Professional Documents
Culture Documents
Building Bye Laws
Building Bye Laws
%lan 0o$
/hri79iss7smt$
-------
OCCUPANCY CERTI*ICATE
Dated
>ith reference to your notice of completion dated IIIIIIIIIIIIIIIIIII) hereby certify that
building, as per description below certified plan at plot 0o IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIBloc?
0o IIIIIIIIIIIIII/cheme IIIIIIIIIIIIIIIIIIIIIIIIIIwhose plans were sanctioned vide
0o IIIIIIIIIIIIIIIIIIIIInas been inspected with reference to building bye-law in respect
of the structural safety, fire safety, hygienic and sanitary conditions inside and in the
surroundings and is declared fit for occupation$
D&/C@)%T)(0 (5 C(0/T@UCT)(0
+round 5loor
1.
3$
#$
2$
&.
4$
7.
"$
9.
1$
/econd 5loor
1.
3$
#$
2$
&nclF
*ice-Chairman
Copy of certified completion
Authority
plan
5irst 5loor
1.
2.
#$
2$
6$
4$
7.
8.
9.
10.
Barsati 5loor
1.
3$
#$
2$
89
5or
Delhi Development
APPENDI9-:H:
5(@9-)) @$ye -
-a=-8. A
5orm of reDection or compliance in respect of (ccupancy Certiflcate
#rd 5loor, *i?as 9inar,
0ew Delhi-3
0o$5$ - . Bldg$ Dated 199.
/ubDectF-(ccupancy Certificate in respect of %lot 0o IIIIIIIIIIIIIIIIIBloc? 0o IIIIIIIIIIII
/cheme IIIIIIIIIIIIIIII
Dear sir79adam,
.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIN*ith reference to your letter dated III I
3.IIIIIIIIIIIIIIIIIII>ith reference toyour 0otice of Completion dated III I
#.IIIIIIIIIIIIIIIIIIIIII)n continuation to this office letter of even 0o Idated IIIIIIIIIIIIII
on
the subDect noted above, ) am directed to infonn you that your case has been e'amined and
occupancy certificate is reDected for the reasons as given belowF-
) am directed to reAuest you yo comply with the followingF-
a. /UB9)//)(0 (5 T<& 5(LL(>)0+ D(CU9&0T/F-
.
3.
#.
2.
6.
b. @&CT)5)CAT)(0 (5 T<& 5(LL(>)0+/F-
.
3.
#.
2.
6.
4.
90
C. The following items can be regularised on paymant of compounding fee noted against eachF
/l$
0o$
1.
2.
#$
2$
6$
4$
7.
"$
!$
10.
11.
12.
#$
2$
6$
4$
8$
"
)tem
@ate of
C$ fee
Amount of C$ fee in @s$
Total C$ 5ee @s$
3$ CheAues will not be accepted and the cash paymant will be accepted on Counter 0o$ +round floor,
*i?as 9inar between 1$11 a$m$ to $11 %$9$ e'cept 3nd & 2th saturday and upto 3$11 a$m$ will be
accepted on st, #rd & 6th /aturday of the month$
#$ Oou are, therefore, reAuested to do the needful byGGGGI $$$ IIIIIIIIIIIIIIIIIIIIII$ III$ Ifailng
which your reAuest for the issue of (ccupancy Certificate will be reDected without any further
reference to you and necessary action under the law be initiated$
2$ %lease Auote your file number while sending the reply of the letters$
Oours faithfully,
5or *ice-Chairman, Delhi
Development Authority$
91
0oteF- The e'isting Anne'ure-: in the finalised draft prerared by )/) is be substituted in
To-To by the following
ANNE9URE-;
The use, converage, 5A@, set bac?s, open space, height, number of storeys, par?ing
standards etc$ for various categories of buildings shall be as per the provisions contained in
9aster7Eonal %lan and the amedments made in those from time to time$ >herever the
provision of 9aster %lan7Eonal %lan are silent on such issues or which reAuire interpretation,
the norms as decided by the competent authority shall apply$
/ome of the e'tracts relating to the above provisions from 9aster %lan as amended up
to st :une, !"# are reproduced as under F-
@&/)D&0T)AL U/& E(0& F-
)rrespective of the actual number of servants Auarters, for purpose of the density
calculations of considering layout plans, the number of servants Auarters in various si,es of
plots will be rec?oned as under F-
a.
b.
%lot upto #11 sA yardsF
%lots above #11 sA$ yards$
0il$
(neservant's Auarter per dwelling unit -361 sA$ mtr$.
+ood planning practice for designs of residential areas should includeF-
i. Light and air in the buildingH
ii. %rotection against noise, dust and local ha,ardsH
iii. (pen space for various family needsH
iv. &asy circulation and access, safety from accidentsH
v. As far as possible regular shape of plotsH and
vi. A logical arrangement of residential plots by si,e and shapes$
The translation of these reAuirements into actual planning practice would vary with
design relation and density patterns$
)0D)*)DUAL %L(T/F-
-@ow houses, detached and semi -detached houses.$
a. Dini!u! plot si%eB- The minimum si,e of an individual residential plot for a two storey, two
family dwelling, should be 36 sAuare yards$ )n the case oflow cost housing for
92
low income-group and slum re-housing, the minimum plot si,e could be "1 sA$ yds$ for two
dwelling units, one on each floor, and about ## sA$ mt$ -21sA$ yds$. for single dwelling unit two
storey building without a barsati floor$
0(T&/F
. J&ach servant's Auarter shall comprise one or more habitable room7rooms, ?itchenette7 coo?ing
varandah7space, bath room and lavatory, subDect to a minimum of a total floor space measuring
"$6" sA$mtr$ -311sA$ ft$.$
3. J5 or the purpose of density calculation, the number of persons per servant's Auarter
will be rec?oned as 3$
#. JThe number of dwelling units on a plot will be rec?oned as in the table belowF-
/l$ 0o$ %lot si,e 0o$ of dwelling units
$ 0ot e'ceeding 611 sA$ mt$ (ne dwelling
unit on each floor$
3$ Above 611 sA$ mt$ but not e'ceeding Two dweling units on each floor, whether
611 sA$ mt$ attached or detached$
#$ Above 611 sA$ mt$ but not e'ceeding Three dwelling units on each floor whether
3361 sA$ mt$ attached or detached$
2$ Above 3361 sA$ mt$ but not e'ceeding 5our dwelling units on each floor, whether
#111 sA$ mt$ attached or detached$
6$ Above #111 sA$ mt$but not e'ceeding 5ive dwelling units on each floor, whether
#861 sA$ mt$ attached or detached$
4$ Above #861 sA$ mt$ /i' dwelling units on each floor, whether
attached or detached$
b. 0lot Coverage-The plot coverage shall be as followsF-
i. a. Upto 11 sA$ yds$ -"#$4 sA$mt$.
D. Above 11 sA$ yds$ -"#$4 sA$ mt$.
but not e'ceeding #11 sA$ yds$ -361$"#$ sA$mt$.
b. Above #11 sA$ yds$ and not e'ceeding 411 sA$
yds$
iii. Above 411 sA$ yds$ and not e'ceeding 311 sA$ yds$
iv. Above ,311 sA$ yds$
Coverage on each floor
44t--M 41M
61M
21M
##$##M
%rovided that, in the areas which, prior to the establishment of the 9unicipal Corporaion of
Delhi, were included within the Durisdication of the Delhi 9unicipal Committee, the
!#
permissible plot coverage for plots not e'ceeding 311 sA$ yds$ shall be as underF-
i.
ii.
0ot e'ceeding 11 sA$yds$
Above ((sA$ yds$ and not
e'ceeding 311 sA$yds$
86M on each floor$ 81* on each floor
>ote?- -. The area to be covered used in no case be less than the permissible covered area for the
large si,e plot in the lower category$ 5or e'ample, the area to be covered in a plot of 13"$22
sA$mt$ -3#1sA$yds$. will be 21M ofl11#$# sA$mt$-,311sA$yds$. i$e$ -21$#2 sA$mts$. -2"1 sA$yds$.
and not 7# rd ofl13"$22 sA$mt$ -$3#1sA$yds$. which is only #23$" sA$mt$ -21 sA$yds.$J
c. 5loors-)n individual residential plots, normally only two storeyed buildings may be
allowed plus an optional provision of barsati floorat the top$ )n individual plots e'ceeding
48$3# sA$mt$ -311sA$yds$. a building raised on stilits may be permitted provided the stilt
floor shall be treated as one of the main floors of the building$
>here a barsati is permitted, not more than 36M of the covered area on the ground floor
or the floor immediately below the barsati or 611sA$ft$ whichever is less, should be allowed to be
covered including the area covered by a staircase leading to the barsati$ The barsati may be
enclosed$
d. 5rontage of plots-&ach individual plot should provide minimum frontage of " ft$ on the
access road, The ratio of depth to frontage should normally range between #$1 to 3$1 is to
$1$
e. /et bac? lines- The following set bac?, lines are prescribed depending upon the depth of
plot for individual plots$
f. 5ront set bac?$
Depth of plot$ 9inimum set bac? reAuuired from plot line
a. upto 41 feet 1 feet$
b. Above 41 ft$and not
e'ceeding !1 ft$ 6 feet$
c. Above !1 ft$ and not
e'ceeding 31 ft$ 31 feet$
d. Above 31 ft$ and not
e'ceeding 61 ft$ 36 fGet$
e. Above 61 ft$ and not e'ceeding 311 ft$ #1 feet$
f Above 311 ft$ 21 feet$
b. @ear set bac? line-Besides the front set bac? line, set bac? should also be provided at
the rear of the plots according to municipal bye-laws subDect to height restriction to allow
sufficient light and air circulation$
iii. /ide set bac? line-/ideset bac?s of at least 1ft$ from plot line on each side should be
left on detached plots$
!2
)n semi-detached, plots side set bac? on one side should be at least 1ft$ from the plot line to the
building line$
5 or row housing, comer plots should be suitably, set bac? from the road right of way,
according to traffic reAuirements$
f. /ervice LanesF The minimum width of the service lane shall be 6 ft$ but it may be reduced to
1ft$ in the case of law cost housing schemes sponsored by +overnment, /emi +overnment or
other public bodies$ )t is not necessary to have these in the case of detached and semi -detached
housing$ )f provided, it should have a minimum of 6 ft$ right of way$
)n the case of row and terraced housing, service lanes may be provided$ )t should have a
minimum right of way of 6 ft$ )n case the length of the lane is more than 611 ft$ the minimum
right of way should be 31 ft$
>here garages are to be provided, in order to allow for easy turn of motor vehicle, the
garages should be set bac? 6 ft$ from the centre line of the service lane$
+@(U% <(U/)0+-
+roup housing developments -two and multi storey apartmentsoflow cost housing
schemes.which will not be sub-divided into the customary streets and plots, will be governed by
good design standards to ensure open spaces and community facilities$ The intensity of use and
the net density in these are intended to be higher than that stipulated in the plan, provided the
average gross residential density of the area under development of which the group housing is a
part, is in accordance with the density reAuirement of the plan$ Also, no limits on the number of
floors is stipulated e'cept those that may be imposed in areas neaar monuments, Airports etc$
Access to dwellings could be provided by wal? way and pedestrian paths and their width would
also be governed by design reAuirements$ AdeAuate provision has to be made for par?ing &
servicing & the wal? ways should open on a residential street of at least 26 ft$ or cul-de-sac or
loop street of at least #1 feet$
)n case of group housing having more than two storeys, steps must be ta?en to ensure water in the
higher floors$ 5or this purpose booster pumps and overhead tan?s must be installed$ Lifts and
suitable stair-cases should be provided for more than 2 storey high building$ Also open balconies
for open air sleeping or air conditioning must be provided$ )n order to encourage higher storey
development which will provide more open spaces by having lesser coverage, a higher floor area
ratio is allowed$ )t is e'pected that development on group housing basis would be done according
to the Eonal Develoopment %lan$ <owever, inrespect$ofplots si,e ofless than one acre group-
housing would also be permissible subDect to the standards mentioned in foot note -#. on page 66
of the 9aster %Laan for Delhi as amended by the Table showing '%lot si,e' and 0o$ of dwelling
units given on page "!$
!6
-:-ross res)dent)al dens)ty
-%ersons per acre.$
2&" ,
&0" .
