This document summarizes the results of a surge arrester test without gaps for a condensate pump for No. 1 turbine unit. It provides the location of installation, test instrument used, insulation resistance measurements before and after the test, DC reference voltage and leakage current measurements during the test, date and approvals. The summary is in 3 sentences or less as requested.
This document summarizes the results of a surge arrester test without gaps for a condensate pump for No. 1 turbine unit. It provides the location of installation, test instrument used, insulation resistance measurements before and after the test, DC reference voltage and leakage current measurements during the test, date and approvals. The summary is in 3 sentences or less as requested.
This document summarizes the results of a surge arrester test without gaps for a condensate pump for No. 1 turbine unit. It provides the location of installation, test instrument used, insulation resistance measurements before and after the test, DC reference voltage and leakage current measurements during the test, date and approvals. The summary is in 3 sentences or less as requested.
Usage purpose CONDENSATE PUMP A FOR NO.1 UNIT TURBINE Installation location 1 Unit Tur!ine "#$ Unit Section 1A 1.Nameplate T%pe Circuit Date o& Manu&acture No. Manu&acture 2.Test Insulatin Resistan!e" P'ase R S T Ter(inal R)* R)S S)* S)T T)* R)T Be&ore Test +M,- A&ter Test +M,- Applie. instru(ent/ UT011 1022$ Megger #. Test D$ Re%e&en!e 'lta(e ) Lea*a(e $u&&ent" P'ase R S T Ter(inal R)* R)S S)* S)T T)* R)T DC Re&erence $oltage at 1(A +#$- 3ea4age Current at 2.50U1 (A +uA- Applie. instru(ent/ 6*F porta!le 7$DC generator +.Test !n!lusin"