O, Toekje J and Newberry P: Controlling Reservoirs from Afar, Oileld Review 11, no. 3 (Autumn 1999): 18-29. 20 Oileld Review Downhole Monitoring: The Story So Far Joseph Eck Houston, Texas, USA Ufuoma Ewherido Jafar Mohammed Rotimi Ogunlowo Mobil Producing Nigeria Unlimited Lagos, Nigeria John Ford Amerada Hess Corporation Houston, Texas Leigh Fry Shell Offshore, Inc. New Orleans, Louisiana, USA Stphane Hiron Leo Osugo Sam Simonian Clamart, France Tony Oyewole Lagos, Nigeria Tony Veneruso Rosharon, Texas For help in preparation of this article, thanks to Franois Auzerais, Michel Brard, Jean-Pierre Delhomme, Josiane Magnoux, Jean-Claude Ostiz and Lorne Simmons, Clamart, France; Larry Bernard and David Lee, Sugar Land, Texas, USA; Richard Dolan and Brad Fowler, Amerada Hess Corporation, Houston, Texas; David Rossi and Gerald Smith, Houston, Texas; John Gaskell, Aberdeen, Scotland; and Younes Jalali and Mike Johnson, Rosharon, Texas. We thank Philip Hall, Chief Executive of The Sir Henry Royce Memorial Foundation, for information about Sir Henry Royces bumping test machine. Reservoir monitoring requires dependable downhole data-acquisition systems. Products based on sound reliability engineering and failure testing, essential to building durable permanent monitoring systems, are responsible for an impressive track record for permanent gauge installations worldwide. Gauges supply data useful for both short-term troubleshooting and for long-term development planning. Winter 1999/2000 21 Challenges in Permanent Monitoring From the perspective of reliability, permanent downhole gauges used in oil and gas wells are similar to commercial communication satellites, although other industries, such as the automotive industry, confront similar reliability challenges. Each system must endure a long life under harsh environmental conditions. Once in place, the devices are not routinely repaired, replaced or recovered. Parts may never return to surface for lab analysis of what worked and what didnt; it is difcult to determine what failed without retriev- ing and examining a malfunctioning device. A typical approach to these challenges is to include redundant components in the hope that if one part fails, its backup will function. When used wisely, redundant designs can improve reli- ability signicantly. However, in both downhole gauges and satellites, redundant components occupy valuable, limited space and consume precious power. Common failure modes must be avoided when specifying redundant components. For example, if a particular component is prone to failure in a particular environment, its backup part should be made from different material so that it too wont fail under the same conditions. The annals of aviation include numerous episodes of common-failure-mode disasters. Charles Lindbergh undertook a transatlantic ight in the single-engine Spirit of Saint Louis in 1927 only after careful study convinced him that the lack of backup systems would not put him at risk. 2 In addition to fabricating durable permanent downhole equipment, engineers and designers work together to address the complexity of equipment installation and conditions at the wellsite. Competent eld engineers and robust equipment are both essential for reliability. For example, it is difcult to maintain a high level of manual dexterity for hours at a time in an icy downpour or a erce wind. It is important for the eld crew to install a monitoring system using well-designed installation tools that ensure installation consistency, especially in remote locations. Simplifying the installation process as much as possible also improves success rates. Early failure of permanent monitoring systems decreases when a well-prepared crew performs the installation with familiar tools. Operators have used permanent downhole pressure gauges since the 1960s. 3 The vast body of experience is paying off in the latest genera- tion of gauges, for which statistically valid relia- bility data are now available. There are now thousands of gauges deployed worldwide, over 800 of which have been installed by Schlumberger since 1973 (above and next page, top). A signi- cant increase in installations occurred after a new generation of more reliable gauges was developed in the early 1990s. 22 Oileld Review Metal-to-metal sealed cable head Hermetically sealed welded housing Cable driver and fault-tolerant regulator Digital pressure, temperature and self-test 1 1 0 1 0 Quartz crystal resonators to measure temperature and pressure Protection bellows P/T Pressure connection Gland radial connection Autoclave axial connection or 1 /4-in. encased cable > Permanent downhole pressure guage. This PQG Permanent Quartz Gauge system measures pressure and temperature using quartz crystal resonators. 1973 First permanent downhole gauge installation in West Africa, based on wireline logging cable and equipment D e p e n d a b i l i t y 1975 First pressure and temperature transmitter on a single wireline cable 1978 First subsea installations in North Sea and West Africa 1983 First subsea installation with acoustic data transmission to surface 1986 Fully welded metal tubing-encased permanent downhole cable < Schlumberger milestones in permanent monitoring. Incremental improvements in dependabilitythat is, reliable delivery of high-quality measurementsof permanent gauges are shown qualitatively by the time line below. 2. http://www.pbs.org/wgbh/amex/lindbergh/timeline/ index.html 3. Nestlerode WA: The Use of Pressure Data From Permanently Installed Bottom Hole Pressure Gauges, paper SPE 590, presented at the SPE Rocky Mountain Joint Regional Meeting, Denver, Colorado, USA, May 27-28, 1963. 4. For more on permanent downhole pressure gauge hard- ware: Baker A, Gaskell J, Jeffrey J, Thomas A, Veneruso T and Unneland T: Permanent MonitoringLooking at Lifetime Reservoir Dynamics, Oileld Review 7, no. 4 (Winter 1995): 32-46. Winter 1999/2000 23 Dependability, the Sine Qua Non A basic permanent downhole gauge consists of sensors to measure pressure and temperature, electronics and a housing (previous page, right). 4 A mandrel on the production tubing holds the gauge in place. A cable, enclosed in a protective metal tube, is clamped onto the tubing. The cable connects the gauge to the wellhead and then to surface equipment, such as a computer or control system. Because acquiring and transmitting good data depend on proper functioning of each part, such systems are only as reliable as their weak- est component. A complete monitoring and communication system, such as the WellWatcher system, han- dles diverse sensors, including a FloWatcher sensor to measure ow rate and uid density, a PumpWatcher sensor to monitor an electric submersible pump and a PressureWatch gauge to measure pressure and temperature (below). Surface sensors measure multiphase ow rate and pressure and detect sand production. In addition to surface controls for valves and chokes, there is a computer to gather data, which Surface sensors and controls Multiphase flow rate Valve and choke control Pressure measurements Sand detection Permanent downhole sensors FloWatcher sensor to monitor flow rate and density PumpWatcher sensor to monitor electric submersible pump PressureWatch gauges to measure pressure and temperature Host server and database Data-retrieval and communications software Integrated applications > A complete permanent monitoring system for measuring pressure, temperature, ow rate and uid density downhole. Surface sensors measure ow rate and pressure. A data-retrieval and communications system facilitates data transfer to the ofce of the end user. 1986 Introduction of quartz crystal permanent pressure gauge in subsea well 1990 Fully supported copper conductor in permanent downhole cable 1993 New generation of quartz and sapphire crystal permanent gauges 1994 PQG Permanent Quartz Gauge performance substant- iated by gauge accreditation program at BP. Start of long- term lab testing 1994 FloWatcher installation for mass flow-rate measurement are stored at the wellsite or transmitted to the ofce (below). 5 Permanent downhole systems must be dependable throughout their lifetimesthey must be reliable and stable. Dependability con- jures different meanings for different people, but is used in this article to refer to the combination of reliability and stability. Reliability in the con- text of downhole gauges refers to proper instal- lation and ongoing delivery of data from the gauge. It can be dened as the probability that the gauge will perform as specied without fail- ure for a certain amount of time under the required environmental conditions. Stability refers to the actual measurement. Measurements from an unstable or excessively drifting gauge might prove more troublesome to an oileld operator than outright failure of the gauge. It is important to know whether gradual variation in a measurement with time indicates an actual change in the reservoir or reects a drift problem with the measuring device. To ensure a dependable product, it is essen- tial to maintain strict quality control throughout the entire engineering process. Quality is the degree to which the product conforms to speci- cations. To truly achieve world-class reliability and stability entails systematic product develop- ment and qualication testing, use of qualied components and proven design methods, strict audits and tracking of generic parts, failure analy- ses and consultation with industrial and academic peers. Reliability and stability cannot be tested into a product after it is built, but instead must be considered throughout the entire process, from design and production to installation. The Road to Reliability During the past 10 years, Schlumberger has enhanced the dependability of its permanent monitoring systems through improvements in engineering and testing processes, system design, risk analysis, training and installation procedures (next page, top). 6 Like other tools and systems developed by Schlumberger, permanent gauge development follows a logical sequence of engineering phases. Dependability concerns are paramount during each phase. The engineering phase begins with develop- ment of a mission prole, or a verbal description of the technical concept that serves as an engi- neering framework. The mission prole denes the role of each component and the environmen- tal conditions components will encounter during 24 Oileld Review WellWatcher acquisition unit Sensors Automatic data- retrieval server Automatic data- retrieval client Central storage Central storage configuration Archiving database ASCII files Data browser Data access library Engineering offices H E L I K O P T E R S E R V Wellsite Office > Data ow. Measurements are transmitted from the downhole device through the cable to surface. The surface data-acquisition unit can send data by satellite to engineering ofces, where data are stored in a library for easy access. Winter 1999/2000 25 their expected lifetime. All components of the system are screened and qualied to withstand the expected conditions. Accelerated destructive tests subject components to conditions much more extreme than expected over their lifetime, such as greater mechanical shocks and vibrations and higher-than-downhole temperatures and pressures. This type of testing helps determine failure causes and failure modes. Long-term test- ing of the system enables engineers to validate reliability models and quantify measurement stability (below). A drawback to accelerated testing is that failure can occur simply because of the stressful test procedure, and the test might not be a good predictor of actual performance. It is impossible to test everything, but it is important to test as much as possible to increase condence that the product will perform as required in commercial operations. Feedback from eld engineers is a crit- ically important complement to laboratory testing. Product engineering Mission profile and requirements Prototype product design Risk analysis and test plans Components qualification testing Reliability qualification testing Technical reviews and audits Sustaining, product improvement Training and personnel development Training with development and field engineers Well completions installation training Performance evaluation and growth plan Technique improvement Project engineering Reservoir engineering and production requirements Well completions design and installation planning Well construction, installation and operation Project improvement Reliability and data quality management Collect field track records into database Analyze results and feedback for improvement Review with operators, development and field engineers >Permanent monitoring system development. From the initial mission prole to failure analysis, collaboration between engineers, eld personnel and operators contributes to continual improvements in permanent monitoring systems. Permanent gauge stability test. This plot of pressure versus time represents testing of a PQG Permanent Quartz Gauge system at elevated pressures and temperatures for more than two years. The initial test conditions were 140C [284F] and 7000 psi [48.2 Mpa]. Testing was then accelerated, with the temperature increased to the maximum rated temperature of 150C [302F], and then to 160C [320F] and 170C [338F], to make the gauge fail. Each time the temperature was increased, there was a brief period of measurement drift before the gauge reached stability. The gauge drifted less than 3 psi/yr [20 kPa/a]. During the test, the gauge performed as expected, but the test cell had to be repaired twice! 5. For a related article on data delivery in this issue: Brown T, Burke T, Kletzky A, Haarstad I, Hensley J, Murchie S, Purdy C and Ramasamy A: In-Time Data Delivery, Oileld Review 11, no. 4 (Winter 1999): 34-55. 6. Veneruso AF, Sharma S, Vachon G, Hiron S, Bussear T and Jennings S: Reliability in ICS* Intelligent Completions Systems: A Systematic Approach from Design to Deployment, paper OTC 8841, presented at the 1998 Offshore Technology Conference, Houston, Texas, USA, May 4-7, 1998. 0 10,000 10,005 10,010 10,015 10,020 10,025 10,030 100 200 300 400 500 600 700 800 900 PQG pressure reading 1 year 2 years T e s t
c e l l
r e p a i r s T e s t
c e l l
r e p a i r s -3 psi/year drift 0 psi/year drift Duration of testing, days P r e s s u r e ,
p s i 150C 160C 170C PQG Stability Test at 10,000 psi > Tests for susceptibility to mechanical shock and vibration, such as those expected during transport and installation, are also performed. 7 These tests are similar in concept to those developed by Sir Henry Royce, the engineer behind the success of the Rolls-Royce auto- mobile. By repeatedly bumping the car on an apparatus that simulated bumps in a road, Royce determined which parts of the chassis were not strong enough and developed better ones (right). 8 The changes included replacing rivets with bolts and using a few large bolts rather than many small ones. In the system-design phase, engineers ensure proper interfacing between the completion components. Communication with completion engineers and third-party vendors has resulted in continual improvement in downhole cable con- nections and protection of the system. Both experts and end users provide input dur- ing the development phase, as engineers perform simulations and build mock-ups. Conducted fre- quently, design reviews include eld personnel. Design rules have been prepared to address the need for low stress on components, minimal external connections and other concerns. Once the system is built and is ready for installation, a specially trained crew reviews detailed installation procedures and project plans with operations personnel and third-party vendors. Performance of the eld installation crew plays an important role in system reliability, so formal training programs for both system design engineers and eld installation techni- cians are conducted. Whenever possible, system design engineers attempt to simplify installation requirements because factors such as frigid temperatures, gusty winds and long hours may present additional challenges to the crew. A design that allows fast, easy installation relieves some of the burden on the field crew and minimizes risk and rig time. 26 Oileld Review > Torturing tools. By exposing an automobile chassis to repeated mechanical shocks (top), Sir Henry Royce observed which parts were prone to failure and built better ones for Roll-Royce, beginning around the turn of the last century. Today, highly specialized testing machines and accelerated test techniques developed by Schlumberger verify the endurance of downhole equipment against mechanical shocks (bottom). 7. Veneruso A, Hiron S, Bhavsar R and Bernard L: Reliability Qualication Testing for Permanently Installed Wellbore Equipment, abstract submitted to the 2000 SPE Annual Technical Conference and Exhibition, to be held in Dallas, Texas, USA, October 1-4, 2000. 8. We thank Philip Hall for information about the bumping test machine. Mr. Hall retired from Schlumberger after 22 years of service, both in the oileld and in electronics. He is Chief Executive of The Sir Henry Royce Memorial Foundation, The Hunt House, Paulerspury, Northamptonshire, NN12 7NA, England. Winter 1999/2000 27 Learning from Experience If a permanent downhole gauge fails, engineers analyze the circumstances and sometimes attempt to reproduce the failure modes in the engineering center or other testing facility. Failure mechanisms are not random; in most cases there are underlying causes at work that must be uncovered, such as design problems, faulty mate- rials or improper installation. Schlumberger has established an on-line database to capture data about system installations, including details about environmental conditions, to identify any patterns in failures (right). The database allows statistical analysis of the data by region, operator, environmental conditions and other operational parameters. Careful analysis of the worldwide database increases condence that the appropri- ate lessons are learned from eld experiences and helps focus efforts on possible areas of improvement. From August 1, 1987, to the present, the per- formance of 712 permanent gauge installations has been tracked. The oldest system is more than 16 years old, having been installed a few years before the database was established. Analysis of 572 new-generation digital technology installa- tions made since their introduction in March 1994 indicates that over 90% of these PressureWatch Quartz and Sapphire systems were still operating after 2.5 years (below). The analysis, based on methods introduced by > Permanent downhole gauge database. Careful tracking of each system enables analysis of gauge performance. Comparison of environmental conditions helps teams prepare to install gauges in new locations by learning from past experience in similar areas. 0 0.0 0.5 2.0 1.5 1.0 2.5 3.0 4.0 4.5 3.5 5.0 10 20 30 40 50 60 70 80 90 100 Operational life, years S u r v i v a l
p r o b a b i l i t y ,
% Permanent gauge operating life. Since record- keeping began in 1987, Schlumberger has installed more than 700 permanent gauges worldwide. Analysis of 572 new-generation digital technology installations made since March 1994, shown by the purple line, indicates that over 88% of these PressureWatch Quartz and Sapphire systems were still operating after 4 years. The lavender trend line begins at 97% and decreases by 3% per year, a higher failure rate than that of the actual data. The photograph shows the production facilities of the Baldpate eld, operated by Amerada Hess. > Mltoft, helps reveal the key factors inuencing the reliability of permanent monitoring systems (above right). 9 The Mltoft method addresses a systems actual operational time rather than its calendar time, a key advantage when studying eld installations over a long time period. The method helps pinpoint areas for improvement in system design and deployment. Operating companies have independently studied the reliability of permanent gauges. 10 Different manufacturers and operators measure performance according to their own standards. Schlumberger has chosen to focus on the whole system rather than a single component because it is vital that the entire system operate properly and provide usable data. Downhole to Desktop: Using the Data After the equipment has survived the ordeal of testing and installation, the real challenge begins once a permanent monitoring system is placed securely in a well. A system that takes a mea- surement every second of the day produces over 31 million data points per year. Coping with the volume of data from permanent monitoring systems is an issue that operators and service companies continue to address. 11 Some operators have chosen to sample their data at specic times or when the change in a measurement exceeds a predetermined threshold. Others sam- ple their data at greater time intervals, such as 30 seconds, to reduce data volume. Once reaching the end user, the data are applied to two general production issues: reservoir drainage and well delivery (right). Reservoir- drainage aspects include pressure monitoring, pressure maintenance, material-balance models and simulation models. Well-delivery issues, such as skin and permeability, affect production engineering. When a well is shut in for maintenance, a pressure gauge offers the small-scale equivalent of a pressure buildup test. Subsequent well shut- ins allow engineers to analyze the repeatability 28 Oileld Review Reservoir drainage Application Description Well delivery Application Description Pressure monitoring Static bottomline pressure survey Pressure maintenance Future development plans (reservoir repressurization: install injection facilities?) Real-time fracturing and stimulation operation monitoring Appraisal of injection and production profile along the well Material balance model updating Input data for continuous update and refinement of material balance model Well test interpretation and analysis (buildup, drawdown, multirate and interference well testing) Reservoir boundaries, well spacing requirements, interwell pressure communication Water and gas injection monitoring Evaluate degree of pressure support from injector wells Appraise performance of injection program Reservoir simulation model refinement and validation Historical database for pressure history matching Calibration tool for simulation model Well test interpretation and analysis (buildup, drawdown, multirate and interference well testing) Skin, permeability and average reservoir pressure Production engineering Input for NODAL analysis Productivity Index (PI) and long-term variation in PI measurement; generation of water, gas and sand production rate correlation as a function of pressure Flowing bottomhole pressure survey to determine maximum offtake _ Flow well at optimal pressure above bubblepoint pressure to avoid liberation of free gas Complement or corroborate other reservoir monitoring measurements Corroboration of information provided by innovations such as 4D seismic surveys, time-lapse well logging > Typical applications of permanent downhole gauge data. Data from downhole gauges can be used to improve both reservoir drainage and well delivery. Operational time A c c u m u l a t e d
