You are on page 1of 2

S.No.

Area / Location Responsible Person Target Date


1 all the work area all supervisors
Immediate / Always
(10-01-2014)
2
Level-14
& staircase area
Shabarudeen Immediate /Always
3 all the work area all supervisors Always
Reported by:Reyaz Ibrahim
Reported to: Mr.Jagadish
Date:
Designation/Position: Sr.HSE Officer
Designation/Position: P.M / C.M
Designation/Position: HSE Engineer
Sign:
Sign:
Sign:
Date:
Date:
Noted by: Jose Wilson
The electrical cables used for the power tools are lying on the
ground . There is a chance of trip and fall hazard.
The electrical cables should be
properly taken to the work area.(by
hanging above level)
Open
Status
Open / Close
Recommendation
Housekeeping found very poor , all over the working
area. Especially near and behind to the tool boxes on all
floors. There is a chance for rodents to breed un
cotrollably. The machine parts,cables and other
materials should be damaged by rodents.
housekeeping should be carried out
on a daily basis. Especially near the
tool boxes.
Open
Observations / Findings
The chipping concrete waste not properly removed from the
work area.
The waste materials to be removed to
the waste dumping area.
Open
P11/F11 DAILY SAFETY INSPECTION REPORT
Project Name :- Falcon Tower Date: 08-01-2014 Report No :
Date:
Date:
Date:
Open
Status
Open / Close
Open
Open