All supervisors are responsible for safety in all work areas and on staircases at all times. Shabarudeen is responsible for safety on Level 14 and staircases at all times. Reyaz Ibrahim reported that electrical cables were lying on the ground, posing a trip and fall hazard, and that concrete waste was not properly removed from the work area at the Falcon Tower construction site on January 1, 2014. The reports remain open pending action to properly secure electrical cables above the work area and remove waste materials.
All supervisors are responsible for safety in all work areas and on staircases at all times. Shabarudeen is responsible for safety on Level 14 and staircases at all times. Reyaz Ibrahim reported that electrical cables were lying on the ground, posing a trip and fall hazard, and that concrete waste was not properly removed from the work area at the Falcon Tower construction site on January 1, 2014. The reports remain open pending action to properly secure electrical cables above the work area and remove waste materials.
All supervisors are responsible for safety in all work areas and on staircases at all times. Shabarudeen is responsible for safety on Level 14 and staircases at all times. Reyaz Ibrahim reported that electrical cables were lying on the ground, posing a trip and fall hazard, and that concrete waste was not properly removed from the work area at the Falcon Tower construction site on January 1, 2014. The reports remain open pending action to properly secure electrical cables above the work area and remove waste materials.
1 all the work area all supervisors Immediate / Always 2 Level-14 & staircase area Shabarudeen Immediate /Always 3 P11/F11 DAILY SAFETY INSPECTION REPORT Project Name :- Falcon Tower Date: 01-01-2014 Report No : The electrical cables used for the power tools are lying on the ground . There is a chance of trip and fall hazard. The electrical cables should be properly taken to the work area.(by hanging above level) Status Open / Close Recommendation Open Observations / Findings The chipping concrete waste not properly removed from the work area. The waste materials to be removed to the waste dumping area. Open Reported by:Reyaz Ibrahim Reported to:Anbazhagan Date: Designation/Position: Sr.HSE Officer Designation/Position: P.M / C.M Designation/Position: HSE Engineer Sign: Sign: Sign: Date: Date: Noted by: Jose Wilson P11/F11 Report No : Status Open / Close Open Open Date: Date: Date: