This document is a job order sheet from September 26, 2009 with PO# 7459. It details 5 sizes of materials ordered, including the actual quantities received, job rates, actual costs, PO rates, PO values, and variances for each size. The total actual cost was 19,275 and total PO value was 29,628 with a total variance of 10,353 units.
This document is a job order sheet from September 26, 2009 with PO# 7459. It details 5 sizes of materials ordered, including the actual quantities received, job rates, actual costs, PO rates, PO values, and variances for each size. The total actual cost was 19,275 and total PO value was 29,628 with a total variance of 10,353 units.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This document is a job order sheet from September 26, 2009 with PO# 7459. It details 5 sizes of materials ordered, including the actual quantities received, job rates, actual costs, PO rates, PO values, and variances for each size. The total actual cost was 19,275 and total PO value was 29,628 with a total variance of 10,353 units.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd