S.

DISCRIPTION OF ITEM

NOS

QTY.

OFFTAKES
ChainageDP No
22.06
60R
22.59
61R
22.758
62L
23.652
64L
24.135
65R
24.264
66L
24.714
67R
26.413
71R
27.846
75L
28.301
77R
21.878
57L
28.212

21.78
20.928
19.794
19.795
18.92
17.868
17.216
14.697
14.498

Dia
800mm
300mm
350mm
500mm
300mm
350mm
600mm
300mm
350mm
350mm
300mm

76L
56L

450MM
450MM

53L
49L
48R
47R
42L
41R
33R
32L

300MM
450MM
700MM
300MM
600MM
400MM
350MM
300MM

No of
Length pipes
7.55
3
7.493
3
4.1
2
4.05
2
7.55
3
3.93
2
7.55
3
7.5
3
4.983
2
13.8
6
4.125
2
8.248
7.8
3.625
12.165
12.126
10.441
9.769
10.353
7.947
5.425

4
4
2
5
5
5
4
5
4
3

Class
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3
NP3

300MM
800MM
350MM
500MM
600MM
450MM
400MM
700MM

21
3
16
2
7
13
5
5

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

OFFTAKE SLUICE FOR DP-7L DISTRIBUTORY AT CH.23.387(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

2.55
2.60
2.60
1.65

1.25
0.80
1.65
2.6+2.6/2

0.35
0.20
0.35
0.35

1.12
0.42
1.50
1.50
4.53

4.53

2.50
0.90

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.40

1 x 2
1 x 1
1 x 1

1.80
1.35
0.60

Deduct pipe (-) 1 x 1

0.60

Total Vcc M15 qty


Wearing coat in CC M 20
1 x 1

1.35

0.9+0.5/2
TT(0.4)2/4

2.19
0.11 (-)
2.07
((2.6+(1.3+2.6)/2)/2)
2.03
6.22
8.29
TT(0.4)2/4
0.18 (-)
8.12
0.65+0.5/2
1.225+0/2 1.27
0.3+1.2/2
0.15
0.15
0.58
0.58
0.20
9.74
TT(0.4)2/4
0.08 (-)
9.66
0.3+1.2/2

1.25

0.08

0.08

9.66
14.20
0.08

OFFTAKE SLUICE FOR DP-6L DISTRIBUTORY AT CH.23.310(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

2.55
2.60
2.60
1.65

1.25
0.80
1.65
2.6+2.6/2

0.35
0.20
0.35
0.35

1.12
0.42
1.50
1.50
4.53

4.53

2.50
0.90

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.40

1 x 2
1 x 1
1 x 1

1.80
1.35
0.60

Deduct pipe (-) 1 x 1

0.60

Total Vcc M15 qty


Wearing coat in CC M 20
1 x 1

1.35

0.9+0.5/2
TT(0.4)2/4

2.19
0.11 (-)
2.07
((2.6+(1.3+2.6)/2)/2)
2.03
6.22
8.29
TT(0.4)2/4
0.18 (-)
8.12
0.65+0.5/2
1.225+0/2 1.27
0.3+1.2/2
0.15
0.15
0.58
0.58
0.20
9.74
TT(0.4)2/4
0.08 (-)
9.66
0.3+1.2/2

1.25

0.08

0.08

9.66
14.20
0.08

OFFTAKE SLUICE FOR DP-5R DISTRIBUTORY (LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

2.55
6.00
2.80
1.85

1.20
0.60
2.10
2.7+2.7/2

0.30
0.15
0.30
0.30

0.92
0.54
1.76
1.50
4.72

4.72

2.25
1.15

1 x 1 1.9+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.50
0.60

1.73

0.9+0.5/2
TT(0.38)2/4

2.17
0.13 (-)
2.04
((2.8+(1.30+2.8)/2)/2)
2.03
6.63
8.66
TT(0.38)2/4
0.11 (-)
8.55
0.6+0.5/2
1.375+0/2 1.36
0.3+1.3/2
0.15
0.18
0.58
0.58
0.20
10.29
0.45+1.6/2

1.38

0.08

0.13

11.04
15.76
0.13

OFFTAKE SLUICE FOR DP-4R DISTRIBUTORY AT CH.20.928 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

2.55
6.00
2.80
1.85

1.20
0.60
2.10
2.7+2.7/2

0.30
0.15
0.30
0.30

0.92
0.54
1.76
1.50
4.72

4.72

2.25
1.15

1 x 1 1.9+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.50
0.60

1.73

0.9+0.5/2
TT(0.38)2/4

2.17
0.13 (-)
2.04
((2.8+(1.30+2.8)/2)/2)
2.03
6.63
8.66
TT(0.38)2/4
0.11 (-)
8.55
0.6+0.5/2
1.375+0/2 1.36
0.3+1.3/2
0.15
0.18
0.58
0.58
0.20
10.29
0.45+1.6/2

1.38

0.08

0.13

11.04
15.76
0.13

OFFTAKE SLUICE FOR DP-8R DISTRIBUTORY AT CH.23.652 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

2.55
6.00
2.60
1.65

1.20
0.60
1.65
2.7+2.7/2

0.30
0.15
0.30
0.30

0.92
0.54
1.29
1.34
4.08

4.08

2.25
1.15

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.50
0.60

1.73

1.15+0.5/2
TT(0.38)2/4

3.06
0.13 (-)
2.93
((2.8+(1.30+2.8)/2)/2)
2.03
6.63
9.56
TT(0.38)2/4
0.11 (-)
9.45
0.6+0.5/2
1.225+0/2 1.21
0.3+1.3/2
0.15
0.18
0.58
0.58
0.20
11.04
0.45+1.6/2

1.65

0.08

0.13

11.04
15.12
0.13

OFFTAKE SLUICE FOR D-57L DISTRIBUTORY AT CH.21.878(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

3.45
2.55
2.80
1.80

1.45
0.80
1.85
2.8+2.8/2

0.30
0.15
0.30
0.30

1.50
0.31
1.55
1.51
4.87

4.87

3.15
0.90

1.15+0.5/2
TT(0.4)2/4

1.65

4.29
0.11 (-)
4.17
For U/S head wall
1 x 1 1.7+1.1/2 ((2.8+(1.3+2.8)/2)/2)
2.18
7.40
11.58
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
11.40
U/S Wings
1 x 2
2.07
0.7+0.5/2
1.38+0/2 1.71
U/S Vent
1 x 1
1.73
0.3+1.45/2
0.15
0.23
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
13.55
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
13.47
Total Vcc M15 qty
Wearing coat in CC M 20
1 x 1
1.75
0.3+1.45/2
0.08
0.11

13.47
18.35
0.11

OFFTAKE SLUICE FOR D-54L DISTRIBUTORY AT CH.21.262(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

3.60
2.55
2.80
1.80

1.20
0.58
1.85
2.8+2.8/2

0.30
0.15
0.30
0.30

1.30
0.22
1.55
1.51
4.58

4.58

3.30
0.90

1.15+0.5/2
TT(0.4)2/4

1.65

4.49
0.11 (-)
4.38
For U/S head wall
1 x 1 1.7+1.1/2 ((2.8+(1.3+2.8)/2)/2)
2.18
7.40
11.78
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
11.60
U/S Wings
1 x 2
2.07
0.7+0.5/2
1.38+0/2 1.71
U/S Vent
1 x 1
1.73
0.3+1.45/2
0.15
0.23
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
13.75
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
13.68
Total Vcc M15 qty
Wearing coat in CC M 20
1 x 1
1.75
0.3+1.45/2
0.08
0.11

13.68
18.26
0.11

OFFTAKE SLUICE FOR D-53L DISTRIBUTORY AT CH.20.928(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

3.45
2.55
2.80
1.85

1.45
0.80
1.85
2.8+2.8/2

0.30
0.15
0.30
0.30

1.50
0.31
1.55
1.55
4.91

4.91

3.15
0.90

1.15+0.5/2
TT(0.4)2/4

1.65

4.29
0.11 (-)
4.17
For U/S head wall
1 x 1 1.7+1.1/2 ((2.8+(1.3+2.8)/2)/2)
2.18
7.40
11.58
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
11.40
U/S Wings
1 x 2
2.07
0.7+0.5/2
1.38+0/2 1.71
U/S Vent
1 x 1
1.73
0.3+1.45/2
0.15
0.23
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
13.55
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
13.47
Total Vcc M15 qty
Wearing coat in CC M 20
1 x 1
1.75
0.3+1.45/2
0.08
0.11

13.47
18.38
0.11

OFFTAKE SLUICE FOR D-33R DISTRIBUTORY AT CH.14.697 KM (0.35)