60" ,
7&" ,
11, , ,
36 , , ,
61J ,
200" ,
2&0" ,
9aB)mum Coverage
4
36
36
36
#1
##$7#M
##$7#M
35
35
#6
9a')mum 5$A$@$ 5
86 86 86
36 61
61 61
86 86
5loor area B 11
X5 $A$@$or floor area ratio---------
%lot area
5loor area is defined as plinth area on all floors unless specifically e'cluded$
>otes?
. The coverages will be calculated on the basis of the whole area reserved for +roup
<ousing after deductingF-
i. The area of collection st)Feets "1 feet wide and feeder streets 41 feet wide around
and within the group housing area$ -'@esidential streets, loop streets cul-de-sac,
service lanes will be deducted$.
D. The area for schools and other community facilities within the group housing
areaH and
iii. The area for neighbourhood par?s within the group housing area as shown in
the Eonal Development %lan -local open spaces, playground and tot-lots will not
be deducted.$
3. The above basis will apply even in the case of group housing covering an entire
rieighbourhood, the whole of which will be treated as one scheme$
#. )n density calculation for group housing, each servant's Auarter will be rec?oned as
one family$
2. The density of particular neighbourhood in which the group housing area is located will be as
shown in the Eonal Development %lan and the corresponding figure in the above table will be
operative unless otherwise prescribed in the Eonal Development %lan for a specific area$
6. The areas of barsati and mumti to the e'tent permissible for houses on individual
plots will not be rec?oned in the 5A@$
!4
D.
6A. 5or all areas in Delhi for residential development on group housing basis the 5A@ will be further subDect
to the restriction of various heights as belowF
i. A ma'imum of#4$6" mts$ -31ft$. in respect of +overnment point bloc? buildings where over-head
reservoirs -tan?s. as well as lifts and other services are to be provided in the buildings$
ii. A ma'imum of32$2 mtrs$ -"1 ft.) where lift and other necessary services are providedH and
iii. A ma'imum 1f #$83 mtrs$ -26ft$ .if such services are not adeAuately provided$
4. J+roup <ousingJ includes construction of a number of dwelling units, without customary division into
streets and individual holdings with a view to ensuring more rational distribution of space and creation of
desirable environment$ )t also includes creation of several dwelling units out of one dwelling unit by
partition$
))$ JAgricultural +reen BeltJ aand J@uralJ Use EonesF
)n order to preserve these Eones in agricultural use certain restrictions on the si,e of the dwelling units
should be imposed$ They are as folldwsF-
i. The !ini!u! si%e o1 a 1ar! shall 'e as under?-
a. (rchard & *egetable 5arm$ b. %oultry, /tud, Dairy
& other live-stoc? fanns$
- hect$
- 3 hects$
ii. The !ini!u! coverage & height o1 D4s. shall 'e as under F-
/l$ 0o$
/i,e of farm$
9a'$ coverage ofd$u$
9a'$ ht$ ofd$u$
a. hect$ & above
but less than 3 hects$
b. 3 hects & above$
11 sA$ mts$ -including. me,,anine floor.
61sA$ mts$ -including me,,anine floor.
/ingle storeyed ma'imum h$ 4 mts$
/ingle storeyed ma'imum h$ 4 mts$
0$B$ -. /et bac? for dwelling house should be 61 feet from any boundary line of the property$
-3. >here the property abuts an urban road, the dwelling house building should be set
bac? from the centre line of that road by 311 ft$' >here the property abuts a village road, the building
set bac? from the centre :inG of that road should be 11 feet$
97
-#. 0o dwelling unit should be built within t>P furlongs of the right of any 0ational
highway$
-2. )n the case of special farms, for e'ample, horse-breeding fams covering a large area,
+ovenunent may allow a large coverage as may be considered necessary for farm
houses to be built on these farm$
/. +(*&@09&0T (55)C&/F
a. The Central /ecretariat Comple'-)n order to achieve architectural composition and
intensive use, the following provisions are stipulatedF-
5$A$@$ - - - - 311
9a'imum ground floor coverage including 6M for covered par?ingF 36M
Another 6M may be allowed for covered,garage for car and cycle par?ing$ This area
for par?ing on the ground floor will not be ta?en into consideration for calculating 5A@ but the
office space above it in first and upper floors NN'ill be counted$ The total ground coverage
including covered par?ing will not e'ceed #1M$
/emi-basement will be allowed for par?ing, servicing and storage and wil not be ta?en in for
5A@ calculation$ )t shall not e'ceed the ground floor coverage$ Upto 61M of the open area
may be utillised for open par?ing and roads and the rest may be land-scaped$
b. A1 other locations induding those in District CentresF
i. 5A@ f!6 plots other than for thosedescribed in item -i. here-under 61
ii. 5A@ for plots fronting on and to the north of)ndraprastha 9arg and lying between the
Abdul 0abi 9osAue and A$+$C$@$ Bldg$ #11
". C(99&@C)AL A0D @&TA)LF
a. connaught %lace &'tension, 9into @oad and @anDit /ingh @oad-The si,e ofthe plot
will naturally depend on the layoout of the commercial area but any further sub-
division of plots in the C(illlaught place and its proposed e'tension area is not
desirable$
9a'imum 5A@ -Connaught %lace and its e'tension. 361
9a'imum 5A@ -9into @oad and @anDit /ingh @oad. 211
9a'imum floor coverage for all the floors shall be 36 percent e'cept in the case of
hotels where for ground and first floors, an additional coverage of 6 percent will be
permissible$
/emi-basement, covering not morethan the ground floor coverage, will be allowed for
par?ing, servicing and storage and will not be ta?en into 5A@ calculations$ Upto 61M of the
open area may bG utilised for open par?ing and roads and the rest may be land-scaped$
!"
There is no limit on the number of floors but will be subDect to air and light planes$
Dini!u! "et 'ac#?
5or plots fronting
61 feet wide road$
5or plots fronting
11 feet wide road and less
61 feet 21 feet
31 feet 31 feet
6 feet 6 feet
/ervice lane, if provided, should havea minimum right of 9@ly of # 1 feet$ )n case there is a
service lane on the side or rear, then set bac? for ground and first floor is optional but should
not be less then 31 feGt for second floor and above$
b. 5$A@$, Coverage etc$ for already built-up commercial areas in the walled city li?e Chandni
Chow? etc$ -List given in the 9aster %lan for Delhi. F )n such cases, coverages pemlissible
would be as applicable in the e'isting building bye-laws of the 9unicipal Cor poration of
Delhi, e$g$, "1 per cent on the ground floor and 81 percent on the first floor and so on, with
61 5 $A@$ for a two-storey construction, 311 5 $A@$ for a three-storey construction,
$ 3615 A@ for a four-storey construction and so on, provided that the 5A@ will not e'ceed 11$
c. District Centres and proposed Central Business Districts in /hahdara and Tarol Bagh-
The 5A@ and ma'imum coverage for flatted factories and +overnment (ffices in
District Centres has been stated separately$ The provision below apply to the retail, commer-
cial and service industrial area which should be wor?ed out as a composite scheme$ The
coverage is for the whole commercial area and not for plots$
5A@
District Centres upto
36 acres
District Centres more
than 36 acres$ /ub-
District Centres
61
9a'imum coverageonground floor
including covered par?ing$ #1M
9a'imum coverage on ground floor
including covered par?ing$ 36M
9a'imum 5A@ 36
9a'imum +round coverage 36M
5ront
@ear
/ides
/emi-basement for par?ing, servicing and storage may be permitted$ This should not
e'ceed ground floor coverage, and should not be ta?en into condideration in 5A@ calculation$
99
d. Community Centres and retail centres shown in the plan-
5G 11
9a'imum coverage on ground floor #6M
e.
0eighboumood shopping centres
3A
9a'imum coverage on ground floor
11 21M
>otes F-
. 5or commercial development, including offices, in all areas of Delhi, the ma'i mum
ground coverage shall be 36 percent fo r all floor e'cept that in the case of hotels an
additional coverage of 6 percent will be permissible on ground and first floors only$
3.K %ar?ing standards for various types of commercial activities shall be as bel(NvF-
Type of activity
a. Trade
b. (ffices, cinema
<otelsH -6-# /tar.
Total eAuivalent car space
$2 car spaces per !3$! sA$mtrs -111 sA$ ft$. of built up space
within the curtilage ofthe buildinglbasement, and additional
1.14 car spaces for !3$! sA$ mt$-111 sA$ft$. of built up space
within the plot outside the building, subDect to the condition
that 61 percent of the open space around the building should in
any case be left for greenary7landscaping$
$2 car space per !3$! sA$ mts$ -111 sA$ ft$ .of built-up space
within the curtilage ofthe building7basement, and an additional
par?ing, where reAuired, limited to the e'tent of $2 car
spaces per !3$! sA$ mts$ -111 sA$ ft$. of the built-up spaces,
subDect to the condition that 61 percent of the open space
around the building should in any case be left for
greenary7landscaping$
#. The ma'imum coverage on the ground floor shown against-
i. /ub-paragraph -c. against District Centres upto 36 acres$
ii. /ub- %aragraph -d. against community centres and retail centresH and
i ii. /ub- %aragraph -e. against neighbourhood shopping centres-shall be permit
ted by the coverage as indicated in 0ote -. at page !4 under )tem -3. above$
100
* ><(L&/&LL)0+
3.A..
9a'imum ground floor coverage
Basement allowed as commercial and retail areas$
9a'imum set bac?
5ront
@ear
/ides
36 feet$
6 feet$
6 feet$
61 61M
*)$ +&0&@AL >A@&<(U/)0+, /T(@A+& &TC$
3A
9a'imum ground floor coverage
9inimum set bac?$
5or plots below
72 acre
61
61M
5or plots 72
acre to acre
5or plots
above acre
5ront
@ear
/ides
6 feet$
6 feet$
(ptional
36 feet$
6 feet$
6 feet$
61 feet$ 36
feet$ 6 feet$
Basement allowed for par?ing, servicing and storage should not e'ceed ground floor
coverage and not counted for 5 $A$@$ calculations$
/pecial consideration for 5$A$@$, coverage, set bac?s, par?ing etc$ will be specified for special
trades li?e grains, oil, timber and other building materials$
*))$ )0DU/T@)AL A0D 9A0U5ACTU@)0+
a. 5latted 5actory -in central areas.
9inimum plot area
9a'imum 0o$ of floors
9a'imum coverage
5$A$@$
(ne acre$ 4
21M
61
The minimum number of floors allowed is two$ A basement not e'ceeding ground floor
coverage is allowed for storage and servicing only and will not be ta?en into acount in floor area
ratio calculations
101
9inimum /et bac?
5ront
@ear
/ides
61 feet$ 61 feet$ 31 feet$
b. )ndustrial-cum- >or? CentreF
-)n District Centre and outlying areas.$
9inimum plot area Two acres$
9a'imum 0o$ of floors$ 1
9a'imum coverage$ ##$7#M
5loor area ratio 31
The minimum number of floors allowed is two$ A basement, not e'ceeding ground floor
coverage, is allowed for storage and servicing only and will be ta?en into account in floor
area calculation$
9inimum set bac?s as for flatted factory above$
c.
/peciallndustryF-
9inimum plot area
9a'imum coverage
9a'imum height
5loor area ratio
Basement allowed as in flatted factory$
9inimum set bac?$
5ront @ear /ides
Two acres$ 6M
41 feet$ 36
d.
Light industriesF-
9inimum plot area$
9inimum frontage$
9a'imum plot area$
211 sA$ yards$ 21 feet$
Two acres$
-may be rela'ed in special cases upto 8 acres.
The following sliding scale of coverages and floor area ratios is prescribed$ A basement
will be allowed as in the case of a flatted factory F-
%lot area in acres 9a'imum plot coverage
3A
1)
3.
#.
211 sA$ yds$ to $11 acre Above
$11 acre to #$11 acres Above
#$11 acres to 8$11 acres
26M
102
61M
21M
60
60
61
11 feet$
61 feet$
31 feet$
9inimum set bac?sF-
5or plots below
1$36 acre$
5or plots 1$3,6 acres
and above upto acre
5or plots above one acre
5ront
@ear
/ides
6 feet$
6 feet$
(ptional
31 feet$
6 feet$
6 feet on one side and
1 feet on the other$
61 feet$ 61 feet$ 61
feet$
e. /ervice )ndustriesF
/ame regulation as for light industries$
\. &'tensive )ndustriesF
The following sliding scale of coverage and floor area ratio is prescribedF-
%lot area in acres
. 1$36 to $11
3. Above $11 to #$11
#. Above #$11 to 8$11
2. Above 8$11
9a'imum plot coverage
61M
26M
21M
#1M
3A 61 26 21 #1
A basement will be allowed as in the case of a flatted factory$
i71ini!u! set 'ac#s?
5 or plot si,e upto
one acre
5 or plot si,e above
one acre
5ront
@ear
/ides
*))$ )0/T)TUT)(0AL U/&/XF
31fud 61fud
6 feet 61 feet
6 feet on one side and 31 feet 1 feet on the
other
9a'imum coverage including
covered par?ing$
5or plet si,e upto
3 acres$
##$7#M
5 or plot si,e above
3 acres$
36M
X5 $A$@$ will be determined on the merits of each individual case depending upon the location
and the nature of use$ <owever, this will be further subDect to a height restriction of 32$2 meters
-"1 feet. where lifts and other necessary services are provided and #$83 metres -26 feet. if such
services are not adeAuately provided$
1#
-
"+
.
APPENDI9 :<:
@$ye-la= >o. # 83.
ADD)T)(0AL 5)@& %@(T&CT)(0 @&PU)@&9&0T/ 5(@ BU)LD)0+/ 9(@& T<A0
6 9 )0 <&)+<T A0D BU)LD)0+/ A/ C(*&@&D
BO BO&-LA >0($ 4,3$2
T-) +&0&@AL
T-$ )n addition to the provisions of %art-)* 5ire %rotection of 0ational Building Code of )ndia,
the Chief 5ire (ffice, Delhi 5ire /ervice may insist on suitable provisions in the buildings from fire
safety and fire fighting point of view depending on the occupancy and height of buildings$
T-3 /TA)@CA/& &0CL(/U@&/
T-3$ The internal enclosing walls of staircase shall be of bric? or @$C$C$ construction having fire
resistance of not less than two hours$ All enclosed staircases shall have access through self$ closing
doors of at least half hour fire resistance$ The door shall be fitted with chec? action door closers$
T-3$3 The staircase enclosure on e'ternal wall of the building Ghall be ventilated to atmosphere at
each landing$
T-3$# %ermanent vent at the top eAual to 6M of the cross sectional area of enclosure and openable
sashes at each floor level witli$ area eAual to 6M ofthe cross sectional area of the enclosure of
e'ternal wall shall be provided$ The roof of the shaft shall be at least m above the surrounding
roof$ There shall be no gla,ing or glass bric?s in any internal enclosing wall or a staircase$ )f the
staircase is in the core of the building and cannot be ventilated at each landing, a f:(sitive
pressure of 6 mm >$g$ by an eletrically operated blowerlblowers shall be maintained$
T-3$2 The mechanism for pressurising the staircase shaft shall be so installed that the same shall
operate automatically and also with manual operation facilities, when the automatic fire alarm -see
Bye law 0o$ T-ll. operates$
T-# L)5T &0CL(/U@&/
T-#$ The walls enclosing lift shafts shall have a fire resistance of not less than two hours$ /hafts
shall have permanent vents at the top not less than "11 sA$ mm$ in clear area$ Lift motor rooms
preferably be sited ';Ft the top of the shaft and shall be separated from lift shafts by the enclosing
wall of the shaft or by the floor ofthe motor rooms$
12
T - #$3 Landing doors in lift enclosures shall open in the ventilated or pressurised corridor7 lobby
and shall have fire resistance of not less than one hour$
T - #$# The number of lifts in one lift ban? shall not e'ceed four$ /haft for fire lift in a lift ban?
shall be separated from each other by a bric? masonry or @$C$C$ wall offire resistance of not less
than two hours$
T-#$2 )f the lift shaft and lift lobby are in the core of the building a positive pressure of not less
than 3$6 mm and not more than # mm >$g$ by an electrically operated blower shall be maintained
in t he lift lobby and positive pressure of not less than 6 mm >$g$ shall be maintained in t he lift
shaft$ The mechanism for pressurising the lift shaft and lift lobby shall be so installed that they
shall operate automatically when the automatic fire alarm operates$ The mechanism shall have
facilities to operate manually$
T#$6 &'it from the lift lobby shall be through a self closing smo?e stop door of half hour fire
resistance$
T-#$4 The lift machine room shall be separate and no other machinery shall be installed therein$
T-#$8 Lift shall not normally communicate with the basement$ <owever, one of the lifts may be
permitted to reach the basement levels provided the lift lobby at each basement level is
pressurised and separated from the rest of t he basement areas, by smo?e actuated fire resist ing
door of two hours fire resistance$
T -2 BA/&9&0T/
T-2$ &ach basement shall be separately ventilated$ *ents with cross sectional area -aggregate. not
less than 3$6M of the floor area spread evenly round the perimeter of the basement shall be
provided in the form of grills or brea?able stall-boards lights or pavement light or by $ way of
shafts$
T -2$3 The staircase of basements shall be of enclosed type having fire resistance of not less than
two hours and shall be situated at the periphery of the basement and shall communicate with
basement through a lobby provided with fire resisting self closing doors of half hour fire
resistance$ )f the travel distance e'ceeds "$61m, additional staircases at proper places shall be
provided$
T-6 /&@*)C& DUCT/
T-6$ /ervice ducts for electrical conduits, cables etc$ shall be enclosed by walls having a fire
resistance of not less than two hours$ Doors for inspection or access shall also have a fire
resistance of not less than two hours$
16
T-6$3 )f the cross sectional area e'ceeds sA$;$ it shall be sealed where it passes a floor by
carrying the floor through the duct$ The floor within the duct shall be pierced for any service pipe
or ventilation trun? and shall fit as closely as possible around any such pipe or trun?$
T-4 @&5U/& C<UT&/ A0D @&5U/& C<ANB&@/
T-4$ <oppers to refuse chutes shall be situated in well ventilated positions and the chutes s hall be
continued upwards with an outlet above roof level and with an enclosure wall of non-combustible
material with fire resistance of not less than two hours$ The hoppers shall not be located within the
staircase enclosure$
T -4$3 )nspection panel and hopper -charging station. opening shall be fitted with tight fitting metal
doors, covers, having a fire resistance of not less than one hour$
T-4$# @efuse chutes shall not be provided in staircase wells, air conditioning shafts, etc$ T-4$2
@efuse chambers shall have wall and floors or roofs constructed of non-combustible and
impervious material and shall have a fire resistance of not less than two hours$ They shall be
located at a safe distance from e'it routes$
T - 8 L)5T/ A0D 5)@& L)5T/F
T-8$ %ublic address system in the lift car with spea?er7telephone assembly shall be provided$
T-8$3 %rovisions for a fire lift shall be made as per the following detailsF-
a. To enable 5ire /ervice personnel to reach to the upper floors with the minimum delay, one of the
lifts shall be so designed so as to be available for the e'cusivse use of the 5iremen in an
emergency and be directly accessible to every dwelling lettable floor space on each floor$
b. The lift shall have a floor area of not less than $6 sA$m$ )t shall have loading capacity
of not less than 611 ?g$ -" persons lift. with automatic closing doors$
c. The electric supply shall be on a separate service from electric supply mains in a building and
cables run in route safe from fire, that is, within the lift shaft$ )n case offailure of normal electric
supply it shall automatically trip over to alternate supply$
d. The operation of a fire lift is a simple toggle or two button switch situated in a glass fronted bo'
adDacent to the lift at entrance level$ >hen the switch in on, landing call-points will become
inoperative and the lift will be on car control only$ >hen the switch is off, the lift will return to
normal wor?ing$ This lift can be used by the occupants in nornal times$
e. The words J5)@& L)5TJ shall be conspicuously displayed in florescent point on the
lift landing doors at each floor level$ $
f. 5or buildings above 6 m in height collapsible gates shall not be permitted for lifts
and shall have solid doors with fire resistance of 3 hours$
14
3.
T-" BU)LD)0+ /&@*)C&/
T-"$ 2lectrical "ervices
a. The electric distribution cables7wiring shall be laid in separate duct -see Bye-Law 0o T-6$.$
The duct shall be sealed at every alternative floor with non-combustible material$ having the same
fire resistance as that of the duct$
b. >ater mains, telephone lines, intercom lines, gas pipes or any other service line shall ncK be
laid in duct for electric cables$
c. /eparate circuits for water pumps, lifts, staircases and corridor lighting and blowers fa
pressuring system shall be provided directly from the main switch gear panel$
T-"$3 "taircese And ConBodor -ighting
a. The staircase and corridor lighting shall be on separate service and shall be indepedentlF
connected so as it could be operated by one switch installation on the ground floor, easilFK
accessible to fire fighting staff at any time irrespective of the position of the individual conK trol of
the light points, if any$
b. /taircase and corridor lighting shall also be connected to atlernate supply from paralleG high
tension supply or to the supply from the stand-by generator$
c. &mergency lights shall be provided in staircase corridor$
T-/$# Alternate "ource 61 2lectric "upply
A stand-by electric generator shall be installed to supply power to staircase and corridoK
lighting circuits, fire lifts, the stand-by fire pump, pressurisation fans and blowers,
smo?- e'traction and damper system in case of failure of normal electric supply$ The generator be
capable of ta?ing starting current of all the machines and circuits stated above simultaneously$ )f
the stand-by pump is driven by diesel engine, the generator supply need not be connected tc the
stand-by pump$ >here parrallel <*7L * supply is provided with appropriate transformer for
emergency, the provision of generator may be waived in consultation with Chief 5ire (fficer,
Delhi 5ire /ervice$
T-/$2 Trans1or!ers
a. )f transformers are housed in the building below the ground level it shall be necessarily in the
first basement in separate fire resisting room of 2 hours rating$ The room shall necessarily be at
the periphery of the basement$ The entrance to the room shall be provided with a steel door of 3
hours fire rating$ A curb of a suitable height shall be provided at the entrance in order to prevent
the flow of oil from ruptured transformers into other parts of the basement$ The direct access to
that transformer room shall be provided preferably from outside$ The switch gears shall be housed
in a separate room separated from the transformer bays by a fire resisting wall with fire resistance
not less than four hours$
18
#.
b. The transformer shall be protected by an automatic high pressure water spray or a foam
sprin?ler system$ >hen housed at ground floor level it7they shall be cut off from the other portion
of premises by fire resisting walls of 2 hours fire resistance$ They shall not be housed on upper
floors$
c. A tan? of @CC construction of adeAuate capacity shall be provided at lower basement level, to
collect the oil from the catch-pit in case of emergency$ The pipe connecting the catch-pit to the
tan? shall be of non-combustible construction and shall be provided with a flame-arrester$
T-"$6 Air Conditioning
a. %roper arrangements by way of automatic fire dampers wor?ing on smo?elheat detec-
tors for isolating all ducting at every floor from the main riser shall be made$
b. >hen the automatic fire alarm operates, the respective air handling units of the airconditioning
system shall automatically be switched off$
c. Automatic fire dampers shall be so arranged so as to close by gravity in the direction of the air
movement and to remain tightly closed upon operation of a smo?e7heat detectorcum-fire alarm$
d. Air ducts serving main floor areas, corridors, etc$ shall not pass through the stair wall$
e. >herever the ducts pass through fire walls or floors the opening around the ducts shall
be sealed with fire resisting materials such as rope asbestos, mineral wool, etc$
f. The air filters of the air-handling units shall be of non-combustible materials$
g. Automatic fire dampers shall be provided at the inlet of the fresh air duct and the
return air duct of each compartment7shop on every floor$
>ote?- The use of type of detectors shall be to the satisfaction of Chief 5ire (fficerF
Delhi 5ire /ervice$
T-"$4 Boiler @oom - %rovisions of Boiler and Boiler @ooms shall conform to )ndian Boiler Act$
5urther, the following additional aspects may be ta?en into account in the location of Boiler7Boiler
@oomF-
a. The boiler shall not be allowed in sub-basement but be allowed in the basements
away from the escape routes$
b. The boiler shall be installed in a fire resisting room of 2 hours fire resistance rating, and this
room shall be situated on the periphery of the basement$ Catch pit shall be provided at the low
level$
c. The boiler room shall be provided with fresh air inlets and smo?e e'hausts directly to
atmosphere$
d. 5oam inlet shall be provided on the e'ternal walls of the building at ground floor
level to enable the fire services to use foam in case of fire$
]08
T-! %@(*)/)(0 (5 5)@/T A)D 5)@& 5)+<T)0+ A%%L)A$N;C&/
- -!$ The first aid fire fighting eAuipments shall be provided on all floors including baseK
ents, occupied terrace, lift rooms in accordance with )/ 338 -!4#-@ecommendations foG $ Rr(viding 5ighting
Arrangements in %ublic Buildings in consultation with the Chief 5ir$ (fficer$
GG-!$3 The fire fighting appliances shall be distributed over the building in accordancewitl I!1 Code of practice for
selelction, installtion and maintenance of portable first aid fire aupliances$
T-)( 5)B&D 5)@& 5)+<T)0+ )0/TALLAT)(0/
--1$ Buildings above 6 m$ in height depending upon the occupancy use shall be pro ected by wet riser or sprin?ler
installation system with the fire service connections at th- Gase or sprin?ler installation as per details given belowF
Type of the Building7(ccupancy 1
@eAuirements 3
31 Apartment buildings below 6m$ in height irrespective of floor area
0)L
$+7., Apartment buildings e'ceeding 6m$ in height
>est @isers and -or.Down Comers
$ ,on-apartment buildings 6m$ and above in height irrespective of floor area
>et @isers and -or .Down Comers
All basements, sub-basements having pecial ris?s li?e storage of ha,ardous and e'plosive material in a building 6m$
and above
<igh %ressure >ater /pray or foam /prin?lerX /ystem$
G Any of the above categories may incorW(rate an automatic sprin?lerX 7drencher -,ystem, if the ris? is such that
reAuires
$ stallation of such protective methods $
U$U$$$$ ose buildings provided with smo?e7heat detection system bac?ed by 32 hour careta?er
in fire fighting. staff, the installaation of sprin?lers need not be insisted$
1!
The hydrants shall be provided within the court-yard, the location of which shall be
decided in consultation with the Chief 5ire (fficer$
>ote? The Dry @iser installations may be permitted by the Chief 5ire (fficer, Delhi 5ire
/ervice, for buildings under -b. and -c. for heights above 6m$ and below 32m$ if he is
satisfied with the arrangements for water supply and provision of static water storage tan?$
T-l 1$3 The >et @iser installations shall conform to )/ F #"22-!44 Code of %ractice for
installation ofintemal fire hydrants in multi-storey buildings$
)n addition, >et @isers shall be designed for Eonal distribution ensuring that unduly
high pressure are not developed in risers and have ripes$
)n addition to wet risers, first-aid hose reels shall be installed on all the floors of the
buildings and shall conform to )/ F ""2-!4! /pecification for first-aid hose reel for fire
fighting -fi'ed installations.$ The first aid hose reel shall be connected to one of the female
couplings of twin couplings of landing valves of the wet riser installations by meansK of
adopter$
T-)($3$ The riser shall be fed through the booster pump either of the two water sources round
the cloc?F
a. Town mains of suitable si,e which can supply reAuisite Auantity of water$
b. /tatic tan?sF The capacity of the static tan? shall be given as belowF
i. Apartment building 6m and above in height but below 32m in height$ 61,111 Litres
ii. 0on-apartment building 6m and above but below 32m in height used
for mi'ed occupancies li?e office, shops, depmiment stores$ ,11,111 Litres
iii. Apartment building 32m and above in height$ ,11,111 Litres
iv. 0on-apartment building 32m and above in height$ 3,11,111 Litres
>ote? - )n case of group housing of apartment building 6m mld above in height but below
32m a centrally located tan? having a capacity of3,11,111litres may be provided$
>ote? 3-The above Auantities of water shall be e'clusively for fire fighting and shall not be
utilised for domestic or other use$
T-)1$3$3 "tatic 9ater "torage Tan#-A satisfactory supply of water for the purpose of fire
fighting shall always be available in the form of underground static storage tan? with capacity
specified for each building by the local 5ire Authority with arrangements of replenishment by
town's main or alternative source of supply S 111 litres per minute$ The static storage water
supply reAuired for the above mentioned purpose should entirely be accessible to the fire
engines of the local 5ire service$ %rovision of suitable number of manholes shall be made
available for inspection, repairs and insertion of suction hose etc$ The covering slab shall be
able to withstand the vehicular load of " tons$
110
T-)($3$# To prevent stagnation of water in the static water storage tan? the suction tan? ot tile
domestic watet supply shall be fed only through an over flow arrangement to maintain the
level therein at the minimum specified capacity$
T -13$2 The static water storage tan? shall he provided with a fire bri gade co llocting
hreaching with 2 0os$-46mm dia$ instantaneous male inlets arranged in a valve bo' at a suitahle
point at street level and connected to the static tan? hy a suitahle fi'ed pipe not less than 6cm dia$
to discharge water into the tan? when reAuired at a rate of 111 litres per
!inute.
-+.Go?TlotG0tinGers-Auto!atic hfgG pres;-ff8 i#$l%&f #'Ill( o( 1oa! s'dn)#m
II F$$ -J'GJ'GJJJJN$U$JFF'N$t. "\"+)"1.+9.$1.. cFF
"" .8... ".$,.. \"9$)$)/.~ IN+0\+1$$."\. GN'RN$Gt, $$U
++: ~\. \.~~\\ tFH,GNNG'MNN
'N.nGGJThGGJ'G,GGGGGGGGGG GG GG GGG GG GG GGGG-,GG'-GG G GGGGGGG G'Jticle, laundry etc$
b. (n floors used as departmental stores, shops and trades involving fire ris?s$
c. (n all floors of the buildings other than apartment building, ifthe height of the building
e'ceeds 26m$
>ote?-"ee 5ootnote under Table T-)($: across /l$0o$-d. & -e.
T-)($2 Car'on Dio3ide :ire 23tingushing "yste!-:i3ed C13 fire e'tinguishing installation shall be
provided as per )/H4#"3-!8 Code of %ractice for design and installation of fi'ed C13 fire
e'tinguishing system on premises where water or foam cannot be used for fire e'tinguishment
because of the special nature of the contents of the buildings7areas to be protected$
T-l 5)@& ALA@9 /O/T&9
T -$ All buildings above 6m in height shall be eAuipped with fire alarm system as given in bye-
layvs 0o$ T-$$ and T-$$3$
T-l$$ ;esidential $uildings @D=elling Houses+ $oarding Houses & Hostel.sA.
a. All residential building li?e dwelling houses -including flats., boarding houses and hostels shall be
eAuipped with manually operated electrical fire alarm system with one or more call bo'es located at
each floor$ The location of the call bo'es shall be decided after ta?ing into consideration the floor
plan with a view to ensure that one or the other call bo' shall be readily accessible to all occupants of
the floor without having to travel more than 33$6 m$ b. The call bo'es shall be of the 'brea?-glass'
type without any moving pmis, where the call is transmitted automatically to the contorol room
without any other action on the part of the person operating the call bo'$
c. All call bo'es shall be wired in a close circuit to a control room, located as per Bye law 0o$ T-3
so that the floor 0o$ from where the call bo' is actuated is clearly indicated on the control panel$ The
circuit shall also include one or more batteries with a capacity of 2" hrs normal wor?ing at full load$
The battery shall be arranged to be a continuosl y tric?lecharged from the electric mains$
d. The call bo'es shall be arrange to sound one or more sounders so as to ensure that all
occupants of the building shall be warned whenever any call bo' is actuated$
e. The call bo'es shall be so installed that do not obstruct the e'it-ways and yet their location
can easily be noticed from either direction$ The base of the call bo' shall be at a height of m
from the floor level$
T-ll$l$3 All other building - All buildings other than as indicated under Bye-law 0o$ T-l$$
shall, in addition to the manually operated electrical fire alarm system, be eAuipped with an
automatic fire alarm system$ The latter shall be in addition to the alarm which may be sounded
by the actuation of any automatic fire e'tinguishing system which may be installed in any
particular occupancy in accordance with these bye-laws$ Unless otherwise decided by the
Chief 5ire (fficer, Delhi 5ire /ervice, the detectors for the automatic fire alarm system shall
conform to )/ F386-!43-<eat /ensitive 5ire Detectors and the system shall be installed in
accordance with )/-3"!-!43 Code of %ractice for Automatic 5ire Alarm system, or any
other relevant )ndian /tandards prepared from time to time$
>6le? /everal types of fire detectors are available in the mar?et, but the application of each
type is limited and has to be carefully considered in relation to the type of ris? and the struc-
tural features of the building where they are to be installed$
T-3 C(0T@(L @((9
T-3$ There shall be a control room on the entrance floor of the building with communica-
tion system -suitable public address system. to all floors and facilities for receiving the
message from different floors$ Details of all floor plans alongwith the details of fire fighting
eAuipment and installations shall be maintained in the Control @oom$ The Control @oom shall
also have facilities to detect the fire on any floor through indicator boards connecting fire
detecting and alarm system on all floors$ The staff incharge of control room shall be
responsible for the maintenance of the various services and fire fighting eAuipment and
installatiions$
T-# <(U/& T&&%)0+
T -# $ To eliminate fire ha,ards a good house ?eeping inside the building and outside the
building shall be strictly maintained by the occupants and7or the owner of the building$
T -2 5)@& D@)LL/ A0D 5)@& (@D&@/$
T-2$ 5ire notices7orders shall be prepared to fulfil the reAuirements of the fire fighting and
evacuation from the building in the event of fire and other incidents$ The occupants shall be
made thoroughly conversant with their action in the event of the emergency, by displaying flire
notices at ventage points$ /uch notices should be displayed prominently in broad lettering$
3
2.
APPENDI9:L:
-Bye-laws 0o$ 3$ and 3$3.
0U9B&@ A0D TO%& (5 L)5T/ 5(@ D)55&@&0T (CCU%A0C)&/
A0D /%AC&/ 5(@&L&CT@)CALl0/TALLAT)(0/$
T-$ The number and type oflifts reAuired depending on the capacity oflift, speed, nature
of operation are as given in Table 33 and 3#$
TABL& 33 0U9B&@ A0D TO%& (5 L)5T/ 5(@ 0(0-@&/)D&0T)AL 9UL T)/T(@&O&D BillLDl0+
0o$ Capa- /peed 0o$ of persons that can be carried by a lift
of city of in m7s in4 9in$ in #1 9in$ in 61 9in$ in 41 9in$
floors lifts in 9anually Automatic 9anually Automatic 9anually Automatic 9anually' Automatic
persons operated operated operated operated
-
,1) -3. -#. -2. -6. -4. -8. -". -!. -1. -. -3.
w
$ 8 4 1$4-1$86 8 13 - 81 - 312
3$ 8 " 1$4-1$86 33 - #3 - 331 - 342
#$ 8 1 1$4-1$86 34 - 64 - 341 - #3
2$ 8 1 #1 - "1 - #11 - #41
6$ 8 # #8
-
33 #81 - 222
4$ 4 1$4-1$86 - 81 - 6 - 21
8$ " 1$4-1$86 6 - !1 61 - "1
"$ 11 1 1$4-1$86 " - 1" - "1 - 34
!$ # 1$4-1$86 33
-
#3 - 331 - 342
1$ 11 1 3 - 34
-
31 363
TA+LE 22 CONTINUED=
,1) -3. -#. -2. -6. -4. -8. -". -!. -1. -. -3.
$ 1 $6 32
-
22
-
321 - 3""
3$ # $6 3" - 64 - 341
-
#3
#$ # $6 #3 - "1 - #11
-
#41
2$ 4 1 8 - 11 34 81 31 312 363
6$ 4 # 31 32 31 26 311 321 321 3"1
4$ 4 # $/ 3# #1 #" "1 3#1 #11 384 #41
8$ 4 4 $6 36 ## 61 !" 361 ##1 #11 #64
"$ 3 1 $6 " #3 1" #3 "1 331 34 342
!$ 3 # $6 3 34 34 64 31 361 363 #3
~
31$ 3 4 $6 3# 28 #" 4" 3#1 3"1 384 ##4
.:$$..
0oteF a. 5or all non-residential buildings, the traffic cleared in 61 min$ is considered adeAuate and is approved
by Authority$ As such for calculating the 0o$ of lifts reAuired, the rate of the clearance oftraffic in
Col$ ! & 1 and the population may be ta?en into consideration$
b. )n addition to total number of lifts reAuired as above, provision of one lift of the same capacity may
be considered to serve as stand-by$
0ote 3
0ote #
0ote 2
0ote 6
Table-22
CONTD
The poulation may be wor?ed out on t he basis of the useful carpet area which the perons
occupy -e'cluding area of verandah, lobbies, halls, passages$ lavatory bloc?s etc$.$
The population on ground and first floor may not be ta?en into consideration since these floors
are not generally served by lifts$
1$86 metre per sec$ eAuivalent to 61 ft$per
min$ $11 metre per sec$ eAuivalent to 311
ft$per min$ $6 metre per sec$ eAuivalent to
#11 ft$ per min$
The heights of building for lift installation, i$e$, the travel on the lift presumed in the above state-
ments is as below F-
(
I
,1)
-3.
-#.
-2.
8 5loors
33 5loors
4 5loors
3 5loors
3$1m$ ##$1m$ 2"$1m$ 42$1m$
Table-24
0U9B&@ A0D TO%& (5 L)5T/ 5(@ @&/)D&0T)AL BU)LD)0+
/l$ 0o$ of %assenger Lift /peed in m7s Landing +ate Central /ervice Capacity Type of Cental
0o$ 5loors 0o$ Capacity Type /ystem Lift 0o$ %ersons +ate /ystem
%ersons
3 # 2 6 4 8 " ! 10
1. 6 to " 3 4 ($(to 1$6
5 Automatic push 5
-
-
burton operation
both from car
and landing
3$ !to 3 " 1$4 tol
5
-do "
5
%ush button car
handle
switch control
" to # 3 " 1$4 to 1$82
5
Automatic push "
5
-do-
1- !.
buttom operation
both from car
and landing
v$ithout down
collection system$
4 %ower -do-
operated
doors
2$ #tol! 3 "
5
-do- l "
5
-do-
3 " %ower
operated
doors
5 5or building more than 6m in height collapsible gates shall not be permitted -/ee Bye-law 0o$ T-8 -3. *+,.
L-3 ;<te dimensions =>? relevant information ler lin well, pit depth, machine room, clearance from top floor landing to
machine room flooring is given in Table 32$
TABL& 32 D)9&0/)(0/ A0D @&PU)@&D )05(@9AT)(0 5(@ L)5T )0/TALLAT)(0 )0 BU)LD)0+
Carrying capacity oflift Yn lift Dimensions of Leading pit Dimension of Clearance )mposed loads in
in ft$ load speed Lift >ell &ntrance depth machine room from top tonnes 011 top of lift
-persons. -Tg$. 5ront Depth <eight 5ront Depth floor well due to lift
em em cm landing to installation$ )t may
machine be noted that
room figures do not
flooring include weight of
cm the machine from
floors and well setc$
- . -3. -#. -2. -6. -4. -8. -". -!. -1. -. -3.
-.l
2 383 Upto & inclu- 86 6 81 213 #13 863 262 61 4$6
ding m7sec$
4 21" -do- !6 #6 "1 21 3#1 ##6 386 261 8$1
" 622 Upto = incu- 311 81 "1 61 326 #!6 386 261 "$6
ding m7sec$
Upto & includ-
ing $6m7sec$
1 4"1 -do- 336 81 !1 61 326 #!6 #16 281 1$6
# ""2 -do- 3#6 "1 !1 61 326 236 ##6 281 #$1
4 1"" -do- 366 316 16 61 326 631 ##6 2"1 2$1
31 #41 -do- 366 331 16 61 326 631 ##6 2"1 6$1
1
1 0(T&F i.
ii.
iii.
iv.
All lift well dimensions are minimum clear finished plumb reAuirements$
>here more than one lift is located in the lift well, e'tra width for 1 em$ separator beam should be
provided$
)m7sec$L311 ft$7min$
The height of the landing entrance shall be 31 em$ -about 8 ft$. for all lifts$
L-# /%AC&/ 5(@ &L&CT@)CAL )0/TALLAT)(0/
The spaces reAuired for different electrical installations are given at L-#$ to L-#$#$
L-#$ 2lectric "u'-station- The norms given in L-#$$ and L-#$$3 shall be adopted for provision of space for
sub-station$
L$#$$ A@&A @&PU)@&9&0T/ 5(@ /UB-/TAT)(0
5or the buildings with a total covered 61-311 sA$m$ with a clear height of minimum
area upto 31,111 sA$m$ #$4 m$ without any beam obstructions above
the finished floor$
. 5or the buildings with a total covered #11-211 sA$m$ with a clear height of minimum area from 31,11
sA$m$ to 21,111sA$m$ #$4 m without any beam obstructions above the finished floor$
Ji. 5or the buildings with a total covered To be specifically ascertained in advance
area above 21,111 sA$m$ from the &lectricity Deptt$ -Authority. before
preparation of the plans$
The floor of the substation shall have cable trenches of 1$4 m$ depth the layout for which J-ill be given at
the time of actual construction$ 5or th is purpose, a dummy floor of 1$4 m 'Fcpth shall be provided to facilitate
cutting7digging of floor for installation of eAuipments GGd ma?ing subseAuent changes in trenches$ This floor
shall be capable to withstand mini-urn load of 1 totmes of each transfomler mounted on four wheels$
The brea? up spaces reAuired for different installations in a substation are given as belowF upply company's
switchgear room and7or space for meters$
Trans1or!er ;oo!s- The number and si,e of transformer rooms shall be ascertained -L-JJ'Fn the total power
reAuirements ofthe comsumer$ To determine the si,e of transformer and I$Glarance around a transformer,
reference may be made to good practice -)/F""8-!48 ce of %ractice for )nstallation and 9aintenance of
Transformers.$ A 611 T* A transformer e provided with a min$ space of 2m '2m$
;-- --sformer is to be installed outdoor space sba'be provloeo on -sNllih'Ctl N-'mGXGy - -Ic. adeAuate provision
for safety enclosure is to be made$ 5or transformers having Fontent -more than 3111 litres., soa?-pits are to be
provided in accordance with
- U$ F)ndian &lectricity @ules, !64$
6. 4.
- +B,age "=itch ;oo!s- )n case of sub-station having one transformer, the owner is rovide only one high
voltage switch$ )n the case of single point supply for two -.-7. the number of switches reuired is # and for 'n'
transformers the number of
-GG $6 +$J.+ plus $ The floor area reAuired in case of a single switch will be roughly
ri for every additional switch the length should be increased by m$
1 @9
4A -o= 5oltage "=itch ;oo!s-The floor area reAuirement in respect oflow voltage switchgear
room be determined by any formula$
5A ;oo!1or "tand 'y /enerator-A room space not less than 4m ' !m may be provided for
housing a standby generator set of 61 T>$
L-#$$3 (T<&@@&(U)@&9&0T/5(@/UB/TAT)(0
. The substation will preferably be located on the ground level failing which it can be in the
basemant floor but in no case at higher floors$
3. The entire space will be provided at one floor in continuation$
#. The min imum width ofth e substation space shall not be less than 4m$
2. The areas given above in respect of the different categories of rooms hold good if they are
provided with windows and indepenent access doors$
6. All the rooms should be provided with partitions upto the ceilings and shall have proper
ventilation$ /pecial care should be ta?en to ventilate the transformer rooms and where nec-
essary louvers at lower level and e'haust fans at higher level shall be provided at suitable
locations$
4. )n order to prevent storm water entering the transformer and switch rooms through the soa?-
pits, the floor level of the substation shall be at least 6 cm$ above the highest flood water level
that may be anticipated in the locality$
L-#$3 CABL& T@&0C<&/, /<A5T/ &TC$
L-#$3$l /uitable number of vertical shafts, rising mains, distribution bo'es etc$ shall also be
provided as per the reAuirements at suitable locations$ Cable trenches with suitable handy
covers for entry of the cables upto the substation from the street7adDoining building and from
the substation onwards upto the street adDoining other building shall also be provided as per the
reAuirements$ These vertical shafts, rising mains, distribution bo'es, cables, trenches etc$ shall
be so constructed as to be accessible only to the authorised personnel$ The rising mains and
other installations in the vertic$al shafts, tap-off bo'es, distribution bo'es etc$ reAuired at each
floor shall be provided, installed and maintained by the owner at their own cost$
AdeAuate enclosed space shall also be provided at each floor installation of eAuipments for
distribution on respective floor such as distribution bo'es, cut-out and meter bo'es and main
switches$
L-#$3$3 -ocation o1 "=itch ;oo!-<n large installations other than where a substation is
provided, a separate switch room shall be provided, this shall be located as closely as possible
to the electrical load centre and suitable ducts shall be laid with minimum number of bends
from the point of entry of the supply to the position of the main switchgear$ The switch
120
room shall also be placed in such a position that rising ducts may readily be provided therefrom to
the upper floors of the building in one straight vertical run$ )n larger buildings, more than one
rising duct and hori,ontal ducts may also be reAuired for running cables from the switch room to
the foot of each rising main$ /uch cable ducts shall be reserved for the electrical services only
which may, however, include medium and low voltage installations$ such as call-bell systemsH
telephone installations should be suitably segregated$
,
L-#$3$# -ocation and ;eFuire!ents o1 Distri'ution 0anels- The electrical central gem distrbution
panels and other apparatus, which are reAuired on such floor may conveniently be mounted
adDacent to the rising mains, and adeAuate space should be provided at each fl((l for this
purpose$
L- #$3$2 -ocation and ;eFuire!ents o1 0 $Jl0 A$J ;oo!-<n1or!ation regarding provision for
and location of%BBl% ABB @oom, tellephone outlets and risers shall be ascertained from the
relevant authority$ AdeAuate space should be provided for installation of sub-distribution board$
L-#$# +&0&@AL$
L-#$#$l The maintenance of the built up space for electric substation, distribution eAuipment,
vertical shafts and enclosure at each floor shall be done by the owner$
L-#$#$3 The standby arrangement for eiectricity supply upto and including the sub-station
eAuipment and distribution pillars at the suHRstation shall be provided compulsorily$ The foG
lowing rules shall apply for the costs of the installationsF
. )n the case of 9ulti-occupancy multi-tenancy7multi-ownership buildings, 61 per cent of
ma?ing the electricity supply arrangements upto and including L$T$ main controlling switch in the
substation -including normal and standby arrangements. shall be chargeable to the (Nvners
promoters of the proposed building$
3. )n the case of single tenancy7single ownership7single occupancy buildings, the cost of
providing @T$ cable -e'cluding first #1 meters not falling in the proposed building premises., L$
T$$ out -going switch panel for the normal supply arrangements, and the entire distri bution
eAuipment -for the proposed building. including meter bo'es shall be at the cost of the owner$
The entire cost of standby arrangement shall be chargeable to the owner$
#. The Authority shall have the right to suppply electricity from the substations established in the-
buildings, as mentioned in -. J$nd -3. above to the outside consumers$
2. )n case any owner of single tenancy7single ownership7single occupancy buildings desires the
substation for his7their e'clusive use, the cost of@T$ /witchgear, transformers and the connected
L$T$ main controlling switchgear for nomlal supply arrangements shall also be chargeable to the
owner$
121
APPENDI9-M
-to be submitted on non-Dudicial stamp paper of@s$ 37- duly attested by (ath Commissioner.$
A>>i#a0i"lU n#er"a2in?
That )>e have submitted building plans for construction of building on %lot
0o $$$$$$$$Bloc? 0o $$$$$$$$$$Located at$$ $$$$$$$$$$$$$$$$$to the D$D$A$ under section 3 of the D$D$Act$
for favour of sanction$
That )>e hereby give an underta?ing that during the course of construction of my7our
building as per sanction given by the D$D$A$ )7>e shall not stac? building material7mulba on the
DDA land7road$
That in case, )7>e am7are found stac?ing the building material, mulba on DDA land7 road
than the Authority shall be at liberty to charge the stac?ing charges S @s$37- per sA$ mtr$ besides
any other action which the DDA might li?e to ta?e as per the rules including payment of the
penalty of@s$ 6117-$
5eri1ication? Deponent
)>e the above named deponent do hereby solemnly affirm and verify that )>e have
voluntarily made the above affidavit and its contents are true to best of my7our ?nowledge$
*erified at Delhi on this day $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$of$$ $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
Deponent
122
APPENDI9-N
)0D&90)TO B(0D 5(@ BA/&9&0T
-to be submitted on non-Dudicial stamp papper of@s$ 17-duly attested by
the (ath Commissionner.$
This )ndemnity Bond is e'ecuted by /hri IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIane
/hri IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIson of/hri IIIIIIIIIIIIIIIIIIIIIIIIIIIIII
residents of $$$ IIIIIIIIIIIIIIII$I A """""". """"""""""."A "" ~ """"""""hereinafter called the owners of %lot
0o IIIIIIIIIIIIin IIIIIIIIIIIII0ew Delhi in favour ofDDA, its successors or entitled$
><&@&A/ the owners have submitted the plan of basement llider & whereas the owners
have represented to the DDA that if sanction is granted for the construction of the said basement
the owners shall )ndemnify the DDA if any loss at the time of digging of f(llidation ofthe said
basement or in the course of construction of the basement or even thereafter$
A0D ><&@&A/ the said owners have fmther agreed to indemnify the DDA of any
claims put up against the DDA either by way of compensation or in any other way in case the
DDA is reAuired to pay any such amount to any person or the owner or owners ofthe adDoining
properties$ The owners hereby agree and lliderta?e to indemnify the DDA to pay the full e'tent
ofth e amount the DDA may reAuire to pay in the e'tent hereinabove mentioned$
The owners further underta?e and agree to indemnify the DDA for any such amount the
DDA may reAuire to pay either by way of compensation or damage or any other amount and
further underta?e to indemnify the DDA of all cost and e'penses that the DDA may reAuire to
defend any such action in any court oflaw$ The owners underta?e that no e'cavation shall be
carried out beyond the boundaries of the plot$ Any damage occuring during or due to the
e'cavation made at site to public sewers, water drains shall have to be made good by the owners$
)n consideration of the above matter, underta?ing and indemnity given by the said owners
the DDA hereunder in this behalf grant the sanction in the said basement to the said owners$
)0 >)T0&// <&@&(5 the owners abovementioned put their hands and seal to the
said )ndemnity Bond on this IIIIIIIIIIIIIIday of IIIIIIIIIIIIIIIIII
>itnessesF
,1) """"""""""""""""""""""
-3. IIIIIIIIIIIIIIIIIIIIIII
-&'ecutants.
3#
APPENDI9-:O:
5ormG
-Affidavit to be submitted under Urban Land -Ceiling and @egulations. Act, !84 on-
non-Dudicial stamp paper of@s$ 37- duly attested by (ath Commissioner for plots upto 611 sA$
mtrs$ in area.$
Affidavit of /hri son of /hri
-------------------- ----------$-----
age IIIIIIIIIIIIIresident of IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
), IIIIIIIIIIIIIIIIIIIIIIIdo hereby solemnly affirm and declare as underF-
$ That )7>e are the holder of plot 0o IIIIIIIIIIIIIIIIIBloc? 0o IIIIIIIIIIIIIIIsituated
at IIIIIIIIIIIIIIIIIIIIIIIIIImeasuring IIIIIIIIIIIIIIIIIIIIIIIsA$mtrs-
3$ That ) propose to construct a building over the aforesaid plot ofland$
#$ That ) have submitted the plans for the construction of a building over the said plot of land
for sanction vide my letter dated--------
2$ That the aforesaid plot ofland is the only plot of vacant :and hold by me in any of the urban
agglomerations covered under the Urban Land -Ceiling and @egulations. Act, !$84, and that
the e'tent ofrhat plot is within the ceiling limit on vacant land imposed by the said Act$
6$ That ) do not hold any other vacant land or any other land with building with a dwelling unit
therein in any or the urban agglomerations covered under the said Act$
4$ That )n the event of the aforesaid plot ofland being declared as e'cess by the competent
authority under the Urban Land -Ceiling and @egulations. Act, !84, ) shall abide by the
decision of the competent authority under that Act$
Deponent
5eri1ication $'
)7>e the above named deponent do hereby solemnly affirm and verify that )7>e have
voluntarily made the above affidavit and its contents are true to the best of my7our ?nowledgeF-
*erified at Delhi on this day IIIIIIIIIIIIIIof IIIIIIIIIIII
Deponent
124
APPENDI9-:O:
5orm-))
-Affidavit to be submitted under Urban Land -Ceiling and @egulations. Act, !84 on
non-Dudicial stamp paper of@s$ 37- duly signed by (ath Commissioner for plots above 611 sA$
mtr$ in area.
Non-Re%i#en"ial +uil#in?%
Affidavit of IIIIIIIIIIIIIIIIIIIIIson of/hri IIIIIIIIIIIIIIIIIIIIIIIIIIIII
and owner of %lot 0o$ IIIIIIIIIIIIIIIIIIIIIIIIIII
>e----------Gdo hereby solemnly affirm and declare as underF-
$ That we are the holder of %lot 0o-----Bloc?---sKituated at-----measunng
3$ That we propose to construct a building over the aforesaid plot of land$
#$ That we have submitted the building plan for the construction of a non-residential building
over the said plot for the purpose of industry for sanction -* ide letter 0o $-------dated-------.$
2$ That the e'tent of the aforesaid plot ofland does not e'ceed 73 an acre -in' A' category.,
one acre in other category Urban agglomerations that this e'tent together with the e'tent of
other vacant land and lands on which there are buildings with dwelling units held by us ir
Urban agglomeration e'ceeds the ceiling limit on vacant land imposed by the Urban Lane'
-Ceiling and @egulations. Act, !84 and that we have filed the statement before the con-
ceined competent authority as reAuired by section 4 of the Act and have also applied to thG
/tate +ovt$ for e'emption for the purpose of the industry and that the building shall be con-
structed in the aforesaid plot of the land for the purpose of industry and that the aforesaici
portion ofland is declared as e'cess vacant land by the competent authority we shall abidG
y the decision of the competent authority$
Deponent
5ari1ication F
)7>e the above named deponent do hereby solemnly affirm and verify that )7>e have
yoluntarily made the above affidavit and its contents are true to the best of my7our
?nowledge$
*erified at Delhi on this day---Gof-------
Deponent
36
APPENDI9-:O:
5orm-)))
-)ndemnity Bond to be submitted under Urban Land -Ceiling and @egulations. Act, !84 on
non-Dudicial stamp paper of @s$ 17- duly attested by the (ath Commissioner.$
INDEMNITY +OND
This D&&D of)ndemnity is made this IIIIIIIIIIIIIIIday of IIIIIIIIIIIby IIIIIIIIII
son of resident of
That ) am the holder of plot 0o--------Bloc? 0o-------situated at----------
m'easuring-----------sA$mtrs$
And >hereas ) propose to construct a building over the said plot of land$
And >hereas ) submitted the building plan for the construction of the building over the
said plot ofland for sanction with DDA------------,-*ide letter file 0o$----Dt$------as reAuired by
section'----ofthe Urban Land -Ceiling and @egulations. Act, !84$
A$$nd >hereas the DDA has agreed to sanction the building plan on the aforesaid
underta?ing$
0(> T<)/ D&&D >)T0&//&/ that in pursurance of the aforesaid affidavit and in
consideration ofDDA having agreed to sanction the building plan submitted -vide my appli cation
0o$-------,dated-------------in respect of the plot of land situated at--------------------- and referred to
above$ ) hereby underta?e to indemnify and ?eep harmless the DDA from all proceedings in coms
and before other authorities including the competent authority under Urban Land -Ceiling and
@egulations. Act, !84, all e'penses7losses7claims which the DDA may incur or become liable to
pay it to the building plan in respect of aforesaid plot$
) further state that ) and all my successor in interest shall abide by the aforesaid terms and
conditions of this D&&D of)ndemnity$
>itnessesF
,1)-----
-3.------
-&'ecutants.
34
APPENDI9-:O:
5(@9-)*
*OR RESIDENTIAL +UILDIN@
-Affidavit to be submitted under Urban Land -Ceiling and @egulations. Act,!84, on non-
Dudcial stamp paper of@s$ 37- duly attested by the (ath Commissioner for plots above 611 sA$
mts$in area.$
Affidavit of/hri,--------son of--------/hri---- --- --- - aged----- resident of-----------
),----------Gdo hereby solemnly affirm and declare as under F-
$ That ) am the holder of plot 0o,-------situated at measunng--
sA$mtrs$
3$ That ) propose to construct a building over the aforesaid plot of land$
#$ That ) have submitted the building plan for the con struction of a residential building over the
said plot of land for sanction -vide letter 0o----Dated-----.$
2$ That the e'tent of the aforesaid plot ofland7together with the e'tent of other vacant lands and
lands on which there are buildings with dwelling units held by me or in urban agglomerations
e'ceeds the ceiling limit on vacant land imposed by the Urban Land -Ceiling and @egulations.
Act, !84 and that ) have filed7shall file the statement before the concemed competent authority
as reAuired by /ection 4 of that Act and that the building shall be constructed in the aforesaid plot
ofland in such manner that it would be possible for the competent authority to declare that portion
of the land that may be occupied by the building as not in e'cess of the ceiling limit aforesaid and
that in case the aforesaid portion of land is declared as e'cess vacant land by the competent
authority ) shall abide by the decision of the competent authority$
Deponent
5eri1ication?
) the abovenamed deponent do hereby solemnly affirm and verify that ) have voluntarily
made the above affidavit and its com tents are true to the best of my ?nowledge$
*erified at Delhi on this $$$$$$$$$$$$$day $$$$$$$$$$$$$$$$$
Deponent.
38
8.
APPENDI9-:P:
@$ye--a= >o. .A
PUAL)5)CAT)(0 (5 L)C&0/&D T&C<0)CAL %&@/(0'0&L 5(@%@&%A@A T)(0
(5 /C<&9&/ 5(@ BU)LD)0+ %&@9)T A0D /U%&@*)/)(0
%-l +&0&@AL
%-$ The Aualifications of the technical personnel and their competence to carry out different Dobs
for building permit and supervision for the purpose of licensing by the Authority shall be as given
in Bye-law %-3 to %-4$ The procedures for licensing the technical personnel is given in Bye-law %-
4$
%-3 A@C<)T&CT
%-3$ Euali1ications-The Aualificatiions for licensing of Architect will be the Associate
9embership of the )ndian )nstitute of Architects or such Degree or Diploma which ma?es him
eligible for such membership or such Aualifications listed in schedule B)* of Architects Act, !83
and shall be registered under the Council of Architecture as per Architects Act, !83$
%-3$3 Co!petence-The licensed architect is competent to cany out wor? related to Building
%ermit as given below and will be entitled to submitF
i. All plans and related information connected with building permit,
ii. /tructural details and calculations for buildings on plots upt1611 sA$ m$ and upto 2storeys,
and
iii. Certificate of supervision for all buildings$ iv.
All layout plans$
%-# &0+)0&&@
%-#$ Euali1ications-The Aualifications for licensing of &ngineer will be the corporate mem-
bership -Civil. of the )nstitution of &ngineers or such Degree or Diploma in Civil or 9unicipal or
/tructural &ngineering which ma?e him eligible for such membership, or which is recognised by
Union %ublic /ervice Commission for the post of an Assistant &ngineer$
% - #$3 Co!petence-The licensed engineer is competent to cany out the wor? related to Building
%ermit as given below and will be entitled to submitF
i. All plans and related information connected with building permit on plots up to
611 sA$ m$ and upto four storeys$
ii. /tructural details and calculations for all buildings, and
iii. Certificate of supervision for all buildings$ iv.
All layout plans$
v. /anitary7water supply wor?s for all type ofbui:dings$
128
%-2 /U%&@*)/(@
%-2$ Euali1ications?- The Aualifications for licensing of /upervisor will be F
i. Three years Architectural Assistanship or )ntermediate in Architecture with two years
e'penenceH
ii. Diploma in Civil &ngineering with two years e'perienceH or
iii. Draftsman in Civil &ngineering from LT$) with five years e' perience under Archi-
tect7&ngineerH
5rom a recognised )nstitution which would enable him for the post of /upervisor
recongnised by the Union %ublic /ervice Commission,
1B A l C~/17~\~+1\~~+,-~~~ '3,'UtRGT).''FF,'Ui +N)+\\ N.'C 'CiFN.NN'CG NG +$$,+1\)ID)\+,
i. All plans and related information connected with Building %ermit on plots upto 311
sA$m$ and upto two storeys$
%-6 +@(U% (@ A+&0CO
0-5+1 >hen an agency or group comprising of Aualified architect7engineer is practising, then
the Aualifications and competence of wor? will be combination of tbe individual Aualification
and competence, given under Bye-law --2 and --3 and the agency shall be licensed by the
Authority$
0- 0lu!'ers?-0lu!'ers shall be licensed by the Authority through an e'amination of the
candidates having the following minimum AualificationsF-
PUAL)5)CAT)(0/F
i. A fair ?nowledge of&nglish7<indilUrdu$
ii. >or?ing ?nowledge of drawings and s?etches$
iii. Certificate of)$T$L for the trade with minimum two years e'perience of e'ecution of
sanitary and plumbing wor?s under any +ovt$ Deptt$7Local bodies or licensed
Architect7&ngineer$
E
129
".
A sound practical ?nowledge of e'perience of sanitary and plumbing wor?s under any
+ov;$ Deptt$7local bodies or licensed Architect for a period of five years$
C(9%&T&0C&F
A licensed plumber shall be competent to do the following Dobs independentlyF
a. /ubmission of sanitary plans upto 611 sA$ mtrs$ si,e and 2 storeyed buildings$
b. &'ecution7supervision of sanitary wor?s upto 611 sA$ mtrs$ plot si,e and 2 storeyed
buildings$
c. &'ecution of sanitary wor?s for all ?ind of buildings under the supervision of all licensed
&ngineer$
%- 8 L)C&0/)0+
%-8$l Techincal 0ersonnel to 'e licensed-The Aualified teclmical personnel or group as given in
Bye-law %$3, %-#, %-2,%-6 and %-4 shall be licensed with the Authority and the licence shall be
valid for one calendar year ending # st December after which it shall be renewed annually$
#1
APPENDI9-:8:
%&0AL ACT)(0 5(@ *)(LAT)(0 (5 %@(*)/)(0/ (5 9A/T&@
%LA07E(0AL %LA0 @&+ULA T) (0 /)B O&-LA >/
-A. 0(0 C(9%(l:0DABL& )T&9/
Any deviations from the ma'imum, minimum prescribed limits regardingF-
$ Coverage
3$ 5$A$@$
#$ /etbac?
2$ (pen spaces
6$ Total height of the building
4$ 0o$offioors
8$ 0o$ of DDs & density
"$ %ar?ing norms
!$ Light and ventilation provisions
1$ Use
11. All other provision of these bye-laws e'cept items given in para 'B' below shall not
be compounded7regularised and shall have to be rectified by altering7demolition at the ris? and cost of
owner$ Besides this any other action as per terms & conditions of lease and provisions of Delhi
Development Act, !68 shall proceed$
-B. C(9%(U0DABL& )T&9/
Deviations in terms of covered area-)f a building or pmi thereof has been constructed
unauthorisedly i$e$ without obtaining the reAuisite building pemit from the authority as reAuired
under clause 6.1 & 6.7.1 of the building bye-laws, the same shall be compounded at the following
rates provided the building or part thereof so constructed otherwise confoffis to the provisions
contained in the Building Bye-Laws and 9aster7Eonal %lan regulations$ 5or this party shall have to
subimit the reAuest for building permit in the prescribed procedure$
@AT&/
a. @s$ 36 per sA$ mt$ of the covered area constructed unauthorisedlyF
The above rate shall apply to the buildings as categorised belowF
@esidential buildings upto 611 sA$ mt$ plot si,e$
All +ovt$, %ublic & /emi-%ublic and utility buildings$
@eligious, )nstitutional & &ducational Buildings$
b. @s$ 117- per sA$ mt$ of the covered area constructed unauthorisedl yF
@esidential buildings above 611 sA$ mt$ plot si,e -+roup <ousing & +uest <ouses. )ndustrial
BuildingsF
131
/torage buildings -under ground or above ground.
<a,ardou s Buildings
c. @s$ 6117-per sA$mt$ of covered area constructed unauthorisedly F
Commercial & Business Buildings -(ffices, <otels, shops etc.
Cinema & Theatre Buildings$
%etrol %umps -filling7/ervice /tations.
. The building not covered specifically under the above categories, shall be compounded
as decided by the authority, considering the merit of each individual case$
3. )tem which are e'empted from the calculations of the coverage and 5A@ e$g$ cupboards,
canopy, basement & me,,anine, loft, watchman cabins etc$ but constructed unauthorisedly
without obtaining prior permission from the authority, but within the permissible limits shall
also be compounded7regularised at the rate prescribed above$
ii Deviations of the building bye-laws other than as specified in -A. -0on-
compoundable .$
Deviations upto the ma'imum e'tent of 1M from the ma'imum7minimum prescribed
limit -as prescribed by the building bye-laws. shall be compounded at the following ratesF-
a. )n case of deviations of areas of various components of the buildings, the rate of penalty
will be S @s$) (:-per M of deeviation$
b. 5 or deviations in tem/ of height the penalty shall be S @s$ 17 -per M of deviation'
for every 1 sA$mt$ or part there of the affected area$
c. Deviations from the prescribed limit of width F length penalty shall be F @s$ 17- per
M of the deviation for every 1 sA$ mt$ or part there of the affected area$
>otes? . 0otwithstanding the provisions above, no penalty shall be levied for the first #M of
deviation but in case deviation limit e'ceed #M penalty shall be levied at the above
rates for the total deviation up to 1M$
3. The penalties at the above rates as given in(i. -a., -b. & -c. shall be charged for each
deviation and for every component of the building separately$
d. )n case of increase in si,e of canopy in front open space from the prescribed limits of
bye-laws, the same shall be charged S @s$ 317- per sA$ mt$
e. &nd walls upto 1$! mt$ in terrace type construction constructed purely as an
architectural feature- @s$l 17 -each$
#3
f. &nclosing of front balcony by :ali wall which is being used as a part of stair-case@s$
3/17-/A$ mt$
g.
i.
ii.
An open urinal having wall upto $8 mt$ height-0o penalty$
>ater storage tan? over open urinal with walls upto $81 mt$ in ht$-0o penalty, if
sanctioned$ lfnot sanctioned, @s$ /(7-each$
h. Under-ground lines covered without getting the proposal inspected and approved @s$ 3117-
lump-sum$
i. All roof proDections beyond permissible limit of bye-laws as specified shall be counted towards
5A@ calculations if otherwise the same do not infringe upon other bye-laws$
D. %linth steps in setbac? portion-@s$ 367-each$
?. &'tra slab in mumty constructed without sanction shall be compounded at the rate given in -B.
-compoundable item. provided it does not infringe upon the provision of any other bye-laws$
. %artition walls provided without sanction at any floor if the same are not infringing upon t he
provision of any other bye-laws @s$ 67- per sA$ mt$ of the surface area of the wall i$e$ -length '
height.$
m. %roDection on public land-0ot permitted$
133
!.
