This document summarizes test results for a current transformer used for circulating water pump A of turbine No. 1 unit. It details the nameplate information, insulation resistance test results, polarity test using a multimeter, DC resistance measurements of each winding, ratio test comparing primary and secondary currents, no-load characteristic test measuring voltages under load, and an AC withstand test. The conclusion was that all tests were completed satisfactorily at the rated temperature by PT. TRUBA 6A=A ENGINEERING and approved by CNTIC.
This document summarizes test results for a current transformer used for circulating water pump A of turbine No. 1 unit. It details the nameplate information, insulation resistance test results, polarity test using a multimeter, DC resistance measurements of each winding, ratio test comparing primary and secondary currents, no-load characteristic test measuring voltages under load, and an AC withstand test. The conclusion was that all tests were completed satisfactorily at the rated temperature by PT. TRUBA 6A=A ENGINEERING and approved by CNTIC.
This document summarizes test results for a current transformer used for circulating water pump A of turbine No. 1 unit. It details the nameplate information, insulation resistance test results, polarity test using a multimeter, DC resistance measurements of each winding, ratio test comparing primary and secondary currents, no-load characteristic test measuring voltages under load, and an AC withstand test. The conclusion was that all tests were completed satisfactorily at the rated temperature by PT. TRUBA 6A=A ENGINEERING and approved by CNTIC.