This daily safety inspection report documents three safety issues at a construction site: 1) Electrical cables lying on the ground, posing a trip and fall hazard. They should be hung above the work area. 2) Poor housekeeping all over the work area, especially near tool boxes, allowing rodents to breed. Housekeeping should be done daily. 3) Chipping concrete waste not removed from the work area and should be taken to the waste dumping area.
This daily safety inspection report documents three safety issues at a construction site: 1) Electrical cables lying on the ground, posing a trip and fall hazard. They should be hung above the work area. 2) Poor housekeeping all over the work area, especially near tool boxes, allowing rodents to breed. Housekeeping should be done daily. 3) Chipping concrete waste not removed from the work area and should be taken to the waste dumping area.
This daily safety inspection report documents three safety issues at a construction site: 1) Electrical cables lying on the ground, posing a trip and fall hazard. They should be hung above the work area. 2) Poor housekeeping all over the work area, especially near tool boxes, allowing rodents to breed. Housekeeping should be done daily. 3) Chipping concrete waste not removed from the work area and should be taken to the waste dumping area.
1 all the work area all supervisors Immediate / Always (10-01-2014) 2 Level-14 & staircase area Shabarudeen Immediate /Always 3 all the work area all supervisors Always Reported by:Reyaz Ibrahim Reported to: Mr.Jagadish Date: Designation/Position: Sr.HSE Officer Designation/Position: P.M / C.M Designation/Position: HSE Engineer Sign: Sign: Sign: Date: Date: Noted by: Jose Wilson The electrical cables used for the power tools are lying on the ground . There is a chance of trip and fall hazard. The electrical cables should be properly taken to the work area.(by hanging above level) Open Status Open / Close Recommendation Housekeeping found very poor , all over the working area. Especially near and behind to the tool boxes on all floors. There is a chance for rodents to breed un cotrollably. The machine parts,cables and other materials should be damaged by rodents. housekeeping should be carried out on a daily basis. Especially near the tool boxes. Open Observations / Findings The chipping concrete waste not properly removed from the work area. The waste materials to be removed to the waste dumping area. Open P11/F11 DAILY SAFETY INSPECTION REPORT Project Name :- Falcon Tower Date: 08-01-2014 Report No : Date: Date: Date: Open Status Open / Close Open Open P11/F11 Report No :