)0/T@UCT)(0/ A0D +U)D&L)0&/ 5(@ BU)LD)0+
%&@9)T A0D C(9%L&T)(0 C&@T)5)CAT&
BU)LD)0+ %&@9)T A 9U/TF
0o person shall erect or re-erect or ma?e alteration or cause the same to be done
without first obtaining a seperate building permit for each such building from the DDA$
1A 0rocedure 1or o'taining 'uilding per!it F
<ow to apply F-
i. &very person who intends to erect or re-erect or ma?e alterations in a building, shall give
notice in writing in the prescribed form and such notice shall be accompanied by the following
F-
ii. Copies of plans and statements-0ormally 2 copies of plans and statements shall be made
available along with the notice in case of building schemes, where the clearance is reAuired
from Delhi 5ire /ervice -/ee bye-law 0o$4$ 3$ 2$ $. the number of copies of the plans and
statements accompanying the notice shall be 4$ )n case of scheme reAuiring clear ance of Delhi
Urban Art Commission, the number of copies shall be " and in addition special drawings and
models, as desired by Delhi Urban Art Commission, shall be made available$ )n case of sites
reAuiring the clearance of Land and Development, (ffice, ! copies of the plan shall be made
available$
Dii. 0roo1 of(Novnenhip-Lease-deed, /ale-deed etc$ duly accompanied by an anne'ed site plan
giving the physical description of the plot7property$ )n such cases where lease-deed has not
been e'ecuted, 0$($C$ ii'om the competent authority shall be submitted$
iv. "peci1ications-T=o copies of the specifications of the proposed construction, in the
prescribed foml$ -%lease see anne'ure' A'. $
$ v. "upervision-A certificate in the prescribed form, signed by the licensed Architect7
&ngineer7/upervisor7+roup and %lumber who is to supervise the construction$ -As per
anne'ure 'B'.
vi. $uilding 0er!it1ee & "tac#ing Charges->o notice as referred in %$ shall be deemed valid
unless and until the owner giving notice has paid the reAuisite building fee to the Authority and
receipt of such payment attached with the 0otice$ The schedule of fee is given belowF
a. Building permit fee for all buildings shall be calculated S@s$ $11 per sA$ mt$ of
covered area$
#2
b. :ees1or Addition,Alteration,;evised 0lans- The fee for internal additions7alterationG$ shall
be 61M of the original building permit fee for the plan in Auestion$ )n case original building
permit fee is not ?nown, then fee for the whole building shall be calculated on arer basis and
61M of this shall be charged as plan submission fee$
)n case part plans for additions7alterations are accepted by the Authority then the
plans submision fee shall be 61M of the fee for areas affected by addition7alterations$ ThiF too
shall be calculated on area basis$ Apart from internal alterations if some additional are$ is
proposed to be covered then the fee for this area shall be wor?ed out on the area basis ant'
shall separately be added to the above fees$
c. ;evalidation o1 plans-The revalidation fee after the e'piry of the validity period 0)
original sanctioned plan shall be S 36M of the original permit fee per yeaL
d. %lans submission fee for the approval oflayout for development7sub-division oflan-'
shall be calculated S @s$ 11 per acre$
e. 5ee for inspection of underground drainage wor? at the time of approval ofform 'C'
shall be @s$ 17-$
f) 5ee for final inspection of drainage wor? etc$ at the time of approval of 'D' fornH
shall be @s$ 67-$
g. 5ee for submission of0(C shall be @s$ 317-$
"tac#ing Charges $$
a. 5or plots falling in areas where services are being maintained by any +ovt$ Agenc.
the stac?ing charges shall be charged as given belowF-
i. S @s$ 7- per sA$ mtL of covered area for plots upto 23 sA$ mtL in area$
ii. S @s$ $6 per sA$ mtL of covered area for plots upto "2 sA$ mtL in area$
iii. S @s$ 37- per sA$ mtL of plots above "2 sA$ mtL and upto 2" sA$ mtL in area$
b. )n case of plots above 2" sA$ mtr$ of area, no stac?ing charges shall be leviablt provided
the party underta?es not to stac? the material on +ovt$ land in the proforma given ir
Appendi''9' But in case of default, the stac?ing charges at the above rates shall be chargeeF
in addition to the penalty as may be decided by the Authority$
c. )n cash of plots where the services are being maintained by the respective Co-op$ /ocieties
and are still not handed over to any +ovt$ Agency no stac?ing charges are leviable and only
the certificate from the /ecy$ of the /ociety shall be submitted that all the damageG etc$ to the
services shall be made good by the /ociety before handing over services to the +ovt$ Agency$
13&
vii. @eAuirements under u$L$C$@$ Act, !84 F
Affidavit and )ndemenity Bond and wherever reeAuired prior clearance from the
Competent Authority under U$L$C$@$Act, !84 is to be obtained$ -As per specimen given in
Anne'ure '1'.$
viii. 6ther docu!ents F-
a. Underta?ing for non-stac?ing of building material on public property7road in case of plot
measuring more than 2" sA$ mtr$ in area to be submitted in the proforma as given in Appendi''9'$
b. In case of any deviation from the terms and conditions stipulated in the lease-deed7
ownership document, necessary clearance from the Competent Authority$
c. 0o (bDection Certificate from the Competent Authority regarding land use as per
9aster7Eonal %lan, if reAuired$
d. Approval from the Chieflnspector of 5actories in case of)ndustrial Buildings$
e. Approval from the Chief Controller of &'plosives, 0agpur and Chief 5ire (fficer,
Delhi in case of ha,ardous buildings$
f) )ndemnity bond in case of proposal for the construction of a basement as given in
Appendi' '0'
2. 0rocedure 1or processing 'uilding per!it application F-
. (n the day, application for grant of building permit is received, Building /ection shall give a
suitable date and time for the site inspection$ )n any case the date will be given within 1 days
from the receipt of application$
3. After the site has been inspected, the case shall be scrutinised within #1 days from the date of
inspection$ )n case there are no obDections and corrections reAuiring compliance from the owner,
the sanction shall be released within 41 days from the date of submission$
5or other cases where corrections or compliance of other obDections is necessary, the same
in detail will be intimated to the party within 26 days from the date of submission$ /uch
correction7compliance should be completed within #1 days after compliance of which the building
pemlit shall be released within 6 days from the date of such compliance$
)n case of non-compliance by the party within the stipulated period, the building permit
shall be refused$ )n case of such applications for building permit which are not in conformity with
the bye-laws79aster %lan7Eoning @egulations or deficient in papers7documents and reAuired
information, the application shall be liable to be refused$
#4
3A 5alidity period o1 $uilding 0er!it $$
/uch building permit shall remain valid from the date of sanction as mentioned belowF-
a.
5 or @esidential, )ndustrial and Commercial -upto 2-storeyed building$.
3 years
b.
5 .# larger Compe'e'$', and multi-'$',toreyed buildingsH and institutional buildings
# years
>ote? 0o building activity can be carried out after the e'piry of validity of such building permit$
4A 0rocedure 1or o'taining ;evalidation o1 $uilding 0er!it.
The building permit can be revalidated for a period of one year at a time from the date of
e'piry of the validity of the original permit on payment of the reAuired revaildation fees$
Application for such revaildation shall be submitted on plain paper along with the following
documents F-
a. (riginal sanctioned plan$
KJ Re./a1ida+i*0n fees 11+12i3h shall 4e 2&4 o1 +he orignaJ pennit 1ee per year.
c. 0$($C$ from competent authority as per terms and conditions oflease deed, ifreAuired$
>6T2? 0o application for revalidation shall be entertained without the revalidation fees$
5A 0rocedure 1or processing ;evalidation o1 $uilding 0er!it $$
The application for revalidation shall be processed and revalidation conveyed within 6
days from the date of submission if the case is in order$
In case of any obDection, either the refusal of such revalidation or the obDection for
compliance shall be intimated to the party within 6 days from the date of submission of the
application$
A ;evocation o1 $uilding per!it $$
The D$D$A$may revo?e any building permit issued under the provisions of the byelaws if
there has been any false statement or any mis-representation of material facts in the application on
which the building permit was based$
(@
)f the building permit, so issued, is found to be in violation of building bye-laws79aster
%lan7Eonal %lan regulations$
#8
OR
)f during construction it is found that the owner has violated any of the provisions of the
building bye-laws or sanctioned plan$
8A 0rocedure during construction =or#?
i. The owner7applicant who has been granted such building permit shall intimate the Authority in
writing before 8 days of starting of construction wor? at site$ <e shall obtain an ac?nowledgement
from the Authority of this notice$ After receiving such notice the Authority may depute an (fficer
for inspection of the site$
ii. The owner7applicant who has been granted such building permit shall serve a notice in form +C+
alongwith a fee of@s$ 102- as per building bye-laws clause 7.2.1 before covering the underground
drainage7 sanitary and other pipe lines$
>ithin 1 days from receipt of such notice the site7 premises shall be inspected by an
officer deputed by the Authority$ Approval or reDection of the application of +C+ form shall be
conveyed to the applicant by the Authority within 1& days from the date of receipt of such notice$
)n the event the owner7applicant fails to abide by the above procedure i$e$ covers the
underground drainage without obtaining the clearance of +9+ fom shall be liable to pay a lump-
sum penalty of @s$ 3117- provided the drainage wor? is otherwise in conformity with the bye-laws
specified for the purpose$
iii. The oN*er7applicant who has been granted building permit shall serve a notice in form 'D' as
per building Bye-law 0o$ 8$3$3 along with a fee of @s$ 67- after the final completion of the
drainage7sanitary7water supply wor?s$
>ithin 10 days from the receipt of such notice the site7premises shall be inspected by an
(fficer deputed by the Authority$ Approval or reDection of the application of' D+ form shall be
conveyed to the applicant within 6 days from the date of receipt of such notice$
". -i. 0rocedure 1or 6'taining Co!pletion Certi1icate?
0o person shall occupy or allow any other person to occupy any building or part of a
building for any purpose until such building or part has been granted the (ccupancy Certificate$
#"
1.
0otice of Completion-&very owner shall have to submit a notice of completion of the building to the
Authority regarding completion of the wor? described in the building pemit$ The notice of completion shall
be submitted by the owner through the licensed Architect7&ngineei or group, as the case may be, who has
supervised the construction, the perfoma given iL Appendi' '5' and '+' accompanied by three copies of
completion plan and the followinf documents and alongwith a fee of@s$ 317-F-
). Copy of lease-deed$
3. Copy of sewer connection permission$
#. Clearnce from Chief 5ire (fficer, Delhi
2. Clearance from Chief Controller of &'plosive, 0agpur, as reAuired$
6. Clearance from D&/U regarding provision ofTransport7/ub-stationlancillary power
supply system etc$ as reAuired$
4. /tructural /tability Certificate duly signed by the licensed Architectl&ngineer$
8. Certificate from the lift 9anufacturer, as reAuired$
". Certificate from Air-conditioning &ngineer, 9fg$ as reAuired$
ii. 0rocedure 1or 0rocessinng o1 issue o1 6ccupancy Certi1icate.
The authority on receipt of the notice of completion, shall inspect the wor? and sanction or refuse an
occupancy certificate, in the proforma given in Appendi' '<' within 41 days from the date of receipt of
completion certificate, after which period it shall be deemed to have been approved by the Authority for
occupation$ >here the occupancy certificate iG refused the various reasons shall be Auoted for reDecting at the
first instance itself$
!. .Discellaneous?
0o person shall be entertained for persuing their cases other than the owner, duly appointed
Architect7&ngineer, /upervisor or an authorised person having letter in writing from the owner$ /o, the
owners7applicants are advised to refrain from deputing unauthorised ersons to unnecessarily remain on
visiting the D$D$A$ office which serves little constructive urpose$
#!