Environmental Clearance
Grant of Environmental Clearance (1994)
If the industrial unit comes under the specified project, then
environmental clearance would be required from he Ministry of
Environment and Forests for new projects as well as for Expansion /
modernisation of Existing projects if pollution load is increasing.
Public Hearing (1997)
Who Requires Environmental Clearance?
The following project categories are required to obtain environmental
clearance
New Projects
If investment is more than Rs. 100 crores
Nuclear power plant and related projects, such as Heavy Water
Plants, nuclear fuel complex, rare earths.
River valley projects including hydro power, major irrigation
projects and a combination, including flood control,
Ports harbours, airports (except minor ports and harbours)
Petroleum refineries including crude and product pipelines.
Chemical fertilizers
Exploration for oil and gas and their production transportation and
storage
Synthetic Rubber
Primary metallurgical industries;
Electric Arc Furnaces (Mini Steel Plants)
Viscose staple fibre and filament yarn
Storage batteries integrated with the manufacture of oxides of lead
and lead antimony alloy,
Thermal power plants
Pulp paper and newsprint
Cement
Any project proposed to be located within twenty five Km of
Reserved forests
9
Pesticides
Bulk drugs and pharmaceuticals
Asbestos and asbestos products,
All tourism projects between 200 500 meters of a High Tide Line
and at locations with an elevation of more than 1,000 meters with
investments of more than Rs. 5 crores.
Mining projects (with leases of more than 5 hectares)
Highway projects except projects relating to improvement work
Petrochemical Complexes
Tarred roads in the Himalayas and forest areas
Distilleries
Raw skins and hides
Dyes
Foundries
Chlor-alkali industry
Hydrocyanic Acid
Electroplating
Meta amine phenol
Small scale industrial units in project categories mentioned above.
With investments less than Rs. 1 crore and Which are on the
reserved list
Are exempted from environmental clearance
10
The Ministry of Environment and Forests will convey its decision about
the suitability of the proposed site within a maximum period of 30 days.
Environmental Clearance
Last Opportunity by MoEF for the defaulting project proponents
To seek environment Clearance by 31st March, 2003
Environmental Clearance can be taken for industrial estates.
The National Environment Tribunal Act, 1995
To provide for strict liability for damages arising out of any accident
occurring while handling any hazardous substance
To establish a National Environment Tribunal for grating relief and
compensation
The Tribunal may if it thinks fit take up cases for claims for
compensation suo moto (on its own)
A claimant making an application may also make an application for
immediate relief under the Public Liability Insurance Act.
Bio-medical Waste (Management & Handling) Rules, 1998
Proper segregation of wastes & labelling as specified
Install Pollution Control Systems like Incinerators, autoclaves or
microwaves or adopt the burial and meet the prescribed limits of
emissions
Comply with the dead-line stipulated to install the pollution control
systems
Transportation of waste as per the norms
Regulation on Recycling of Waste Materials, 1999, 2000
The waste materials targeted: waste oils, lead acid batteries, nonferrous wastes