Sl.

No Item Description
Percentage completed by
Steel-X Ltd.
1 Plumbing work 85%
2 Remaining wall partition 95%
3 inside out side plaster 75%
4 door and window work 95%
5 Tiles work 0%
6 Underground water tank 100%
7 Septic tank and soak well 100%
8 Out side apron and surface drain 0%
9 Lift core roof slab 100%
10 Sanitary works 0%
11 Floor epoxy paint 0%
12 wall paint 0%
13 out side entry canopy and entry steel door 100%
14 Emergency stair 0%