You are on page 1of 1

Contract No : RDA/RNIP/PRP1/C11 Bill Item : 3.1.

8
Road No : A - 35 Description : Excavation and backfill for
: structures with suitable soil
Structure : 36/3 Culvert Reference : 302(1)
Sheet No : Date : 2012.12.30
CATIC/SAC/3.1.8/01
36/3
B/S
1 1 35.200 4.900 2.520 434.65
1 (39.08)
2 10.64
406.21
395.57
10.64
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER: CONSULTANT: CONTRACTOR:
Road Development Authority Central Engineering Consultancy Bureau CATIC/CATIC/A-35
AGREED SITE MEASUREMENT RECORD
(To be Completed Daily )
Culvert
No
Sketch No Nos
Length
(m)
Width
(m)
Depth
(m)
Volume
(m3)
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S
TECHNICAL OFFICER
Total Demolision need to be deducted
Average Culvert Bottom Level = 18.116
Average Culvert Top Level = 20.636
Total Quantity
Previous Paid Quantity
Previously deducted demolision volume
need to add (IPC 18)
Balance Quantity
CHECKED BY
SITE ENGINEER
RECOMMENDED BY
RESIDENT ENGINEER
4900 mm