f a i l u r e s ,
% Flaws (manufacturing and installation related) Random overload (design related) Predictable wear-out (design and environment related) Characterizing performance over time. Even the most reliable permanent gauge can fail and the root cause often is a matter of speculation. Production-related or installation flaws account for many early failures. At intermediate stages, failures occur at a low, relatively steady rate, apparently because of random overloads. After many years of service, failures may occur as components age. > Winter 1999/2000 29 of the tests and improve condence in selecting a reservoir model. If all the wells in a eld are shut in, downhole gauges can measure the aver- age reservoir pressure. The average reservoir pressure measured this way is a key component of decline rate and reserve estimations and a parameter for reservoir simulations. 12 In uid-injection projects, permanent downhole pressure gauges can be used to better maintain pressure, displace oil, arrest subsidence and dis- pose of uids. By monitoring a continuous stream of pressure data, operators can control reservoir performance by injecting uids to keep reservoir pressure above bubblepoint pressure to ensure production of oil rather than gas. Permanent gauges can also help determine the optimal pro- duction rate when there are concerns about sand production or water coning at high ow rates. Downhole pressure gauges allow engineers to allocate production to specic wells. Knowing the downhole pressure, the wellhead pressure and the general properties of the produced uids allows calculation of the ow rate for a well and calibration of ow rates with test data. Offshore satellite elds tied back to platforms and elds owned by multiple partners are good candidates for this particular application of downhole pres- sure gauges. In articial-lift applications, downhole pres- sure gauges help engineers determine how well the articial-lift system is performing. For exam- ple, a prolic, highly permeable, unconsolidated oil reservoir might have high deliverability, but the bottomhole pressure of the well might be inadequate to produce the uid to surface. If an electric submersible pump or gas-lift system is installed in the well, the operator can add a downhole gauge to assess the performance of the lift system. Gauges in Action The permanent monitoring applications that fol- low come from widely separated regions with different operational challenges and operator priorities. In each case, the operator might mea- sure the value of permanent monitoring systems in a variety of ways, such as additional barrels of oil recovered through more efcient reservoir drainage or delivery from individual wells, or in cost savings through decreased well interven- tions. Appraisal of a deep, sour, high-pressure, high-temperature (HPHT) discovery in the Middle East presented numerous operational and inter- pretation challenges. Unlike the prolic shallow oil elds nearby, the discovery well produced anomalously high API gravity oil for the region from a fractured carbonate reservoir with limited microporosity. A thick salt layer above the reser- voir complicated interpretation and operations. Nevertheless, the accumulation presented fasci- nating opportunities to evaluate fracture fairways below structural spillpoints and hydrocarbon self- sourcing in a kerogen-rich reservoir rock. Data from the initial discovery well were inad- equate to calibrate reservoir simulations or to plan development. A deep appraisal well, drilled over the course of a year with mud weights exceeding 20 pounds per gallon [2.4 g/cm 3 ], pro- vided core, mud log and wireline log data. An extended well test generated enough data for engineers to decide how to proceed. The extremely high formation pressures and use of kill-weight mud in wellbores meant that wireline-conveyed pressure measurements were not possible. Instead, the operator selected a FloWatcher system to measure pressure, temper- ature and ow rate continuously. This installation was the rst use of the FloWatcher system at a pressure of 15,000 psi [103.4 Mpa], so advance preparations were necessary. The wellhead, which had already been procured, was modied to allow an exit for the cable. A shed was built to accommodate surface monitoring equipment. The permanent monitoring system was safely installed and an extended well test was conducted for four months, with oil owing through a 70-km [43.5-mile] flowline. The FloWatcher system was selected in part because pressure measurements at the Venturi inlet and throat allowed determination of the absolute pressure, the pressure change across the Venturi and the flow rate. Despite a repairable seal failure in the Venturi, it was still possible to obtain pressure measurements from the pressure gauge, which functioned as expected throughout the test. Also, the mandrel design for the system was relatively inexpensive. The permanent monitoring system enabled engineers to produce at the maximum rate while maintaining pressure above the bubblepoint, and to gather the data they needed to formulate development plans. Given the operational chal- lenges of this particular well and area, the remote location and the importance of gaining useful data, an extended well test with a perma- nent downhole monitoring system proved to be the optimal approach. Permanent downhole monitoring systems have been used in the Gulf of Mexico for several years. Shell Offshore, Inc., has installed perma- nent gauges in each of the 10 wells it operates in the Enchilada area in the continental Gulf of Mexico (above). The Enchilada area comprises thin-bedded turbidite reservoir sands located both > Enchilada eld. The Enchilada area includes several blocks in the Garden Banks area offshore Louisiana, USA. The blocks are 3 miles [4.8 km] long and 3 miles wide. 9. Mltoft J: Reliability Engineering Based on Field Informationthe Way Ahead, Quality and Reliability International 10, no. 5 (May 1994): 399-409. Mltoft J: New Methods for the Specication and Determination of Component Reliability Characteristics, Quality and Reliability International 7, no. 7 (July 1991): 99-105. 