S.No.

Area / Location Responsible Person Target Date


1 all the work area all supervisors Immediate / Always
2
Level-14
& staircase area
Shabarudeen Immediate /Always
3
P11/F11 DAILY SAFETY INSPECTION REPORT
Project Name :- Falcon Tower Date: 01-01-2014 Report No :
The electrical cables used for the power tools are lying on the
ground . There is a chance of trip and fall hazard.
The electrical cables should be
properly taken to the work area.(by
hanging above level)
Status
Open / Close
Recommendation
Open
Observations / Findings
The chipping concrete waste not properly removed from the
work area.
The waste materials to be removed to
the waste dumping area.
Open
Reported by:Reyaz Ibrahim
Reported to:Anbazhagan
Date:
Designation/Position: Sr.HSE Officer
Designation/Position: P.M / C.M
Designation/Position: HSE Engineer
Sign:
Sign:
Sign:
Date:
Date:
Noted by: Jose Wilson
P11/F11
Report No :
Status
Open / Close
Open
Open
Date:
Date:
Date: