You are on page 1of 82

NORTHERN ROADS REHABILITATION PROJECT

CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau

COTRACTOR
CATIC/MAGA/A-35

AGREED SITE MEASUREMENT RECORD


(To be completed Daily)
Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.
1

CS Area
LHS
0.974
0.957

Mean Area

RHS
LHS RHS
0.974
0.957 0.97 0.97

0+700.00
0+720.00

6.90

1/2 Culvert Length = 6.90m

0+820.00
0+840.00

3.90

1/3 Culvert Length = 3.90m

0.981
0.932

0.981
0.932

0.96

01+180.00
02+000.00

4.75

2/1 Culvert Length = 4.75m

0.980
0.941

0.980
0.941

1+360.00
1+380.00

4.35

2/2 Culvert Length = 4.35m

0.929
0.929

1.40

2/3 Culvert Length = 1.40m

1+760.00
1+780.00

4.35

2/4 Culvert Length = 4.35m

2+180.00
2+200.00

1.90

2+299.00
2.+320.00

1+680.00
1+700.00

2+480.00
2+500.00
Total Qty

:2013.12.21
CS Volume
LHS

RHS

6.66

6.66

0.96

3.73

3.73

0.96

0.96

4.56

4.56

0.929
0.929

0.93

0.93

4.04

4.04

0.978
0.929

0.978
0.929

0.95

0.95

1.33

1.33

1.019
1.046

1.019
1.046

1.03

1.03

4.49

4.49

3/1 Culvert Length = 1.90m

0.966
0.934

0.966
0.934

0.95

0.95

1.81

1.81

4.00

3/2 Culvert Length = 4.00m

0.960
0.949

0.960
0.949

0.95

0.95

3.82

3.82

3.00

3/3 Culvert Length = 3.00m

0.940
0.889

0.940
0.889

0.91

0.91

2.74
=

2.74

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.889
0.889
0.889
0.889 0.89 0.89

2+760.00
2+780.00

2.95

3/4 Culvert Length = 2.95m

10

3+277.00
3+290.00

3.90

4/2 Culvert Length = 3.90m

11

0.889
0.889

0.889
0.889

0.89

3+808.00
3+820.00

10.20

4/3 Culvert Length = 10.20m

12

0.889
0.889

0.889
0.889

3+907.00
3+912.00

6.90

4/4 Culvert Length = 6.90m

13

0.889
0.889

3.00

5/1 Culvert Length = 3.00m

14

4+158.00
4+173.00

10.20

5/2 Culvert Length = 10.20m

4+200.00
4+208.00

3.90

4+400.00
4+412.00

4+030.00
4+036.00

4+660.00
4+680.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
2.62

2.62

0.89

3.47

3.47

0.89

0.89

9.07

9.07

0.889
0.889

0.89

0.89

6.13

6.13

0.889
0.889

0.889
0.889

0.89

0.89

2.67

2.67

15

0.889
0.889

0.889
0.889

0.89

0.89

9.07

9.07

5/3 Culvert Length = 3.90m

16

0.889
0.889

0.889
0.889

0.89

0.89

3.47

3.47

4.35

5/4 Culvert Length = 4.35m

17

0.889
0.889

0.889
0.889

0.89

0.89

3.87

3.87

3.00

5/6 Culvert Length = 3.00m

18

0.889
0.889

0.889
0.889

0.89

0.89

2.67
=

2.67

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.889
0.889
0.889
0.889 0.89 0.89

4+760.00
4+768.00

2.55

5/7 Culvert Length =2.55m

19

4+900.00
4+910.00

3.00

5/8 Culvert Length = 3.00m

20

0.889
0.889

0.889
0.889

0.89

5+370.00
5+383.00

2.05

6/3 Culvert Length = 2.05m

21

0.740
0.740

1.040
0.740

1.40

6/4 Culvert Length = 1.40m

22

0.740
0.740

5+590.00
5+600.00

4.95

6/5 Culvert Length = 4.95m

23

5+780.00
5+800.00

1.40

6/6 Culvert Length = 1.40m

5+963.00
5+980.00

2.55

6+289.00
6+300.00

5+460.00
5+470.00

6+550.00
6+560.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
2.27

2.27

0.89

2.67

2.67

0.74

0.89

1.52

1.82

0.740
0.740

0.74

0.74

1.04

1.04

0.740
0.740

0.740
0.740

0.74

0.74

3.66

3.66

24

0.740
0.740

0.740
0.740

0.74

0.74

1.04

1.04

6/7 Culvert Length = 2.55m

25

0.740
0.740

0.740
0.740

0.74

0.74

1.89

1.89

5.30

7/1 Culvert Length = 5.30m

26

0.740
0.740

0.740
0.740

0.74

0.74

3.92

3.92

2.45

7/2 Culvert Length = 2.45m

27

0.740
0.740

0.740
0.740

0.74

0.74

1.81
=

1.81

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.740
0.740
0.740
0.740 0.74 0.74

6+790.00
6+806.00

10.20

7/3 Culvert Length =10.20m

28

6+820.00
6+840.00

1.40

7/4 Culvert Length = 1.40m

29

0.740
0.740

0.740
0.740

0.74

7+148.00
7+157.00

3.00

8/1 Culvert Length = 3.00m

30

0.740
0.740

0.740
0.740

3.00

8/2 Culvert Length = 3.00m

31

0.740
0.740

7+467.00
7+480.00

10.20

8/3 Culvert Length = 10.20m

32

7+540.00
7+560.00

3.00

9/2 Culvert Length = 3.00m

8+640.00
8+645.00

3.60

8+932.00
8+940.00

7+332.00
7+340.00

10+166.00
10+180.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
7.55

7.55

0.74

1.04

1.04

0.74

0.74

2.22

2.22

0.740
0.740

0.74

0.74

2.22

2.22

0.803
0.829

0.803
0.829

0.82

0.82

8.32

8.32

33

0.740
0.740

0.740
0.740

0.74

0.74

2.22

2.22

9/3 Culvert Length = 3.60m

34

0.740
0.740

0.740
0.740

0.74

0.74

2.66

2.66

2.55

9/4 Culvert Length = 2.55m

35

0.740
0.740

0.740
0.740

0.74

0.74

1.89

1.89

2.45

11/2 Culvert Length = 2.45m

36

0.740
0.740

0.740
0.740

0.74

0.74

1.81
=

1.81

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.740
0.740
0.740
0.740 0.74 0.74

10+660.00
10+673.00

1.80

11/4 Culvert Length =11.80m

37

10+876.00
10+883.00

1.90

11/6 Culvert Length = 1.90m

38

0.740
0.740

0.740
0.740

0.74

11+510.00
11+520.00

3.00

12/2 Culvert Length = 3.00m

39

0.740
0.740

0.740
0.740

1.40

12/3 Culvert Length = 1.40m

40

0.740
0.740

12+193.00
12+201.00

1.40

13/1 Culvert Length = 1.40m

41

12+618.00
12+624.00

3.00

13/2 Culvert Length = 3.00m

12+800.00
12+810.00

3.00

12+940.00
12+950.00

11+873.00
11+880.00

13+640.00
13+660.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
1.33

1.33

0.74

1.41

1.41

0.74

0.74

2.22

2.22

0.740
0.740

0.74

0.74

1.04

1.04

0.889
0.889

0.889
0.889

0.89

0.89

1.24

1.24

42

0.889
0.889

0.889
0.889

0.89

0.89

2.67

2.67

13/3 Culvert Length = 3.00m

43

0.889
0.790

0.889
0.790

0.84

0.84

2.52

2.52

2.20

13/4 Culvert Length = 2.20m

44

0.790
0.790

0.790
0.790

0.79

0.79

1.74

1.74

2.20

14/1 Culvert Length = 2.20m

45

0.962
0.962

0.962
0.962

0.96

0.96

2.12
=

2.12

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.691
0.691
0.648
0.648 0.67 0.67

14+260.00
14+280.00

2.20

15/1 Culvert Length =2.20m

46

15+535.00
15+545.00

1.40

15/2 Culvert Length = 1.40m

47

0.648
0.648

0.648
0.648

0.65

15+840.00
15+860.00

2.45

16/1 Culvert Length = 2.45m

48

0.648
0.648

0.648
0.648

16+640.00
16+660.00

2.00

17/1 Culvert Length = 2.00m

49

0.648
0.648

1.40

17/2 Culvert Length = 1.40m

50

17+190.00
17+200.00

2.65

18/1 Culvert Length = 2.65m

17+930.00
17+940.00

1.60

18+034.00
18+040.00

16+680.00
16+700.00

19+710.00
19+720.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
1.47

1.47

0.65

0.91

0.91

0.65

0.65

1.59

1.59

0.648
0.648

0.65

0.65

1.30

1.30

0.648
0.648

0.648
0.648

0.65

0.65

0.91

0.91

51

0.963
0.963

0.963
0.963

0.96

0.96

2.55

2.55

18/2 Culvert Length = 1.60m

52

0.648
0.648

0.648
0.648

0.65

0.65

1.04

1.04

2.60

19/1 Culvert Length = 2.60m

53

0.648
0.648

0.648
0.648

0.65

0.65

1.68

1.68

3.20

20/1 Culvert Length = 3.20m

54

0.648
0.648

0.648
0.648

0.65

0.65

2.07
=

2.07

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.648
0.648
0.648
0.648 0.65 0.65

19+810.00
19+820.00

6.90

20/2 Culvert Length =6.90m

55

19+930.00
19+940.00

3.00

20/3 Culvert Length = 3.00m

56

0.648
0.648

0.648
0.648

0.65

21+040.00
21+060.00

4.35

22/1 Culvert Length = 4.35m

57

0.648
0.648

0.648
0.648

21+100.00
21+120.00

5.50

22/2 Culvert Length = 5.50m

58

0.648
0.648

2.40

23/1 Culvert Length = 2.40m

59

24+000.00
24+020.00

2.45

24/3 Culvert Length = 2.45m

24+090.00
24+100.00

3.60

24+140.00
24+160.00

22+800.00
22+820.00

24+180.00
24+200.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
4.47

4.47

0.65

1.94

1.94

0.65

0.65

2.82

2.82

0.648
0.648

0.65

0.65

3.56

3.56

0.648
0.648

0.648
0.648

0.65

0.65

1.56

1.56

60

0.648
0.648

0.648
0.648

0.65

0.65

1.59

1.59

25/1 Culvert Length = 3.60m

61

0.648
0.648

0.648
0.648

0.65

0.65

2.33

2.33

3.60

25/2 Culvert Length = 3.60m

62

0.648
0.648

0.648
0.648

0.65

0.65

2.33

2.33

3.60

25/3 Culvert Length = 3.60m

63

0.648
0.648

0.648
0.648

0.65

0.65

2.33
=

2.33

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
0.648
0.648
0.648
0.648 0.65 0.65

24+500.00
24+520.00

1.05

25/5 Culvert Length =1.05m

64

24+770.00
24+780.00

3.00

25/6 Culvert Length = 3.00m

65

0.648
0.648

0.648
0.648

0.65

27+060.00
27+073.00

4.75

28/1 Culvert Length = 4.75m

66

0.647
0.648

0.647
0.648

27+620.00
27+640.00

2.20

28/3 Culvert Length = 2.20m

67

0.648
0.648

3.60

29/1 Culvert Length = 3.60m

68

28+660.0
28+680.00

3.60

29/2 Culvert Length = 3.60m

29+150.00
29+160.00

2.40

29+380.00
29+420.00

2.40

28+350.00
28+360.00

:2013.12.21
CS Volume
LHS
RHS
0.68

0.68

0.65

1.94

1.94

0.65

0.65

3.08

3.08

0.648
0.648

0.65

0.65

1.43

1.43

0.648
0.648

0.648
0.648

0.65

0.65

2.33

2.33

69

0.648
0.648

0.648
0.648

0.65

0.65

2.33

2.33

30/1 Culvert Length = 2.40m

70

0.648
0.648

0.648
0.648

0.65

0.65

1.56

1.56

30/2 Culvert Length = 2.40m

71

0.648
0.648

0.648
0.648

0.65

0.65

1.56

1.56

Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage
30+580.00
30+600.00

Width
(m)
6.9

Description

No.

31/1 Culvert Length =6.90m

:2013.12.21

CS Area
Mean Area
LHS
RHS
LHS RHS
0.648
0.648
0.648
0.648

CS Volume
LHS
RHS

30+860.00
30+880.00

1.40

31/3 Culvert Length =1.40m

72

0.730
0.730

0.730
0.730

0.73

0.73

1.02

1.02

31+660.00
31+680.00

2.40

32/1 Culvert Length = 2.40m

73

0.692
0.692

0.692
0.692

0.69

0.69

1.66

1.66

31+900.00
31+920.00

2.40

32/2 Culvert Length = 2.40m

74

0.692
0.692

0.692
0.692

0.69

0.69

1.66

1.66

3.40

33/1 Culvert Length = 3.40m

75

0.692
0.692

0.692
0.692

0.69

0.69

2.35

2.35

32+260.00
32+280.00

1.90

33/2 Culvert Length = 1.90m

76

0.692
0.692

0.692
0.692

0.69

0.69

1.31

1.31

32+340.00
32+360.00

2.40

33/3 Culvert Length = 2.40m

77

0.692
0.692

0.692
0.692

0.69

0.69

1.66

1.66

33+240.00
33+260.00

1.70

34/1A Culvert Length = 1.70m

78

0.69
0.963

0.69
0.963

0.83

0.83

1.41

1.41

35+505.00
35+520.00

2.45

36/1 Culvert Length = 2.45m

79

1.75
1.75

1.75
1.75

1.75

1.75

4.29

4.29

2.45

36/2 Culvert Length = 2.45m

80

1.75
1.75

1.75
1.75

1.75

1.75

4.29
=

4.29

32+000.00
32+020.00

35+620.00
35+640.00
Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

:2013.12.21

CS Area
Mean Area
LHS
RHS
LHS RHS
2.71
1.75

CS Volume
LHS
RHS

35+770.00
35+800.00

36/3 Culvert Length =1.40m

35+960.00
35+980.00

2.95

36/4 Culvert Length = 2.95m

81

1.40
0.65

1.40
0.65

1.03

1.03

3.02

3.02

36+900.00
36+920.00

3.00

37/1 Culvert Length = 3.0m

82

0.648
0.648

0.648
0.648

0.65

0.65

1.94

1.94

37+480.00
37+500.00

2.40

38/1 Culvert Length = 2.40m

83

0.648
0.648

0.648
0.648

0.65

0.65

1.56

1.56

37+740.00
37+760.00

1.90

38/2 Culvert Length = 1.90m

84

0.648
0.648

0.648
0.648

0.65

0.65

1.23

1.23

38+420.00
38+440.00

3.60

39/2 Culvert Length = 3.60m

85

0.648
0.648

0.648
0.648

0.65

0.65

2.33

2.33

49+840.00
49+860.00

2.45

50/1 Culvert Length = 2.45m

86

0.692
0.692

0.691
0.692

0.69

0.69

1.70

1.69

1.60

51/1 Culvert Length = 1.60m

87

0.730
0.730

0.808
0.808

0.73

0.81

1.17

1.29

1.60

51/2 Culvert Length = 1.60m

88

0.730
0.730

0.730
0.730

0.73

0.73

1.17
=

1.17

50+120.00
50+140.00
50+300.00
50+320.00
Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Width
(m)

CS Area
Mean Area
LHS
RHS
LHS RHS
0.730
0.730
0.730
0.730 0.73 0.73

Description

No.

1.90

51/3 Culvert Length =1.90m

89

1.60

52/1 Culvert Length = 1.60m

90

0.730
0.730

0.730
0.730

0.73

51+660.00
51+680.00

1.60

52/2 Culvert Length = 1.60m

91

0.730
0.730

0.730
0.730

52+060.00
52+080.00

1.40

53/1 Culvert Length = 1.40m

92

0.692
0.692

52+200.00
52+220.00

2.40

53/1A Culvert Length = 2.40m

93

0.692
0.692

Chainage
50+800.00
50+820.00
51+360.00
51+380.00

:2013.12.21
CS Volume
LHS
RHS
1.39

1.39

0.73

1.17

1.17

0.73

0.73

1.17

1.17

0.692
0.692

0.69

0.69

0.97

0.97

0.692
0.692

0.69

0.69

1.66

1.66

Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
13.32

7.46

9.12

8.08

2.67

8.98

3.61

7.64

5.49
66.38

66.38

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
5.25

6.93

18.14

12.27

5.33

18.14

6.93

7.73

5.33
86.06

86.06

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
4.53

5.33

3.34

2.07

7.33

2.07

3.77

7.84

3.63
39.92

39.92

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
15.10

2.07

4.44

4.44

16.65

4.44

5.33

3.77

3.63
59.86

59.86

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
2.66

2.81

4.44

2.07

2.49

5.33

5.04

3.48

4.23
32.56

32.56

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
2.95

1.81

3.18

2.59

1.81

5.10

2.07

3.37

4.15
27.04

27.04

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
8.94

3.89

5.64

7.13

3.11

3.18

4.67

4.67

4.67
45.88

45.88

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
1.36

3.89

6.15

2.85

4.67

4.67

3.11

3.11

29.80

29.80

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total

2.04

3.32

3.32

4.71

2.63

3.32

2.81

8.58

8.58
39.30

39.30

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
0.00

6.05

3.89

3.11

2.46

4.67

3.39

2.46

2.34
28.36

28.36

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
2.77

2.34

2.34

1.94

3.32

12.71

12.71

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau

COTRACTOR
CATIC/MAGA/A-35

AGREED SITE MEASUREMENT RECORD


(To be completed Daily)
Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.
1

CS Area
LHS
2.08
3.10

:2013.12.21

Mean Area
LHS

RHS

2.59

3.20

17.87

22.05

3.48
3.05

3.63

3.27

14.14

12.73

3.20
2.26

4.57
3.66

2.73

4.12

12.97

19.55

3.87
3.71

3.60
4.17

3.79

3.89

16.49

16.90

2/3 Culvert Length = 1.40m

2.10
1.81

3.84
3.68

1.96

3.76

2.74

5.26

4.35

2/4 Culvert Length = 4.35m

2.82
4.23

4.33
3.95

3.53

4.14

15.33

18.01

2+180.00
2+200.00

1.90

3/1 Culvert Length = 1.90m

3.46
3.93

1.59

3.70

0.80

7.02

1.51

2+299.00
2.+320.00

4.00

3/2 Culvert Length = 4.00m

4.33
3.13

4.89
4.15

3.73

4.52

14.92

18.08

3.00

3/3 Culvert Length = 3.00m

2.95
1.85

1.79
2.23

2.40

2.01

7.20
=

6.03

0+700.00
0+720.00

6.90

1/2 Culvert Length = 6.90m

0+820.00
0+840.00

3.90

1/3 Culvert Length = 3.90m

4.25
3.00

4.75

2/1 Culvert Length = 4.75m

1+360.00
1+380.00

4.35

2/2 Culvert Length = 4.35m

1+680.00
1+700.00

1.40

1+760.00
1+780.00

01+180.00
02+000.00

2+480.00
2+500.00
Total Qty

RHS
2.80
3.59

CS Volume
LHS

RHS

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.83
3.84
3.17
4.18 3.50 4.01

2+760.00
2+780.00

2.95

3/4 Culvert Length = 2.95m

10

3+277.00
3+290.00

3.90

4/2 Culvert Length = 3.90m

11

6.42
5.15

6.67
4.80

5.79

3+808.00
3+820.00

10.20

4/3 Culvert Length = 10.20m

12

3.08
2.31

2.67
2.96

3+907.00
3+912.00

6.90

4/4 Culvert Length = 6.90m

13

3.64
3.50

3.00

5/1 Culvert Length = 3.00m

14

4+158.00
4+173.00

10.20

5/2 Culvert Length = 10.20m

4+200.00
4+208.00

3.90

4+400.00
4+412.00

4+030.00
4+036.00

4+660.00
4+680.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
10.32

11.82

5.74

22.56

22.37

2.70

2.82

27.49

28.71

3.15
3.10

3.57

3.13

24.63

21.56

1.86
2.06

1.84
1.89

1.96

1.87

5.88

5.60

15

4.27
4.06

2.05
1.98

4.17

2.02

42.48

20.55

5/3 Culvert Length = 3.90m

16

4.16
4.10

1.72
1.71

4.13

1.72

16.11

6.69

4.35

5/4 Culvert Length = 4.35m

17

4.34
4.36

2.55
2.12

4.35

2.34

18.92

10.16

3.00

5/6 Culvert Length = 3.00m

18

2.38
5.29

2.32
4.01

3.84

3.17

11.51
=

9.50

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.02
1.65
2.69
1.56 2.86 1.61

4+760.00
4+768.00

2.55

5/7 Culvert Length =2.55m

19

4+900.00
4+910.00

3.00

5/8 Culvert Length = 3.00m

20

4.42
3.68

1.79
2.71

4.05

5+370.00
5+383.00

2.05

6/3 Culvert Length = 2.05m

21

1.51
3.03

0.71
2.40

1.40

6/4 Culvert Length = 1.40m

22

2.33
2.36

5+590.00
5+600.00

4.95

6/5 Culvert Length = 4.95m

23

5+780.00
5+800.00

1.40

6/6 Culvert Length = 1.40m

5+963.00
5+980.00

2.55

6+289.00
6+300.00

5+460.00
5+470.00

6+550.00
6+560.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
7.28

4.09

2.25

12.15

6.75

2.27

1.56

4.65

3.19

2.62
2.91

2.35

2.77

3.28

3.87

2.68
2.65

2.85
2.66

2.67

2.76

13.19

13.64

24

1.40
0.26

2.70
3.05

0.83

2.88

1.16

4.03

6/7 Culvert Length = 2.55m

25

2.48
1.97

2.63
1.11

2.23

1.87

5.67

4.77

5.30

7/1 Culvert Length = 5.30m

26

4.45
5.01

3.61
3.56

4.73

3.59

25.07

19.00

2.45

7/2 Culvert Length = 2.45m

27

2.53
1.93

1.84
1.94

2.23

1.89

5.46
=

4.63

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
4.53
2.18
4.75
1.30 4.64 1.74

6+790.00
6+806.00

10.20

7/3 Culvert Length =10.20m

28

6+820.00
6+840.00

1.40

7/4 Culvert Length = 1.40m

29

2.09
2.47

0.79
1.39

2.28

7+148.00
7+157.00

3.00

8/1 Culvert Length = 3.00m

30

0.73
0.85

0.19
-

3.00

8/2 Culvert Length = 3.00m

31

1.55
1.06

7+467.00
7+480.00

10.20

8/3 Culvert Length = 10.20m

32

7+540.00
7+560.00

3.00

9/2 Culvert Length = 3.00m

8+640.00
8+645.00

3.60

8+932.00
8+940.00

7+332.00
7+340.00

10+166.00
10+180.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
47.33

17.75

1.09

3.19

1.53

0.79

0.10

2.37

0.29

0.14
-

1.31

0.07

3.92

0.21

2.54
5.53

3.64
3.64

4.04

3.64

41.16

37.15

33

2.07
2.36

2.36
2.56

2.22

2.46

6.65

7.37

9/3 Culvert Length = 3.60m

34

4.15
4.11

3.51
3.49

4.13

3.50

14.86

12.61

2.55

9/4 Culvert Length = 2.55m

35

3.14
2.49

3.35
2.89

2.82

3.12

7.18

7.95

2.45

11/2 Culvert Length = 2.45m

36

4.02
3.58

3.60
2.64

3.80

3.12

9.31
=

7.65

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.00
1.53
3.04
1.64 3.02 1.58

10+660.00
10+673.00

1.80

11/4 Culvert Length =11.80m

37

10+876.00
10+883.00

1.90

11/6 Culvert Length = 1.90m

38

4.30
4.34

3.83
3.85

4.32

11+510.00
11+520.00

3.00

12/2 Culvert Length = 3.00m

39

2.52
2.54

2.85
3.24

1.40

12/3 Culvert Length = 1.40m

40

2.52
2.41

12+193.00
12+201.00

1.40

13/1 Culvert Length = 1.40m

41

12+618.00
12+624.00

3.00

13/2 Culvert Length = 3.00m

12+800.00
12+810.00

3.00

12+940.00
12+950.00

11+873.00
11+880.00

13+640.00
13+660.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
5.43

2.85

3.84

8.21

7.29

2.53

3.05

7.59

9.14

2.65
2.78

2.47

2.72

3.45

3.80

1.13
1.52

2.00
1.70

1.33

1.85

1.86

2.59

42

2.41
2.56

2.49
2.11

2.49

2.30

7.46

6.90

13/3 Culvert Length = 3.00m

43

0.69
0.81

0.92
1.07

0.75

1.00

2.25

2.99

2.20

13/4 Culvert Length = 2.20m

44

0.88
1.00

3.24
2.40

0.94

2.82

2.07

6.20

2.20

14/1 Culvert Length = 2.20m

45

1.35
1.75

1.35
2.19

1.55

1.77

3.41
=

3.89

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.49
3.78
2.56
2.90 3.03 3.34

14+260.00
14+280.00

2.20

15/1 Culvert Length =2.20m

46

15+535.00
15+545.00

1.40

15/2 Culvert Length = 1.40m

47

4.56
4.46

3.29
3.40

4.51

15+840.00
15+860.00

2.45

16/1 Culvert Length = 2.45m

48

3.40
2.68

3.16
2.75

16+640.00
16+660.00

2.00

17/1 Culvert Length = 2.00m

49

1.90
2.37

1.40

17/2 Culvert Length = 1.40m

50

17+190.00
17+200.00

2.65

18/1 Culvert Length = 2.65m

17+930.00
17+940.00

1.60

18+034.00
18+040.00

16+680.00
16+700.00

19+710.00
19+720.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
6.66

7.35

3.35

6.31

4.68

3.04

2.96

7.45

7.24

1.98
2.40

2.14

2.19

4.27

4.38

1.55
3.06

1.74
2.51

2.31

2.13

3.23

2.98

51

1.37
1.26

1.85
2.00

1.32

1.93

3.48

5.10

18/2 Culvert Length = 1.60m

52

2.44
2.44

2.68
2.68

2.44

2.68

3.90

4.29

2.60

19/1 Culvert Length = 2.60m

53

2.15
1.83

2.45
2.43

1.99

2.44

5.17

6.34

3.20

20/1 Culvert Length = 3.20m

54

2.27
2.14

2.45
2.74

2.21

2.60

7.06
=

8.30

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
1.95
2.62
2.09
2.79 2.02 2.71

19+810.00
19+820.00

6.90

20/2 Culvert Length =6.90m

55

19+930.00
19+940.00

3.00

20/3 Culvert Length = 3.00m

56

3.16
2.98

2.72
2.13

3.07

21+040.00
21+060.00

4.35

22/1 Culvert Length = 4.35m

57

2.95
4.05

3.23
3.77

21+100.00
21+120.00

5.50

22/2 Culvert Length = 5.50m

58

2.60
4.42

2.40

23/1 Culvert Length = 2.40m

59

24+000.00
24+020.00

2.45

24/3 Culvert Length = 2.45m

24+090.00
24+100.00

3.60

24+140.00
24+160.00

22+800.00
22+820.00

24+180.00
24+200.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
13.94

18.66

2.43

9.21

7.28

3.50

3.50

15.23

15.23

3.10
3.59

3.51

3.35

19.31

18.40

2.26
2.15

1.40
-

2.21

0.70

5.29

1.68

60

2.94
2.82

2.37
2.96

2.88

2.67

7.06

6.53

25/1 Culvert Length = 3.60m

61

3.83
5.23

3.73
3.64

4.53

3.69

16.31

13.27

3.60

25/2 Culvert Length = 3.60m

62

3.73
3.71

2.82
2.87

3.72

2.85

13.39

10.24

3.60

25/3 Culvert Length = 3.60m

63

3.46
3.08

3.54
3.42

3.27

3.48

11.77
=

12.53

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
2.49
1.82
2.22
2.59 2.36 2.21

24+500.00
24+520.00

1.05

25/5 Culvert Length =1.05m

64

24+770.00
24+780.00

3.00

25/6 Culvert Length = 3.00m

65

3.27
2.13

2.42
2.52

2.70

27+060.00
27+073.00

4.75

28/1 Culvert Length = 4.75m

66

2.80
3.52

2.83
3.83

27+620.00
27+640.00

2.20

28/3 Culvert Length = 2.20m

67

2.65
2.96

3.60

29/1 Culvert Length = 3.60m

68

28+660.0
28+680.00

3.60

29/2 Culvert Length = 3.60m

29+150.00
29+160.00

2.40

29+380.00
29+420.00

2.40

28+350.00
28+360.00

:2013.12.21
CS Volume
LHS
RHS
2.47

2.32

2.47

8.10

7.41

3.16

3.33

15.01

15.82

2.22
2.85

2.81

2.54

6.17

5.58

2.19
2.96

1.98
2.70

2.58

2.34

9.27

8.42

69

2.39
2.13

2.23
1.98

2.26

2.11

8.14

7.58

30/1 Culvert Length = 2.40m

70

2.57
2.08

2.33
1.92

2.33

2.13

5.58

5.10

30/2 Culvert Length = 2.40m

71

2.78
1.90

1.93
2.20

2.34

2.07

5.62

4.96

Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage
30+580.00
30+600.00
30+860.00
30+880.00

Width
(m)
6.9

Description

No.

31/3 Culvert Length =6.90m

72

CS Area
LHS
RHS

:2013.12.21

Mean Area
LHS RHS

CS Volume
LHS
RHS

1.40

31/3 Culvert Length =1.40m

73

2.34
2.89

3.06
2.97

2.62

3.02

3.66

4.22

2.40

32/1 Culvert Length = 2.40m

74

2.16
2.36

2.37
2.51

2.26

2.44

5.42

5.86

31+900.00
31+920.00

2.40

32/2 Culvert Length = 2.40m

75

1.33
1.61

1.63
1.82

1.47

1.73

3.53

4.14

32+000.00
32+020.00

3.40

33/1 Culvert Length = 3.40m

76

1.36
0.79

1.72
2.04

1.08

1.88

3.66

6.39

32+260.00
32+280.00

1.90

33/2 Culvert Length = 1.90m

77

2.17
2.61

2.53
2.31

2.39

2.42

4.54

4.60

32+340.00
32+360.00

2.40

33/3 Culvert Length = 2.40m

78

2.27
2.10

1.97
1.94

2.19

1.96

5.24

4.69

33+240.00
33+260.00

1.70

34/1A Culvert Length = 1.70m

79

2.01
1.64

1.35
1.35

1.83

1.35

3.10

2.30

2.45

36/1 Culvert Length = 2.45m

80

2.51
-

2.51
-

1.25

1.26

3.07

3.08

2.45

36/2 Culvert Length = 2.45m

81

0.00

0.00

0.00
=

0.00

31+660.00
31+680.00

35+505.00
35+520.00
35+620.00
35+640.00
Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
LHS
RHS

:2013.12.21

Mean Area
LHS RHS

CS Volume
LHS
RHS

35+770.00
35+800.00

36/3 Culvert Length =1.40m

35+960.00
35+980.00

2.95

36/4 Culvert Length = 2.95m

82

2.85

2.88

1.43

1.44

4.20

4.25

36+900.00
36+920.00

3.00

37/1 Culvert Length = 3.0m

83

1.94
1.78

1.40

1.86

0.70

5.57

2.09

37+480.00
37+500.00

2.40

38/1 Culvert Length = 2.40m

84

1.566
1.683

1.62

0.00

3.90

0.00

37+740.00
37+760.00

1.90

38/2 Culvert Length = 1.90m

85

1.189
1.529

0.873
1.608

1.36

1.24

2.58

2.36

38+420.00
38+440.00

3.60

39/2 Culvert Length = 3.60m

86

1.935
2.225

2.438
2.152

2.08

2.30

7.49

8.26

49+840.00
49+860.00

2.45

50/1 Culvert Length = 2.45m

87

2.113
2.164

1.717
1.581

2.14

1.65

5.24

4.04

1.60

51/1 Culvert Length = 1.60m

88

2.945
3.045

2.767
3.241

3.00

3.00

4.79

4.81

1.60

51/2 Culvert Length = 1.60m

89

2.726
2.665

2.514
2.566

2.70

2.54

4.31
=

4.06

50+120.00
50+140.00
50+300.00
50+320.00
Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Width
(m)

CS Area
Mean Area
LHS
RHS
LHS RHS
3.083
2.341
2.860
1.727 2.97 2.03

Description

No.

1.90

51/3 Culvert Length =1.90m

90

1.60

52/1 Culvert Length = 1.60m

91

2.377
-

2.236
2.147

1.19

51+660.00
51+680.00

1.60

52/2 Culvert Length = 1.60m

92

3.334
3.232

3.550
3.427

52+060.00
52+080.00

1.40

53/1 Culvert Length = 1.40m

93

52+200.00
52+220.00

2.40

53/1A Culvert Length = 2.40m

94

6.145

Chainage
50+800.00
50+820.00
51+360.00
51+380.00

:2013.12.21
CS Volume
LHS
RHS
5.65

3.86

2.19

1.90

3.51

3.28

3.49

5.25

5.58

0.00

0.00

0.00

0.00

6.181

3.07

3.09

7.37

7.42

Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
39.92

26.87

32.51

33.39

8.00

33.34

8.53

33.00

13.23
228.79

228.79

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
22.14

44.93

56.20

46.20

11.48

63.04

22.80

29.08

21.00
316.85

316.85

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
11.37

18.90

7.84

7.15

26.83

5.19

10.44

44.07

10.09
141.89

141.89

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
65.08

4.72

2.66

4.13

78.31

14.03

27.47

15.13

16.96
228.47

228.47

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
8.28

15.51

16.73

7.25

4.45

14.36

5.24

8.27

7.30
87.38

87.38

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
14.00

11.00

14.69

8.65

6.20

8.59

8.19

11.52

15.36
98.20

98.20

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
32.60

16.49

30.45

37.70

6.97

13.59

29.57

23.63

24.30
215.31

215.31

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
4.79

15.51

30.83

11.75

17.69

15.71

10.68

10.57

117.53

117.53

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total

7.88

11.28

7.67

10.05

9.14

9.94

5.40

6.15

0.00
67.50

67.50

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
0.00

8.45

7.66

3.90

4.94

15.75

9.28

9.60

8.38
67.95

67.95

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
9.51

5.41

10.83

0.00

14.79

40.54

40.54

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau

COTRACTOR
CATIC/MAGA/A-35

AGREED SITE MEASUREMENT RECORD


(To be completed Daily)
Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.
1

CS Area

:2013.12.21

Mean Area

LHS
2.08
3.04

RHS
2.70
3.39

4.04
2.94

2/1 Culvert Length = 4.75m

4.35

2/2 Culvert Length = 4.35m

CS Volume

LHS

RHS

2.56

3.05

17.66

21.01

3.39
3.00

3.49

3.20

13.61

12.46

3.15
2.18

3.78
3.57

2.67

3.68

12.66

17.46

3.82
3.65

3.55
4.06

3.74

3.81

16.25

16.55

1.40

2/3 Culvert Length = 1.40m

2.00
1.79

3.75
3.65

1.90

3.70

2.65

5.18

1+760.00
1+780.00

4.35

2/4 Culvert Length = 4.35m

2.76
4.10

4.28
3.87

3.43

4.08

14.92

17.73

2+180.00
2+200.00

1.90

3/1 Culvert Length = 1.90m

3.41
3.85

1.57

3.63

0.79

6.90

1.49

2+299.00
2.+320.00

4.00

3/2 Culvert Length = 4.00m

3.77
3.01

3.93
4.04

3.39

3.99

13.56

15.94

3.00

3/3 Culvert Length = 3.00m

2.86
1.78

1.78
2.20

2.32

1.99

6.96
=

5.97

0+700.00
0+720.00

6.90

1/2 Culvert Length = 6.90m

0+820.00
0+840.00

3.90

1/3 Culvert Length = 3.90m

01+180.00
01+200.00

4.75

1+360.00
1+380.00
1+680.00
1+700.00

2+480.00
2+500.00
Total Qty

LHS

RHS

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.72
3.75
3.09
4.06 3.41 3.90

2+760.00
2+780.00

2.95

3/4 Culvert Length = 2.95m

10

3+277.00
3+290.00

3.90

4/2 Culvert Length = 3.90m

11

6.39
4.87

5.69
4.48

5.63

3+808.00
3+820.00

10.20

4/3 Culvert Length = 10.20m

12

6.39
4.87

5.69
4.48

3+907.00
3+912.00

6.90

4/4 Culvert Length = 6.90m

13

3.57
3.45

3.00

5/1 Culvert Length = 3.00m

14

4+158.00
4+173.00

10.20

5/2 Culvert Length = 10.20m

4+200.00
4+208.00

3.90

4+400.00
4+412.00

4+030.00
4+036.00

4+660.00
4+680.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
10.05

11.52

5.09

21.96

19.83

5.63

5.09

57.43

51.87

3.08
3.04

3.51

3.06

24.22

21.11

1.84
2.00

1.75
1.79

1.92

1.77

5.76

5.31

15

3.92
3.78

2.04
1.95

3.85

2.00

39.27

20.35

5/3 Culvert Length = 3.90m

16

4.00
3.98

1.62
1.64

3.99

1.63

15.56

6.36

4.35

5/4 Culvert Length = 4.35m

17

4.18
4.20

2.44
2.04

4.19

2.24

18.23

9.74

3.00

5/6 Culvert Length = 3.00m

18

2.32
4.87

2.26
2.96

3.60

2.61

10.79
=

7.83

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
2.91
1.61
2.66
1.54 2.79 1.58

4+760.00
4+768.00

2.55

5/7 Culvert Length =2.55m

19

4+900.00
4+910.00

3.00

5/8 Culvert Length = 3.00m

20

4.20
3.56

1.69
2.59

3.88

5+370.00
5+383.00

2.05

6/3 Culvert Length = 2.05m

21

1.50
2.78

0.70
2.36

1.40

6/4 Culvert Length = 1.40m

22

2.32
2.32

5+590.00
5+600.00

4.95

6/5 Culvert Length = 4.95m

23

5+780.00
5+800.00

1.40

6/6 Culvert Length = 1.40m

5+963.00
5+980.00

2.55

6+299.00
6+300.00

5+460.00
5+470.00

6+550.00
6+560.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
7.10

4.02

2.14

11.64

6.42

2.14

1.53

4.39

3.14

2.57
2.81

2.32

2.69

3.25

3.77

2.58
2.56

2.74
2.56

2.57

2.65

12.72

13.12

24

1.39
0.26

2.62
2.92

0.83

2.77

1.16

3.88

6/7 Culvert Length = 2.55m

25

2.41
1.92

2.62
1.11

2.17

1.87

5.52

4.76

5.30

7/1 Culvert Length = 5.30m

26

4.31
4.77

3.56
3.50

4.54

3.53

24.06

18.71

2.45

7/2 Culvert Length = 2.45m

27

2.49
1.93

1.82
1.90

2.21

1.86

5.41
=

4.56

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
4.53
2.18
4.75
1.30 4.64 1.74

6+790.00
6+806.00

10.20

7/3 Culvert Length =10.20m

28

6+820.00
6+840.00

1.40

7/4 Culvert Length = 1.40m

29

2.09
2.47

0.79
1.39

2.28

7+148.00
7+157.00

3.00

8/1 Culvert Length = 3.00m

30

0.73
0.85

0.19
-

3.00

8/2 Culvert Length = 3.00m

31

1.55
1.06

7+467.00
7+480.00

10.20

8/3 Culvert Length = 10.20m

32

7+540.00
7+560.00

3.00

9/2 Culvert Length = 3.00m

8+640.00
8+645.00

3.60

8+932.00
8+940.00

7+332.00
7+340.00

10+166.00
10+180.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
47.33

17.75

1.09

3.19

1.53

0.79

0.10

2.37

0.29

0.14
-

1.31

0.07

3.92

0.21

2.54
5.53

3.64
3.64

4.04

3.64

41.16

37.15

33

2.07
2.36

2.36
2.56

2.22

2.46

6.65

7.37

9/3 Culvert Length = 3.60m

34

4.15
4.11

3.51
3.49

4.13

3.50

14.86

12.61

2.55

9/4 Culvert Length = 2.55m

35

3.14
2.49

3.35
2.89

2.82

3.12

7.18

7.95

2.45

11/2 Culvert Length = 2.45m

36

4.02
3.58

3.60
2.64

3.80

3.12

9.31
=

7.65

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.00
1.53
3.04
1.64 3.02 1.58

10+660.00
10+673.00

1.80

11/4 Culvert Length =11.80m

37

10+876.00
10+883.00

1.90

11/6 Culvert Length = 1.90m

38

4.30
4.34

3.83
3.85

4.32

11+510.00
11+520.00

3.00

12/2 Culvert Length = 3.00m

39

2.52
2.54

2.85
3.24

1.40

12/3 Culvert Length = 1.40m

40

2.52
2.41

12+193.00
12+201.00

1.40

13/1 Culvert Length = 1.40m

41

12+618.00
12+624.00

3.00

13/2 Culvert Length = 3.00m

12+800.00
12+810.00

3.00

12+940.00
12+950.00

11+873.00
11+880.00

13+640.00
13+660.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
5.43

2.85

3.84

8.21

7.29

2.53

3.05

7.59

9.14

2.65
2.78

2.47

2.72

3.45

3.80

1.13
1.52

2.00
1.70

1.33

1.85

1.86

2.59

42

2.41
2.56

2.49
2.11

2.49

2.30

7.46

6.90

13/3 Culvert Length = 3.00m

43

0.69
0.81

0.92
1.07

0.75

1.00

2.25

2.99

2.20

13/4 Culvert Length = 2.20m

44

0.88
1.00

3.24
2.40

0.94

2.82

2.07

6.20

2.20

14/1 Culvert Length = 2.20m

45

1.35
1.75

1.35
2.19

1.55

1.77

3.41
=

3.89

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.49
3.78
2.56
2.90 3.03 3.34

14+260.00
14+280.00

2.20

15/1 Culvert Length =2.20m

46

15+535.00
15+545.00

1.40

15/2 Culvert Length = 1.40m

47

4.56
4.46

3.29
3.40

4.51

15+840.00
15+860.00

2.45

16/1 Culvert Length = 2.45m

48

3.40
2.68

3.16
2.75

16+640.00
16+660.00

2.00

17/1 Culvert Length = 2.00m

49

1.90
2.37

1.40

17/2 Culvert Length = 1.40m

50

17+190.00
17+200.00

2.65

18/1 Culvert Length = 2.65m

17+930.00
17+940.00

1.60

18+034.00
18+040.00

16+680.00
16+700.00

19+710.00
19+720.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
6.66

7.35

3.35

6.31

4.68

3.04

2.96

7.45

7.24

1.98
2.40

2.14

2.19

4.27

4.38

1.55
3.06

1.74
2.51

2.31

2.13

3.23

2.98

51

1.37
1.26

1.85
2.00

1.32

1.93

3.48

5.10

18/2 Culvert Length = 1.60m

52

2.44
2.44

2.68
2.68

2.44

2.68

3.90

4.29

2.60

19/1 Culvert Length = 2.60m

53

2.15
1.83

2.45
2.43

1.99

2.44

5.17

6.34

3.20

20/1 Culvert Length = 3.20m

54

2.27
2.14

2.45
2.74

2.21

2.60

7.06
=

8.30

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
1.95
2.62
2.09
2.79 2.02 2.71

19+810.00
19+820.00

6.90

20/2 Culvert Length =6.90m

55

19+930.00
19+940.00

3.00

20/3 Culvert Length = 3.00m

56

3.16
2.98

2.72
2.13

3.07

21+040.00
21+060.00

4.35

22/1 Culvert Length = 4.35m

57

2.95
4.05

3.23
3.77

21+100.00
21+120.00

5.50

22/2 Culvert Length = 5.50m

58

2.60
4.42

2.40

23/1 Culvert Length = 2.40m

59

24+000.00
24+020.00

2.45

24/3 Culvert Length = 2.45m

24+090.00
24+100.00

3.60

24+140.00
24+160.00

22+800.00
22+820.00

24+180.00
24+200.00
Total Qty

:2013.12.21
CS Volume
LHS
RHS
13.94

18.66

2.43

9.21

7.28

3.50

3.50

15.23

15.23

3.10
3.59

3.51

3.35

19.31

18.40

2.14
2.16

2.27
2.67

2.15

2.47

5.16

5.93

60

2.94
2.82

2.37
2.96

2.88

2.67

7.06

6.53

25/1 Culvert Length = 3.60m

61

3.83
5.23

3.73
3.64

4.53

3.69

16.31

13.27

3.60

25/2 Culvert Length = 3.60m

62

3.73
3.71

2.82
2.87

3.72

2.85

13.39

10.24

3.60

25/3 Culvert Length = 3.60m

63

3.46
3.08

3.54
3.42

3.27

3.48

11.77
=

12.53

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
2.49
1.82
2.22
2.59 2.36 2.21

24+500.00
24+520.00

1.05

25/5 Culvert Length =1.05m

64

24+770.00
24+780.00

3.00

25/6 Culvert Length = 3.00m

65

3.27
2.13

2.42
2.52

2.70

27+060.00
27+073.00

4.75

28/1 Culvert Length = 4.75m

66

2.80
3.52

2.83
3.83

27+620.00
27+640.00

2.20

28/3 Culvert Length = 2.20m

67

2.65
2.96

3.60

29/1 Culvert Length = 3.60m

68

28+660.0
28+680.00

3.60

29/2 Culvert Length = 3.60m

29+150.00
29+160.00

2.40

29+380.00
29+420.00

2.40

28+350.00
28+360.00

:2013.12.21
CS Volume
LHS
RHS
2.47

2.32

2.47

8.10

7.41

3.16

3.33

15.01

15.82

2.22
2.85

2.81

2.54

6.17

5.58

2.19
2.96

1.98
2.70

2.58

2.34

9.27

8.42

69

2.39
2.13

2.23
1.98

2.26

2.11

8.14

7.58

30/1 Culvert Length = 2.40m

70

2.57
2.08

2.33
1.92

2.33

2.13

5.58

5.10

30/2 Culvert Length = 2.40m

71

2.78
1.90

1.93
2.20

2.34

2.07

5.62

4.96

Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage
30+580.00
30+600.00

Width
(m)
6.9

CS Area
LHS
RHS

:2013.12.21

Mean Area
LHS RHS

CS Volume
LHS
RHS

Description

No.

31/1 Culvert Length =1.40m

72

2.23
3.66

2.64
1.96

73

2.33
2.87

3.03
2.95

2.60

2.99

3.64

4.19

30+860.00
30+880.00

1.40

31/1A Culvert Length =1.40m


31/3 Culvert Length =1.40m

31+660.00
31+680.00

2.40

32/1 Culvert Length = 2.40m

74

2.16
2.35

2.33
2.47

2.26

2.40

5.41

5.76

31+900.00
31+920.00

2.40

32/2 Culvert Length = 2.40m

75

1.33
1.61

1.63
1.82

1.47

1.73

3.53

4.14

3.40

33/1 Culvert Length = 3.40m

76

1.36
0.79

1.72
2.04

1.08

1.88

3.66

6.39

32+260.00
32+280.00

1.90

33/2 Culvert Length = 1.90m

77

2.17
2.60

2.52
2.30

2.39

2.41

4.53

4.58

32+340.00
32+360.00

2.40

33/3 Culvert Length = 2.40m

78

2.26
2.09

1.97
1.91

2.18

1.94

5.22

4.66

33+240.00
33+260.00

1.70

34/1A Culvert Length = 1.70m

79

1.52
1.55

1.34
1.35

1.54

1.35

2.61

2.29

35+505.00
35+520.00

2.45

36/1 Culvert Length = 2.45m

80

2.500
-

2.500
-

1.25

1.25

3.06

3.06

2.45

36/2 Culvert Length = 2.45m

81

0.00

0.00

0.00
=

0.00

32+000.00
32+020.00

35+620.00
35+640.00
Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

35+770.00
35+800.00
35+960.00
35+980.00

Description

No.

36/3 Culvert Length =1.40m

CS Area
LHS
RHS
-

:2013.12.21

Mean Area
LHS RHS

CS Volume
LHS
RHS

2.95

36/4 Culvert Length = 2.95m

82

0.00

0.00

0.00

0.00

3.00

37/1 Culvert Length = 3.0m

83

1.933
1.770

1.385

1.85

0.69

5.55

2.08

37+480.00
37+500.00

2.40

38/1 Culvert Length = 2.40m

84

1.565
1.677

1.62

0.00

3.89

0.00

37+740.00
37+760.00

1.90

38/2 Culvert Length = 1.90m

85

1.188
1.503

0.873
1.587

1.35

1.23

2.56

2.34

38+420.00
38+440.00

3.60

39/2 Culvert Length = 3.60m

86

1.906
2.192

2.316
2.117

2.05

2.22

7.38

7.98

49+840.00
49+860.00

2.45

50/1 Culvert Length = 2.45m

87

2.067
2.140

1.708
1.571

2.10

1.64

5.15

4.02

50+120.00
50+140.00

1.60

51/1 Culvert Length = 1.60m

88

2.922
3.038

2.765
3.235

2.98

3.00

4.77

4.80

1.60

51/2 Culvert Length = 1.60m

89

2.704
2.658

2.499
2.533

2.68

2.52

4.29
=

4.03

36+900.00
36+920.00

50+300.00
50+320.00
Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)

COTRACTOR
CATIC/MAGA/A-35

Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 2.1.1

Road No

: A-35

Description :Clearing and Grabbing

Chainage

: 0+000 ~30+740

Referance : 201(1)

Sheet No

Date

Chainage

Width
(m)

Description

No.