SL.NO

DISCRIPTION OF ITEM
E.W.E.
For D/S head wall
For Barrel portion
For U/S head wall

1
1
1
1

x
x
x
x

1
1
1
1

3.90
8.60
2.85
1.80

1.45
0.65
1.85
2.05+2.85/2

2.3
2.3
2.3
2.3

1
1
1
1

x
x
x
x

1
1
1
1

3.90
8.60
2.85
1.80

1.45
0.65
1.85
2.05+2.85/2

0.30
0.30
0.30
0.30

Sub structure in CC M 15
For D/S head wall
Deduct pipe (-)

1
1

x
x

1
1

3.60
1.15

1.15+0.5/2
TT(0.45)2/4

1.43

For U/S head wall

1.7+1.1/2 ((2.55+(1.35+2.55)/2)/2)

2.23

1.60

1
1
1

x
x
x

2
1
3

1.90
1.80
0.60

0.60

1.80

Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

Deduct pipe (-)


U/S Wings
U/S Vent
Pipe bedding at joints
Deduct pipe (-)
3

NOS

Wearing coat in CC M 20

TT(0.45)2/4
0.7+0.5/2
0.35+1.55/2
0.70

1.43
0.15
0.70

TT(0.45)2/4
0.35+1.55/2

0.08

.697 KM (0.35)
QTY.

Total Qty.

13.01
12.86
12.13
10.14
48.13

48

1.70
1.68
1.58
1.32
6.28

6.28

12.31
0.18
12.13
10.05
22.17
0.25
21.92
3.25
0.26
0.88
26.31
0.29
26.02
0.13

(-)

(-)

(-)
26.02
0.13
32.43

OFFTAKE SLUICE FOR D-56R DISTRIBUTORY AT CH.21.780 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

4.40
7.10
2.95
1.85

1.45
1.10
1.85
2.9+2.9/2

0.30
0.15
0.30
0.30

1.91
1.17
1.64
1.61
6.33

6.33

4.10
1.15

1 x 1 1.7+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.30

1 x 2
1 x 1
1 x 1

2.07
1.73
0.80

Deduct pipe (-) 1 x 1

0.60

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.73

1.15+0.5/2
TT(0.55)2/4
((2.9+(1.45+2.9)/2)/2)
TT(0.55)2/4
0.7+0.5/2
0.45+1.6/2
0.80
TT(0.55)2/4

0.45+1.6/2

1.78

6.02
0.27 (-)
5.75
2.18
7.73
13.47
0.31 (-)
13.17
1.38+0/2 1.71
0.15
0.27
0.80
0.51
15.66
0.14 (-)
15.51
0.08

0.13

15.51
21.85
0.13

OFFTAKE SLUICE FOR D-64L DISTRIBUTORY AT CH.23.652(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

4.55
2.60
2.80
1.65

1.55
0.70
1.75
2.8+2.8/2

0.30
0.15
0.30
0.30

2.12
0.27
1.47
1.39
5.24

5.24

4.25
0.90

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.40

1 x 2
1 x 1
1 x 1

1.80
1.50
0.60

Deduct pipe (-) 1 x 1

0.60

Total Vcc M15 qty


Wearing coat in CC M 20 1 x 1

1.75

1.25+0.5/2
TT(0.65)2/4

6.51
0.30 (-)
6.21
((2.8+(1.5+2.8)/2)/2)
2.03
6.89
13.10
TT(0.65)2/4
0.46 (-)
12.64
0.6+0.5/2
1.225+0/2 1.21
0.5+1.5/2
0.15
0.23
0.85
0.85
0.43
14.51
TT(0.65)2/4
0.20 (-)
14.31
0.3+1.45/2

1.75

0.08

0.11

14.31
19.55
0.11

OFFTAKE SLUICE FOR D-62L DISTRIBUTORY AT CH.22.758(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

3.60
2.60
2.75
1.80

1.50
1.00
1.80
2.8+2.8/2

0.30
0.15
0.30
0.30

1.62
0.39
1.49
1.51
5.01

5.01

3.30
0.90

1.2+0.5/2
TT(0.4)2/4

1.65

4.63
0.11 (-)
4.52
For U/S head wall
1 x 1 1.7+1.1/2 ((2.8+(1.35+2.8)/2)/2)
2.13
7.25
11.77
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
11.59
U/S Wings
1 x 2
2.00
0.65+0.5/2
1.325+0/2 1.52
U/S Vent
1 x 1
1.65
0.3+1.45/2
0.15
0.22
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
13.54
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
13.46
Total Vcc M15 qty
Wearing coat in CC M 20
1 x 1
1.75
0.3+1.45/2
0.08
0.11

13.46
18.47
0.11

OFFTAKE SLUICE FOR D-66L DISTRIBUTORY AT CH.24.264(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

3.60
2.60
2.75
1.80

1.45
1.00
1.80
2.8+2.8/2

0.30
0.15
0.30
0.30

1.57
0.39
1.49
1.51
4.95

4.95

3.30
0.90

1.2+0.5/2
TT(0.4)2/4

1.65

4.63
0.11 (-)
4.52
For U/S head wall
1 x 1 1.7+1.1/2 ((2.8+(1.35+2.8)/2)/2)
2.13
7.25
11.77
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
11.59
U/S Wings
1 x 2
2.00
0.65+0.5/2
1.325+0/2 1.52
U/S Vent
1 x 1
1.65
0.3+1.45/2
0.15
0.22
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
13.53
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
13.46
Total Vcc M15 qty
Wearing coat in CC M 20
1 x 1
1.75
0.3+1.45/2
0.08
0.11

13.46
18.41
0.11

OFFTAKE SLUICE FOR D-61R DISTRIBUTORY AT CH.22.590 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

3.45
6.00
2.70
1.80

1.45
0.60
1.85
2.7+2.7/2

0.30
0.15
0.30
0.30

1.50
0.54
1.50
1.46
5.00

5.00

3.15
1.15

1 x 1 1.7+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.30
2.00
1.65
0.60

1.73

1.15+0.5/2
TT(0.38)2/4

4.29
0.13 (-)
4.16
((2.7+(1.30+2.7)/2)/2)
2.13
6.99
11.15
TT(0.38)2/4
0.15 (-)
11.00
0.65+0.5/2
1.325+0/2 1.52
0.3+1.4/2
0.15
0.21
0.58
0.58
0.20
12.94
0.45+1.6/2

1.65

0.08

0.13

12.94
17.94
0.13

OFFTAKE SLUICE FOR D-65R DISTRIBUTORY AT CH.24.135 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

QTY.

1
1
1
1

3.45
6.00
2.60
1.65

1.45
0.60
1.75
2.7+2.7/2

0.30
0.15
0.30
0.30

1.50
0.54
1.37
1.34
4.74

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

3.15
1.15

1.15+0.5/2
TT(0.38)2/4

1.65

((2.8+(1.30+2.8)/2)/2)

2.03

4.29
0.13
4.16
6.63
10.79
0.11
10.67
1.21
0.18
0.20
12.94

For U/S head wall

NOS
1
1
1
1

x
x
x
x

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.00

TT(0.38)2/4

1 x 2
1 x 1
1 x 1

1.80
1.50
0.60

0.6+0.5/2
0.3+1.3/2
0.58

1.225+0/2
0.15
0.58

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.73

0.45+1.6/2

0.08

0.13

(-)

(-)

(LEFT CANAL)
Total Qty.

4.74

12.94
17.68
0.13

OFFTAKE SLUICE FOR D-60R DISTRIBUTORY AT CH.22.060 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

5.01
6.00
3.40
1.80

1.65
1.10
1.90
3.2+3.2/2

0.30
0.20
0.30
0.30

2.48
1.32
1.94
1.73
7.47

7.47

4.71
1.15

1 x 1 1.75+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.30

1 x 2
1 x 1
1 x 1

2.00
1.65
0.80

Deduct pipe (-) 1 x 1

0.80

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.73

1.35+0.5/2
TT(0.95)2/4

8.28
0.82 (-)
7.46
((3.2+(1.80+3.2)/2)/2)
2.33
9.44
16.90
TT(0.95)2/4
0.92 (-)
15.98
0.65+0.5/2
1.325+0/2 1.52
0.8+1.9/2
0.15
0.33
1.19
1.19
1.13
18.97
TT(0.95)2/4
0.57 (-)
18.41
0.45+1.6/2

1.90

0.08

0.13

18.41
25.87
0.13

OFFTAKE SLUICE FOR D-49L DISTRIBUTORY AT CH.19.794 KM (0.45)


SL.NO
DISCRIPTION OF ITEM
1
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

1
1
1
1

x
x
x
x

1
1
1
1

4.30
11.10
3.75
1.73

1.50
0.75
2.35
2.15+2.9/2

0.30
0.30
0.30
0.30

Sub structure in CC M 15
For D/S head wall
Deduct pipe (-)

1
1

x
x

1
1

4.10
1.15

1.2+0.5/2
TT(0.55)2/4

1.38

For U/S head wall

2.1+1.1/2 ((3.45+(1.45+3.45)/2)/2)

2.11

1.60

1
1
1

x
x
x

2
1
4

1.83
1.73
0.60

0.60

1.73

Deduct pipe (-)


U/S Wings
U/S Vent
Pipe bedding at joints
Deduct pipe (-)
3

NOS

Wearing coat in CC M 20

TT(0.55)2/4
0.7+0.5/2
0.45+1.6/2
0.80

1.38
0.15
0.80

TT(0.55)2/4
0.45+1.6/2

0.08

.794 KM (0.45)
QTY.

Total Qty.

1.94
2.50
2.64
1.31
8.38

8.38

4.79
0.27
4.52
9.96
14.48
0.38
14.10
3.02
0.27
1.54
18.92
0.57
18.35
0.13

(-)

(-)

(-)
15.33
0.13
23.84

OFFTAKE SLUICE FOR D-47 R DISTRIBUTORY AT CH.18.920 KM (0.30)


SL.NO
DISCRIPTION OF ITEM
1
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

QTY.

1
1
1
1

x
x
x
x

1
1
1
1

3.45
11.10
2.40
1.73

1.45
0.60
3.60
2.0+2.80/2

0.30
0.30
0.30
0.30

1.50
2.00
2.59
1.24
7.33

Sub structure in CC M 15
For D/S head wall
Deduct pipe (-)

1
1

x
x

1
1

3.15
1.15

1.15+0.5/2
TT(0.4)2/4

1.65

For U/S head wall

1.60

1
1
1

x
x
x

2
1
4

1.90
1.73
0.60

0.60

1.73

6.89
0.14
6.74
9.45
16.19
0.20
15.99
3.14
0.23
0.81
20.16
0.30
19.86
0.11

Deduct pipe (-)


U/S Wings
U/S Vent
Pipe bedding at joints
Deduct pipe (-)
3

NOS

Wearing coat in CC M 20

2.1+1.1/2 ((3.3+(1.3+3.3)/2)/2)

2.11

TT(0.4)2/4
0.7+0.5/2
0.3+1.45/2
0.58

1.38
0.15
0.58

TT(0.4)2/4
0.3+1.45/2

0.08

M (0.30)
Total Qty.

7.33

(-)

(-)

(-)
25.45
0.11
32.89

OFFTAKE SLUICE FOR D-48R DISTRIBUTORY AT CH.19.795 KM (0.70)


SL.NO
DISCRIPTION OF ITEM
1
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

1
1
1
1

x
x
x
x

1
1
1
1

5.00
11.10
2.40
1.73

1.65
1.00
4.00
3.15+2.65/2

0.30
0.30
0.30
0.30

Sub structure in CC M 15
For D/S head wall
Deduct pipe (-)

1
1

x
x

1
1

4.70
1.25

1.35+0.5/2
TT(0.8)2/4

1.90

For U/S head wall

2.1+1.1/2

1.60

1
1
1

x
x
x

2
1
4

1.85
1.73
0.60

0.60

1.73

Deduct pipe (-)


U/S Wings
U/S Vent
Pipe bedding at joints
Deduct pipe (-)
3

NOS

Wearing coat in CC M 20

((3.7+(1.7+3.7)/2)/2)

2.11

TT(0.8)2/4
0.7+0.5/2
0.7+1.85/2
1.07

1.38
0.15
1.07

TT(0.8)2/4
0.7+1.85/2

0.08

9.795 KM (0.70)
QTY.

Total Qty.

2.48
3.33
2.88
1.50
10.19

10.19

8.26
0.63
7.63
10.80
18.43
0.80
17.63
3.05
0.33
2.75
23.76
1.21
22.55
0.16

(-)

(-)

(-)
21.94
0.16
32.3

OFFTAKE SLUICE FOR D-41R DISTRIBUTORY AT CH.17.216 KM (0.40)


SL.NO
DISCRIPTION OF ITEM
1
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

1
1
1
1

x
x
x
x

1
1
1
1

4.25
11.10
2.40
1.80

1.55
0.70
3.70
2.1+2.9/2

0.30
0.30
0.30
0.30

Sub structure in CC M 15
For D/S head wall
Deduct pipe (-)

1
1

x
x

1
1

3.95
0.70

1.25+0.5/2
TT(0.55)2/4

1.67

For U/S head wall

2.1+1.1/2

1.60

1
1
1

x
x
x

2
1
4

1.90
1.80
0.60

0.60

1.80

Deduct pipe (-)


U/S Wings
U/S Vent
Pipe bedding at joints
Deduct pipe (-)
3

NOS

Wearing coat in CC M 20

((3.4+(1.4+3.4)/2)/2)

2.16

TT(0.55)2/4
0.7+0.5/2
0.4+1.6/2
0.80

1.43
0.15
0.80

TT(0.55)2/4
0.4+1.6/2

0.08

.216 KM (0.40)
QTY.

Total Qty.

1.98
2.33
2.66
1.35
8.32

8.32

5.77
0.17
5.61
10.02
15.63
0.38
15.25
3.25
0.27
1.54
20.30
0.57
19.73
0.14

(-)

(-)

(-)
19.73
0.14
28.19

OFFTAKE SLUICE D-42L AT CH.17.868 KM in LEFT CANAL


SL.NO
DISCRIPTION OF ITEM
1
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

QTY.

Total Qty.

4.90
6.85
2.10
1.80

1.55
0.90
3.90
3.1+2.3/2

0.30
0.15
0.30
0.30

2.28
0.92
2.46
1.46
7.12

7.12

Sub structure in CC M 15
For D/S head wall
Deduct pipe (-)

1
1

x
x

1
1

4.60
1.25

For U/S head wall

2.1+1.1/2

1.80

1
1
1

x
x
x

2
1
3

1.90
1.80
0.60

0.60

Deduct pipe (-)


U/S Wings
U/S Vent
Pipe bedding at joints
Deduct pipe (-)
Total Vcc M15 Qty

1.25+0.5/2
TT(0.7)2/4
((3.6+(1.6+3.6)/2)/2)

1.90

2.16

TT(0.7)2/4
0.7+0.5/2
0.6+1.8/2
0.60
TT(0.7)2/4

1.43
0.15
0.60

7.65
0.48
7.17
10.71
17.88
0.69
17.19
3.25
0.32
0.65
21.41
0.69
20.71

(-)

(-)

(-)
20.71
27.83

OFFTAKE SLUICE FOR D-67R DISTRIBUTORY AT CH.24.714 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

4.60
6.00
2.80
1.50

1.55
1.00
1.60
2.80

0.30
0.20
0.30
0.30

2.14
1.20
1.34
1.26
5.94

5.94

4.30
0.80

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.50
0.60

1.73

1.25+0.5/2
TT(0.7)2/4
((2.6+(1.60+2.6)/2)/2)
TT(0.7)2/4
0.6+0.5/2
0.6+1.6/2
1.00

0.45+1.6/2

1.23

4.61
0.31 (-)
4.30
2.03
6.42
10.73
0.39 (-)
10.34
1.225+0/2 1.21
0.15
0.25
1.00
0.60
12.40
0.08

0.13

12.40
18.34
0.13

OFFTAKE SLUICE FOR D-71R DISTRIBUTORY AT CH.26.413 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

3.45
6.00
2.50
1.50

1.45
0.60
1.45
2.5+2.5/2

0.30
0.20
0.30
0.30

1.50
0.72
1.09
1.13
4.43

4.43

3.15
0.80

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.50
0.60

1.73

1.15+0.5/2
TT(0.38)2/4

4.29
0.09 (-)
4.20
((2.5+(1.30+2.5)/2)/2)
1.93
5.72
9.91
TT(0.38)2/4
0.11 (-)
9.80
0.6+0.5/2
1.125+0/2 1.11
0.3+1.3/2
0.15
0.18
0.58
0.58
0.20
11.30
0.45+1.6/2

1.65

0.08

0.13

11.30
15.73
0.13

OFFTAKE SLUICE FOR D-72L DISTRIBUTORY AT CH.26.880(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

