NO LIST OF PROJECT IMAGE DIMENSIONS UNIT

THE
VOLUMNS
EXQUIPMENT
RENT
QUANTATY REMARK
1
Clean from dam N01 to
dam No 3
300 m x 15 m x 1.5
mx (2 time)
m3 13500 Excavator Pc 400 348.84 Hour
2
Clean from dam No 3
to bridge No 3
300 m x 15 m x 1.5
mx (2 time)
m3 5400 Excavator Pc 400 139.536 Hour
3 Before dam No 4
100 m x 10 m x 1.5
mx (2 time)
m3 3000 Excavator Pc 400 77.52 Hour
4 Before dam No 5
40 m x 40 m x 2 mx
( 3 time)
m3 6400 Excavator Pc 400 165.376 Hour
5 Before Dam No 2
100m x 2.5 m x 15
m
m3 3750 Excavator Pc 400 96.9 Hour
THE LIST OF ENVIRONMENT PROJECT TO RENT EXQUIPMENT
6
Settling pond in Wasing
plant
(22.5+ 14.5)x 0.5 x
14.8 x 3 + 11.5 x 11
x 2 ) + 35 x 0.8 x 4
m3 1186.4
Excavator and dump
truck
1186.4
Moving filter
cake around
1000m ( to stock
pile No 5) ,
7
Settling near bridge No
4
9 x 6 x 2 m3 108
Excavator and dump
truck
108
Moving mud to
Disposal in
Mining Area
around 2 km,
8
Settling near bridge No
3
(( 7.6 + 11.7) x0.5 x
6.47 + (11.7 +13.1)
x 0.5 x 8.3+( 13.1 +
15) x 0.5 x 8.74))x 2
m3 576.305
Excavator and dump
truck
576.305
Moving filter
cake around
1000m ( stock
pile No 5)
9
Clean before the MIEU
THAN dam
70 m x 15 m x 1.5
mx (2 time)
m3 3150 Excavator 81.396
Moving filter
cake around
River Side
Created By,
Note :
Excavator
400-450
1.600.000/hours
Moving Filter
cake & Soil
30.000/m3
Knowledge By,
DAYS
VND ( 1.600.000 ) /
30.000 m3
29.07 558,144,000.000
11.628 223,257,600.000
6.46 124,032,000.000
13.7813333 264,601,600.000
8.075 155,040,000.000
THE LIST OF ENVIRONMENT PROJECT TO RENT EXQUIPMENT
Calculated by
M3'-
35,580,000.000
Calculated by
M3'-
35,580,000.000
Calculated by
M3'-
35,580,000.000
6.783 130,233,600.000
Total VND 1,562,048,800.000