CS Area
Mean Area
LHS
RHS
LHS RHS
3.081
2.305
2.795
1.726 2.94 2.02

50+800.00
50+820.00

1.90

51/3 Culvert Length =1.90m

90

51+360.00
51+380.00

1.60

52/1 Culvert Length = 1.60m

91

2.375
-

2.208
2.110

1.19

1.60

52/2 Culvert Length = 1.60m

92

3.278
3.166

3.514
3.388

52+060.00
52+080.00

1.40

53/1 Culvert Length = 1.40m

93

52+200.00
52+220.00

2.40

53/1A Culvert Length = 2.40m

94

6.145

51+660.00
51+680.00

:2013.12.21
CS Volume
LHS
RHS
5.58

3.83

2.16

1.90

3.45

3.22

3.45

5.16

5.52

0.00

0.00

0.00

0.00

6.180

3.07

3.09

7.37

7.42

Total Qty

Previous Paid Qty.

Balance Qty.

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
38.67

26.07

30.12

32.80

7.83

32.65

8.39

29.50

12.93
218.96

218.96

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
21.57

41.79

109.29

45.33

11.07

59.62

21.92

27.97

18.62
357.18

357.18

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
11.12

18.06

7.52

7.01

25.84

5.03

10.28

42.77

9.97
137.61

137.61

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
65.08

4.72

2.66

4.13

78.31

14.03

27.47

15.13

16.96
228.47

228.47

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
8.28

15.51

16.73

7.25

4.45

14.36

5.24

8.27

7.30
87.38

87.38

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
14.00

11.00

14.69

8.65

6.20

8.59

8.19

11.52

15.36
98.20

98.20

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
32.60

16.49

30.45

37.70

11.09

13.59

29.57

23.63

24.30
219.42

219.42

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
4.79

15.51

30.83

11.75

17.69

15.71

10.68

10.57

117.53

117.53

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
0

7.83

11.17

7.67

10.05

9.11

9.88

4.90

6.13

0.00
66.72

66.72

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
0.00

0.00

7.63

3.89

4.89

15.36

9.17

9.57

8.32
58.83

58.83

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

COTRACTOR
CATIC/MAGA/A-35

g and Grabbing

Total
9.41

5.35

10.68

0.00

14.79

40.23

40.23

OMMENDED BY RESIDENT
NEER

OMMENDED BY RESIDENT
NEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy

COTRACTOR
CATIC/MAGA/A-35

DEDUCTION FOR BRIDGES


Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 4.3.6

Road No

: A-35

Chainage

: 0+000 ~30+740

Description :Earthen shoulder as compacted in


position.
Referance : 409(1)

Sheet No

: 01

Date

Chainage
4+620.00
4+640.00

Width
(m)

Description

No.

CS Area
LHS
0.35
0.35

RHS
0.35
0.35

10.00

5/5 Bridge - Length


= 10.00m

5+061.00
5+074.00

13.00

6/1 Bridge - Length


= 13.00m

0.42
0.46

7+660.00
7+690.00

16.00

8/4 Bridge - Length


= 16.00m

8+300.00
8+360.00

53.00

9/1 Bridge - Length


=53m

8+980.00
9+000.00

10.00

:2013.12.21

Mean Area
LHS

RHS

CS Volume
LHS

RHS

0.35

0.35

3.48

3.48

0.42
0.46

0.44

0.44

5.71

5.71

0.30
0.36

0.30
0.35

0.33

0.33

5.28

5.20

0.31
0.25

0.31
0.25

0.28

0.28

14.92

14.92

10/1 Bridge - Length


= 10.0m

0.95
1.14

0.93
1.17

1.05

1.05

10.45

10.50

9+310.00
9+334.00

10/2 Bridge - Length


= 15.0m
15.00

0.54
0.63

0.54
0.63

0.59

0.59

8.79

8.79

10+060.00
10+108.00

40.00

11/1 Bridge - Length


= 40.0m

0.41
0.28

0.41
0.28

0.35

0.35

13.90

13.90

10+540.00
10+582.00

20.00

11/3 Bridge - Length


= 20.0 m

0.30
0.30

0.30
0.30

0.30

0.30

6.00

6.00

10+690.00
10+727.00

40.00

11/5 Bridge - Length


= 40.0m

0.33
0.23

0.33
0.32

0.28

0.32

11.22

12.80

Total C/F

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
EMPLOYER Road Deverlopment Authority
Central Engineering Consultancy

COTRACTOR
CATIC/MAGA/A-35

DEDUCTION FOR BRIDGES


Contract No

: RDA/RNIP/PRP1/C11

Bill Item : 4.3.6

Road No

: A-35

Chainage

: 0+000 ~30+740

Description :Earthen shoulder as compacted in


position.
Referance : 409(1)

Sheet No

: 02

Date

Chainage

Width
(m)

Description

No.

CS Area

LHS
Total B/F

RHS

:2013.12.21

Mean Area
LHS

RHS

CS Volume
LHS

RHS

11+000.00
11+040.00

12/1 Bridge - Length


= 40.0m
40.00

10

0.34
0.33

0.34
0.83

0.34

0.59

13.42

23.44

14+640.00
14+800.00

160.00

15/3 Bridge - Length


= 160.00m

11

0.38
0.27

0.38
0.27

0.33

0.33

52.00

52.00

19+960.00
20+020.00

48.00

21/1 Bridge - Length


= 48.00m

12

0.27
0.27

0.27
0.27

0.27

0.27

12.96

12.96

23+910.00
23+940.00

22.00

24/2 Bridge - Length


= 22.00m

13

0.27
0.27

0.27
0.27

0.27

0.27

5.94

5.94

24+240.00
24+300.00

25/4 Bridge - Length


= 60.00m
60.00

14

0.26
0.27

0.26
0.27

0.27

0.27

15.90

15.90

27+160.00
27+180.00

15.00

28/2 Bridge - Length


= 15.00m

15

0.27
0.21

0.27
0.27

0.24

0.27

3.60

4.05

Total Qty

Previous Paid Qty.

Balance Qty.
CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'S TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

=
RECOMMENDED BY RESIDENT
ENGINEER

COTRACTOR
CATIC/MAGA/A-35

n shoulder as compacted in

Total

(6.95)

(11.41)

(10.48)

(29.84)

(20.95)

(17.58)

(27.80)

(12.00)

(24.02)
(161.03)

COMMENDED BY RESIDENT
ENGINEER

COTRACTOR
CATIC/MAGA/A-35

n shoulder as compacted in

Total
(161.03)
(36.86)

(104.00)

(25.92)

(11.88)

(31.80)

(7.65)

(379.14)

(379.14)
COMMENDED BY RESIDENT
ENGINEER