3.45
2.60
2.50
1.50

1.25
1.00
1.60
2.6+2.6/2

0.30
0.15
0.30
0.30

1.29
0.39
1.20
1.17
4.05

4.05

3.15
0.90

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.40

1 x 2
1 x 1
1 x 1

1.80
1.35
0.60

Deduct pipe (-) 1 x 1

0.60

Total Vcc M15 qty


Wearing coat in CC M 20
1 x 1

1.35

1.0+0.5/2
TT(0.4)2/4

3.19
0.11 (-)
3.08
((2.6+(1.3+2.6)/2)/2)
1.93
5.93
9.00
TT(0.4)2/4
0.18 (-)
8.83
0.65+0.5/2
1.125+0/2 1.16
0.3+1.2/2
0.15
0.15
0.58
0.58
0.20
10.35
TT(0.4)2/4
0.08 (-)
10.27
0.3+1.2/2

1.35

0.08

0.08

10.27
14.32
0.08

OFFTAKE SLUICE FOR D-73R DISTRIBUTORY AT CH.26.969 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

5.16
6.00
3.90
1.50

1.50
0.60
2.00
3.2+3.2/2

0.30
0.20
0.30
0.30

2.32
0.72
2.34
1.44
6.82

6.82

4.86
0.80

1 x 1 1.85+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.35
0.60

1.73

1.2+0.5/2
TT(1.1)2/4
((3.6+(1.90+3.6)/2)/2)
TT(1.1)2/4
0.6+0.5/2
0.9+1.8/2
1.43

0.45+1.6/2

1.72

7.11
0.76 (-)
6.34
2.70
12.62
18.97
0.95 (-)
18.02
1.125+0/2 1.11
0.15
0.27
1.43
1.23
20.63
0.08

0.13

20.63
27.45
0.13

OFFTAKE SLUICE FOR DP-9L DISTRIBUTORY AT CH.25.782(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

2.55
2.60
2.60
1.65

1.25
0.60
1.65
2.6+2.6/2

0.30
0.20
0.30
0.30

0.96
0.31
1.29
1.29
3.84

3.84

2.25
0.90

1 x 1 1.6+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1.40

1 x 2
1 x 1
1 x 1

1.80
1.35
0.60

Deduct pipe (-) 1 x 1

0.60

Total Vcc M15 qty


Wearing coat in CC M 20
1 x 1

1.35

0.9+0.5/2
TT(0.4)2/4

1.97
0.11 (-)
1.86
((2.6+(1.3+2.6)/2)/2)
2.03
6.22
8.07
TT(0.4)2/4
0.18 (-)
7.90
0.65+0.5/2
1.225+0/2 1.27
0.3+1.2/2
0.15
0.15
0.58
0.58
0.20
9.52
TT(0.4)2/4
0.08 (-)
9.45
0.3+1.2/2

1.25

0.08

0.08

9.45
13.29
0.08

OFFTAKE SLUICE FOR DP-11L DISTRIBUTORY AT CH.27.385(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

2.55
2.60
2.60
1.65

1.25
0.60
1.65
2.6+2.6/2

0.30
0.20
0.30
0.30

0.96
0.31
1.29
1.29
3.84

3.84

2.25
0.90

0.9+0.5/2
TT(0.4)2/4

1.25

1.97
0.11 (-)
1.86
For U/S head wall
1 x 1 1.6+1.1/2 ((2.6+(1.3+2.6)/2)/2)
2.03
6.22
8.07
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
7.90
U/S Wings
1 x 2
1.80
0.65+0.5/2
1.225+0/2 1.27
U/S Vent
1 x 1
1.35
0.3+1.2/2
0.15
0.15
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
9.52
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
9.45
Total Vcc M15 qty
Wearing coat in CC M 20 1 x 1
1.35
0.3+1.2/2
0.08
0.08

9.45
13.29
0.08

OFFTAKE SLUICE FOR DP-10L DISTRIBUTORY AT CH.26.364(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

2.55
2.60
2.60
1.65

1.25
0.60
1.65
2.6+2.6/2

0.30
0.20
0.30
0.30

0.96
0.31
1.29
1.29
3.84

3.84

2.25
0.90

0.9+0.5/2
TT(0.4)2/4

1.25

1.97
0.11 (-)
1.86
For U/S head wall
1 x 1 1.6+1.1/2 ((2.6+(1.3+2.6)/2)/2)
2.03
6.22
8.07
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
7.90
U/S Wings
1 x 2
1.80
0.65+0.5/2
1.225+0/2 1.27
U/S Vent
1 x 1
1.35
0.3+1.2/2
0.15
0.15
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
9.52
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
9.45
Total Vcc M15 qty
Wearing coat in CC M 20 1 x 1
1.35
0.3+1.2/2
0.08
0.08

