MEETING MINUTES |
Date’ End NextDate [Next Time | Prepared By
04/22/2014 11:00AM | 04/29/2014 | 10:00AM | Jessica Buckley
Purpose, a Location
2014 Construction Meeting #3 ‘Commons Project Office ~ 215 East State St. ithaca, NY
Distribution/Attendance: | (Present at meeting unless noted! A absent)
City of ithaca ‘Michael Kuo, Jessica Buckley
Downtown ithaca Alliance | Tammy Baker
Sasaki Associates. Susannah Ross (A), Eamonn Hutton (A)
Labella Associates Dan Walker, James Matzat (A)
Vacri Construction
Ralph Avery, Andy Breznay, Matt Thomas (A), Roberto DeVincentis (A)
Power & Construction Group | Lou Zupan, Bill Planert, Brian Planert
Verizon James Edwards, Dave Comer (A)
NYSEG Gas, Doug Stafford (A), Jack Barker, Dawn Stillwell (A)
Ds JeffBubb oa
NYSEG Electric Jack Czapranski, Dennis Kuhn (A)
Item / Description Notes Due
1. RFl's
11.1. Any open RFI's at this -
2. SUBMITTALS EE
2.1. Any open submittals
2.2. Longest lead time items
2.3. 514/518 BM Pavilion - Shop drawings
SCHEDULE _
3.1, Vacri~ Submit schedule of values for
lump sum work in CH3A
3.2. P&CG — Pending start date: 04/28; Saw
cutting and drilling fence post holes this
week
3.3. NYSEG Electric - Secondary power point
to Aurora St; Update on existing
secondary mark-out
3.4. Vacri (ACP) ~ RA: report slab curing time
required prior to installing pavers
3.5. NYSEG Gas ~ E State St gas main
replacement work to begin May 5"
3.6. All: Phasing Plan Coordination
3.7. West walkway of Bank Alley will be
blocked on 4/23 from 10 am~2 pm due
Page 1 of 3‘to TTC window cleaning; Cayuga St
entrance to site will be closed 5/30 due to
Ithacafest
UTILITIES COORDINATION
‘4.1. NYSEG Gas on Bank Alley: Old main has
been retired, coordinated removal of
services with NYSEG
‘42. Verizon & Tree Pits: City awaiting
Architect’s response; P&CG to report on
any expected conflicts with the
installation of catenary poles
4.3. Verizon & Water Feature: TBD
4.5. Verizon & TMH-5:
4.4. TIC Alley/Telecom: Vacri to schedule
work and coordinate TIC and EE Root;
Update on conduit separation detail from
TTC for TMH-4; Update on spec for alley
HH
jork completed _
Cis'd
4.6. Telecom Entry to Verizon Vaults: Update
on schedule /agreement status
VAULTS
5.1. Vacri & City can coordinate to mark out
vaults
cs’
5.2. Vault infill FO issued for 208/210 & 126
E State St; Separate FD issued for
‘window’ at 126; Other possible vault
infils at 138, 119,123, 135,137,139
ELECTRIC
6.1. FD tobe issued that defines traffic ratings
for HH & designation of split HH
6.2. Installation of electrical DB — Starting on
south east end of E State St
‘TELECOM DUCT BANK
7.1. Bank Alley west walkway to be closed
week of 04/21
M&PTP: MAINTENANCE & PROTECTION
(OF TRAFFIC & PEDESTRIANS
8.1. Trucks moving through pedestrian
crossings / into / off of site are to be done
with a flagger
8.2. Any work to disrupt pedestrian flow or
‘work within private property is to be
coordinated with Tammy Baker: (607)
220-8425
Cs'd
8.3. Contractor(s) to coordinate with fire
department for restricted emergency
access ~ Dispatch: (607) 273-7288
Page 2 of 38.4. ADA accessibility: Requires 4 ft of
pedestrian access
85. Vehicle traffic maintenance & protection
is to meet NYSDOT Standards
ATTACHMENTS
‘A. Emergency Contact List
B._ Sample Phasing Plans
ADDITIONAL NOTES
Page 3 of 3