10. van Gisbergen SJCHM and Vandeweijer AAH: Reliability Analysis of Permanent Downhole Monitoring Systems, paper OTC 10945, presented at the 1999 Offshore Technology Conference, Houston, Texas, USA, May 3-6, 1999. 11. A complete discussion of processing and reducing data from permanent downhole gauges is beyond the scope of this article. For one example of how to process data: Athichanagorn S, Horne R and Kikani J: Processing and Interpretation of Long-Term Data from Permanent Downhole Pressure Gauges, paper SPE 56419, pre- sented at the SPE Annual Technical Conference and Exhibition, Houston, Texas, USA, October 3-6, 1999. 12. Baustad T, Courtin G, Davies T, Kenison R, Turnbull J, Gray B, Jalali Y, Remondet J-C, Hjelmsmark L, Oldeld T, Romano C, Saier R and Rannestad G: Cutting Risk, Boosting Cash Flow and Developing Marginal Fields, Oileld Review 8, no. 4 (Winter 1996): 18-31. TEXAS LOUISIANA Garden Banks Baldpate Baldpate North Enchilada 0 0 160 km 100 miles above and below salt. The rst gauge was installed in September 1997, and to date all of the gauges continue to operate without failure. Permanent downhole pressure gauges fulll two major requirements for Shell Offshore: daily operations improvements and better long-term reservoir management. In both cases, pressure data must be accessible to reservoir specialists in a format they can use efciently. The system installed by Schlumberger stores the data for subsequent pressure transient analysis. Shell Offshore retrieves the data from the system and uses its own computer-assisted operations (CAO) system to manage the data stream on a long- term basis. Shells CAO acquisition unit captures surface and downhole pressure measurements at approximately 30-second intervals for trend analy- sis and long-term archiving of pressure data. In the past, most decisions about daily operations were made on the basis of surface pressure or tubing pressure measurements with infrequent downhole wireline pressure measurements. A decline in surface pressure could indicate reser- voir depletion or a downhole obstruction, but this ambiguity could not be resolved with surface data alone. Now, with both surface and down- hole pressure measurements, it is possible to quickly diagnose production problems. For exam- ple, if both surface and bottomhole pressure curves track each other on a declining trend, then the probable cause is reservoir depletion. On the other hand, if the surface pressure is dropping but the downhole pressure remains constant or increases, then the engineer might suspect that salt, scale or parafn is plugging the tubing (right). 13 Therefore, engineers for the Enchilada area use surface and downhole measurements to diagnose production problems and optimize remediation treatments. Permanent downhole pressure gauges are especially important for effective reservoir man- agement in the Enchilada area and areas like it. Thin-bedded reservoirs, such as turbidite sands, can be difficult to evaluate by wireline methods. Producers want to determine if the reservoir is continuous. During the initial development, few appraisal wells had been drilled and the subsalt location of several prospects made it difficult to define the reservoir geometry and extent. Gathering early reservoir pressure data from each well aided development planning. In addi- tion, the long-reach, S-shaped wells in the Enchilada area are expensive to drill and not easily accessed by wireline methods. Furthermore, the mechanical risk of running wireline pressure devices into these high-rate wells is unacceptable. Therefore, the perma- nent gauge system allows frequent reservoir pressure monitoring without mechanical risk and with minimum deferred production. Frequent pressure measurements help optimize production rates, and enhance understanding of ultimate reserve potential. The Enchilada area example afrms that data from permanent gauges are valuable throughout the life of the well. Run time is a major concern for Shell Offshore because the Enchilada wells are expected to produce for at least 10 years. The reli- ability and durability of these permanent gauges have a direct impact on the assets value. The suc- cessful application of permanent monitoring tech- nology convinced Shell to install gauges in two wells on their deepwater Ram-Powell platform, offshore Gulf of Mexico. The second of these installations, a PQG Permanent Quartz Gauge sys- tem set at a depth of 23,723 feet [7230 m], is the deepest installation by Schlumberger to date. 30 Oileld Review P r e s s u r e Time P surface P bhp P surface P bhp P r e s s u r e Time Diagnosing production problems. Plots of both bottomhole, P bhp , and surface pressure, P surface , versus time help engineers diagnose production problems. In the top example, surface and bottomhole pressures are declining, but the curves track each other, suggesting reservoir depletion. In the bottom plot, the surface pressure diverges and drops at a faster rate than the bottomhole pressure. One possible conclusion is that scale is plugging the production tubing. > Winter 1999/2000 31 Complicated deepwater developments, such as the Baldpate eld in Block 260 of the Garden Banks area of the Gulf of Mexico, challenge oper- ating companies (above). The rst downhole gauge in the Baldpate eld was installed in August 1998. Seven of eight wells have down- hole gauges. The eld is expected to produce for 6 to 10 years. Baldpate