9.45
13.29
0.08

OFFTAKE SLUICE FOR D-75L DISTRIBUTORY AT CH.27.846(LEFT CANAL)


S.N

DISCRIPTION OF ITEM
Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

4.00
2.60
3.15
1.80

1.45
1.00
2.00
3.15

0.30
0.15
0.30
0.30

1.74
0.39
1.89
1.51
5.53

5.53

3.60
0.90

1.2+0.5/2
TT(0.4)2/4

1.65

5.05
0.11 (-)
4.94
For U/S head wall
1 x 1 1.9+1.1/2 ((2.95+(1.35+2.95)/2)/2)
1.86
7.11
12.05
Deduct pipe (-) 1 x 1
1.40
TT(0.4)2/4
0.18 (-)
11.87
U/S Wings
1 x 2
2.00
0.65+0.5/2
1.125+0/2 1.29
U/S Vent
1 x 1
1.35
0.3+1.25/2
0.15
0.16
Pipe bedding at joints
1 x 1
0.60
0.58
0.58
0.20
13.53
Deduct pipe (-) 1 x 1
0.60
TT(0.4)2/4
0.08 (-)
13.45
Total Vcc M15 qty
Wearing coat in CC M 20
1 x 1
1.75
0.3+1.45/2
0.08
0.11

13.45
18.98
0.11

OFFTAKE SLUICE FOR D-76L DISTRIBUTORY AT CH.28.212 KM (0.45)


SN DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

2 Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1

QTY.

Total Qty.

4.00
2.60
2.05
1.35

1.55
0.75
3.35
1.85+2.65/2

0.30
0.20
0.30
0.30

1.86
0.39
2.06
0.91
5.22

5.22

3.70
1.25

1.25+0.5/2
TT(0.55)2/4

1.75 5.67
0.30 (-)
5.37
For U/S head wall
1 x 1 1.9+1.1/2 ((3.05+(1.45+3.05)/2)/2) 1.86 7.39
12.76
Deduct pipe (-) 1 x 1
1.30
TT(0.55)2/4
0.31 (-)
12.45
U/S Wings
1 x 2
1.45
0.55+0.5/2
1.13 1.71
U/S Vent
1 x 1
1.35
0.45+1.35/2
0.15 0.18
Pipe bedding at joints
1 x 3
0.60
0.80
0.80 1.15
15.50
Deduct pipe (-) 1 x 3
0.60
TT(0.55)2/4
0.43 (-)
15.07
Total Vcc M15 qty
Wearing coat in CC M 20 1 x 1
1.35
0.45+1.35/2
0.08 0.09

15.07
20.29
0.09

OFFTAKE SLUICE FOR D-35R DISTRIBUTORY AT CH.15.583 KM(LEFT CANAL)


S.N DISCRIPTION OF ITEM
1 Foundation in CC M 15
For D/S head wall
For Barrel portion
For U/S head wall

NOS
1
1
1
1

x
x
x
x

1
1
1
1

Sub structure in CC M 15
For D/S head wall
1 x 1
Deduct pipe (-) 1 x 1
For U/S head wall

QTY.

Total Qty.

4.60
6.00
3.20
2.00

1.55
1.00
2.00
3.20

0.40
0.35
0.45
0.45

2.85
2.10
2.88
2.88
10.71

10.71

4.30
0.80

1 x 1 1.8+1.1/2

Deduct pipe (-) 1 x 1


U/S Wings
U/S Vent
Pipe bedding at joints

1 x 2
1 x 1
1 x 1

Total Vcc M15 Qty


Wearing coat in CC M 20 1 x 1

1.00
1.80
1.80
0.60

1.73

1.25+0.5/2
TT(0.7)2/4
((3+(1.80+3)/2)/2)
TT(0.7)2/4
0.7+0.5/2
0.6+1.8/2
1.00

0.45+1.6/2

1.50

5.64
0.31 (-)
5.34
2.23
8.73
14.07
0.39 (-)
13.68
1.425+0/2 1.54
0.15
0.26
1.00
0.60
16.08
0.08

0.13

16.08
26.79
0.13