Professional Documents
Culture Documents
Routine Accommodations Checklist For Project 7th Avenue and Laguna Honda Boulevard Pavement Renovation #242
Routine Accommodations Checklist For Project 7th Avenue and Laguna Honda Boulevard Pavement Renovation #242
Projects sponsors and the Congestion Management Agencies (CMAs) are responsible for the information presented in the checklists.
Questions about specific projects should be directed to the projects sponsor and the CMA.
From MTC Resolution 3765:
"CMAs will review completed project checklists and will make them available through their websites, and to their countywide Bicycle/Pedestrian
Advisory Committees (BPACs) for review and input to ensure that routine accommodation is considered at the earliest stages of project
development. The checklist outlined in Recommendation 7 should be the basis of this discussion prior to projects entering the TIP."
Checklist for project 7th Avenue and Laguna Honda Boulevard Pavement Renovation
Project description Pavement Renovation of 7th Avenue, between Hugo Street and Laguna Honda Boulevard, and
Laguna Honda Boulevard, between 7th Avenue and Dewey Boulevard. Work includes: pavement
resurfacing, concrete base repair, concrete sidewalk reconstruction, concrete curb
reconstruction, concrete parking strip repair, and concrete curb ramp construction.
Agency SFCTA
Other
Other
1 of 4 11/21/2009 10:59 AM
Routine Accommodations Checklists > View Checklist http://rac.mtc.ca.gov/rachecklist/checklistResponseStaticViewPrepare.do...
Other
Other
Other
2 of 4 11/21/2009 10:59 AM
Routine Accommodations Checklists > View Checklist http://rac.mtc.ca.gov/rachecklist/checklistResponseStaticViewPrepare.do...
Other
Other
3 of 4 11/21/2009 10:59 AM
Routine Accommodations Checklists > View Checklist http://rac.mtc.ca.gov/rachecklist/checklistResponseStaticViewPrepare.do...
Other
Other
4 of 4 11/21/2009 10:59 AM