eld comprises two major Pliocene reservoirs at depths of 15,500 to 17,500 feet [4724 to 5334 m]. Original reservoir pressures exceeded 13,000 psi [89.63 MPa]. Production from the sands in the Baldpate North area is commingled in a seventh well. The eld reached peak production of 58,000 BOPD [9216 m 3 /d] and 230 MMscfg/D [6.5 MMm 3 /d] by June 1999. Installation of permanent downhole gauges is particularly demanding at the well depths and pressures of Baldpate eld. Success depends on a thoroughly trained, competent wellsite crew. For example, the crew must avoid potential pit- falls such as damaging the cable and making bad splices. Extensive prejob planning allows the entire team to anticipate problems and work out solutions before installation. Having many of the same crew work on every installation builds experience and carries lessons learned from one job to the next. Amerada Hess Corporation, operator of Baldpate field, elected to install permanent downhole pressure gauges for both mechanical and reservoir management purposes. Expensive gravel-pack completions and tubing in high-rate wells are prone to damage if there is excessive drawdown or if the erosional velocity is too high. 14 As ow rates were ramped up during the initial stages of production, pressure data helped avoid damage by ensuring that predetermined limits on drawdown and erosional velocity would not be exceeded. By measuring the pressure drop across the completion, engineers calculated the mechanical efciency, or mechanical skin, of the completion. 15 Acquiring a constant stream of pressure data enables reservoir engineers to ne-tune compo- sitional models for reservoir simulation, perform history matching of pressure depletion of the reservoirs over time, test secondary recovery scenarios and predict ultimate recovery. The pressure data are also used for frequent pres- sure-transient analysis. This analysis provides calculations of effective permeability, mechanical skin, non-darcy ow effects, average reservoir pressure and approximate distance to various reservoir boundaries. Interference tests can be performed because there are permanent downhole pressure gauges in all the wells. Each well responds to rate adjust- ments in offset wells within hours. The pressure responses can be used to assess reservoir conti- nuity. Data from pressure gauges conrmed the geologic model of laterally continuous basin oor fan sands. Of seven gauges installed in the Baldpate eld, six are working. The lone failurethe only failed gauge out of 43 gauges installed by Schlumberger in North Americaappears to have resulted from a problem within the gauge itself, although it has not been recovered for postmortem analysis. The installation of gauges in all the wells meant that the loss of one gauge was an inconvenience rather than a major dif- culty. It was not worth retrieving or repairing the failed gauge because of the cost and mechanical risks of pulling tubing. Data from the gauges in the other wells are sufcient for ongoing reser- voir management. Amerada Hess carefully manages the high volume of data from permanent downhole pres- sure gauges. The data are stored in the hard drive of a personal computer on the production tower. From the ofce, an engineer can control sampling rate and electronically retrieve data from the remote production tower and move them to the office. Eventually, however, Amerada Hess expects to move and store the complete data vol- ume elsewhere. Data can be downloaded into a pressure-transient software package and ana- lyzed within minutes. 13. For more on scale: Crabtree M, Eslinger D, Fletcher P, Miller M, Johnson A and King G: Fighting Scale Removal and Prevention, Oileld Review 11, no. 3 (Autumn 1999): 30-45. 14. Erosional velocity is the velocity at which an impinging uid degrades a metal at the molecular level. In this case, the operator was concerned about the possibility of high-ow rate wells producing sand from the uncon- solidated reservoir and damaging the production tubing. 15. Pahmiyer RC, Fitzpatrick HJ, Jr. and Dugan J: Completion Efciency Measures for High-Permeability, Unconsolidated Sand Environments, presented at the 1999 SPE European Formation Damage Conference, The Hague, The Netherlands, May 31-June 1, 1999. > Baldpate eld location. Baldpate eld is located offshore Louisiana in Block 260 of the Garden Banks area. TEXAS LOUISIANA Garden Banks Baldpate Baldpate North Enchilada 0 0 160 km 100 miles An example from Africa demonstrates other applications of downhole gauges. Since 1992, Mobil Producing Nigeria Unlimited has installed permanent downhole pressure gauges in 12 of its elds offshore Nigeria: Usari, Oso, Mfem, Ubit, Iyak, Enang, Asasa, Ekpe, Asabo, Unam, Edop and Etim (above). 16 Mobil has used continuous pressure mea- surements from downhole gauges in many ways. The most basic applications include determining the reservoir drive mechanism, assessing deple- tion patterns and reservoir discontinuities, and planning pressure maintenance programs. Permanent downhole gauges measure downhole pressure in wells whose high wellhead pressure precludes use of wireline pressure measurement techniques. Mobil can avoid the costs of shutting in wells with high ow rates solely for gathering data. In elds with many wells, data from strate- gically placed pressure gauges allow reservoir engineers to calibrate pressure measurements gathered by wireline methods with those from permanent gauges. In the Edop eld, 7 of approximately 40 wells have downhole pressure gauges. Mobil expected to inject gas to maintain reservoir pressure, so the initial plan was to place a downhole pressure gauge in a well in each of four fault blocks in the Edop eld and assess the connectivity of the reservoir across fault blocks. Results from the gauges showed no communication across the fault blocks, and that separate injectors would be required for each fault block. The downhole pres- sure gauges also indicated that the planned injection patterns needed to be changed, so the downhole pressure gauge data were then inte- grated with the 3D geological model to modify and optimize producer and injector locations. 32 Oileld Review 16. Ogunlowo RF, Ewherido UJ and Oyewole AA: Use of Down-hole Permanent Gauges in Reservoir Description and Management of a Gas Injection Project in Edop Field, Offshore, Nigeria, prepared for the 23rd Annual International Conference and Exhibition, Abuja, Nigeria, August 4-6, 1999. 17. Algeroy et al, reference 1. Huck R: The Future Role of Downhole Process Control, Invited Speech, Offshore Technology Conference, Houston, Texas, USA, May 3, 1999. 18. Christie A, Kishino A, Cromb J, Hensley R, Kent E, McBeath B, Stewart H, Vidal A and Koot L: Subsea Solutions, Oileld Review 11, no. 4 (Winter 1999): 219. Niger Delta Qua Iboe terminal Oil fields with downhole gauges 0 15 miles 0 24 km AFRICA Asabo Enang Edop Asasa Etim Unam Ubit Iyak Mfem Oso Usari Ekpe >Offshore Nigeria. Since 1992, Mobil Producing Nigeria Unlimited has installed permanent downhole gauges in the 12 offshore elds shown in red-rimmed green. Approximately 95% of the gauges are still operating today. Winter 1999/2000 33 Pressure data provided by downhole gauges were critical in determining communication ef- ciency around shale bafes that had escaped detection by seismic and well logging methods. Also, the continuous data provided by the gauges led to better reservoir simulation results than sin- gle data points from wireline measurement methods. As the injection project proceeded, instantaneous pressure responses within the continuous stream of data enabled engineers to determine how much compressor downtime their injection project could accommodate (right). In other fields operated by Mobil offshore Nigeria, 20 to 25% of the wells have downhole pressure gauges. Approximately 95% of the gauges provided by Schlumberger are still oper- ating. The rare instances of failure have been attributed to problems in control lines, bad cable splices, failure at the wet connector or problems at the Christmas tree rather than prob- lems with the gauges themselves. However, these are still considered failures of the system. Improvement beyond the current 95% success rate is expected. Outlook for Reservoir Monitoring Permanent reservoir monitoring is vital to intelli- gent completions, a modern approach to improving reserve recovery. 17 Efcient, benecial operation of downhole ow-control valves depends on understanding reservoir dynamics, so the combi- nation of acquiring downhole data and using flow-control valves is essential. At present, knowledge of the reservoir comes from analyzing pressure and production data and, in some cases, data from downhole flowmeters. Ongoing research and development of owmeters are expected to provide accurate measurement of ow rates as well as multiphase uid properties. In addition, researchers are addressing the chal- lenges of accurately measuring ow rates in directional and horizontal wells. Improved links between data acquisition systems and operators will facilitate real-time data transmission and display. Permanent mon- itoring allows engineers to get a sense of the reservoir, but to see the reservoir requires that the data be transformed into a usable for- mat. If data access or display is too cumbersome, downhole pressure gauge data are in danger of being ignored. The costs and economic benets of perma- nent monitoring must be considered together. Success stories from around the world, such as those presented in this article, should serve to bolster condence in permanent downhole pres- sure gauges. As condence in the dependability of permanent gauges and other systems contin- ues to grow, the value of the data will overcome short-term concerns about cost in many cases. Today, operators are venturing into remote areas and water depths approaching 10,000 ft [3048 m] and are completing wells subsea with the expectation of limited or no interventions. 18 Optimal production in these arenas will necessi- tate permanent monitoring systems that are compatible with other completion equipment. As with permanent downhole pressure gauges and ow-control valves, dependability of down- hole owmeters and other permanent equipment in wells will remain the key criterion for choosing to deploy these devices in expensive, inaccessi- ble wells. The successful application of rigorous prod- uct development and testing processes with concurrent reliability engineering and eld ser- vice quality control has set the standard for dependable permanent monitoring systems. This reects a long-term commitment of people and resources. Employing these engineering pro- cesses enhances future permanent monitoring systems. For operators, these enhancements translate into early diagnosis of problems, fewer well interventions, reduced risk and greater reserve recovery. GMG 2150 2100 2050 2000 1950 1900 1850 1800 1750 1700 1650 t min = 4/00 P max = 2100 psia t max = 7/00 P r e s s u r e ,
p s i a 12/98 2/99 4/99 6/99 8/99 10/99 12/99 2/00 4/00 6/00 8/00 >Pressure response in Edop eld. In the central fault block, gas injection is increasing reservoir pressure, as shown in this plot of pressure measured in four different wells versus time in the Intra Qua Iboe 3 reservoir. Predicted pressures, shown in dashes, were calculated on the basis of well placement, drainage radius, production rates and expected gas injection rates. t min , or April 2000, represents the earliest predicted date when the reservoir pressure will attain the target pressure (P max ), while t max represents the latest projected date to reach the desired pressure and occurs in July 2000.