Lecture outline

 The grid diagram for HEN design


 The pinch design method (PDM)

Heat exchanger network III Pinch


design method & network evolution

 Minimum unit targeting


 Stream splitting
 Network evolution

Copyright@Dominic Foo

Heuristics for HEN design

H82PLD - Plant Design

PDM - 2

The composite curves


QHmin

Cost

T (C)

Total
Energy

Pinch

Capital
Heat
source

Tmin

 No individual heat exchanger should have a temp


difference < than Tmin
 To achieve energy targets, must not transfer heat across the
pinch by:

Tmin

 Process-process heat transfer


 Inappropriate use of utility
Copyright@Dominic Foo

H82PLD - Plant Design

Heat
sink

H (MW)

QCmin

PDM - 3

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 4

Heat transfer across pinch

Don
Dont cold above the pinch

QHmin +XP

T (C)

XP

QHmin +XP

T (C)

Heat
sink

Heat
sink

Heat
source

Heat
source

H (MW)

QCmin+XP

Copyright@Dominic Foo

H82PLD - Plant Design

XP

H (MW)

QCmin

PDM - 5

Copyright@Dominic Foo

H82PLD - Plant Design

Don
Dont heat below the pinch
QHmin

T (C)

XP

Let
Lets design together while
we go along

Heat
sink

Heat
source

H (MW)

QCmin+XP

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 7

PDM - 6

Back to the previous example


Feed 2

230C

140C
Feed 1

180C

20C

Reactor 1

Reactor 2

200C

The grid diagram


Product 2
80C

250C

Off gas, 40C

 To comply with the rules, process should be


divided at the pinch
 The grid diagram:

40C

Q = mC p T = mC p (TT TS )

Below pinch
Product 1, 40C

Supply
Target
H Heat capacity
temp,
temp,
Steam
Type
flowrate, CP
(MW) (MW.K-1)
TS (C)
TT (C)
1. Reactor 1 feed
Cold
20
180
32.0
0.20
2. Reactor 1 product
Hot
250
40
31.5
0.15
3. Reactor 2 feed
Cold
140
230
27.0
0.30
4. Reactor 2 product
Hot
200
80
30.0
0.25
Note: Heat capacity flowrate, CP = m.Cp
Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 9

Pinch

40

150

250

80

150

200

20

140

180

140

230

3
QC, min = 10 MW

1. Start design at the pinch


 Pinch is the most constrained region of the network
 At the pinch, Tmin exists between all hot & cold
streams  number of feasible matches is limited
 Start design at the pinch avoid trouble in stream
matching at later stage

0.15

31.5

0.25

30.0

0.20

32.0

0.30

27.0

QH, min = 7.5 MW

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 10

T (C)

Above pinch:
CPH CPC

Pinch

2. The CP inequality for individual match

Tmin

 Above pinch: CPH CPC


 Below pinch: CPH CPC

Below pinch:
CPH CPC

3. The CP table

H (MW)

4. The tick-off heuristic


H82PLD - Plant Design

H
(MW)

CP inequality

The pinch design method (PDM)

Copyright@Dominic Foo

CP
(MW/C)

Above pinch

PDM - 13

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 14

CP inequality
Below pinch

The CP table

Pinch

Above pinch

40

150

250

80

150

200

20

140

180

3 140

230

Below pinch:
CPH CPC
 Note:

CPH CPC

0.25

0.2

Generalisation:
CPout CPin

PDM - 15

The ticktick-off
off heuristic

 Proceed to other streams away from pinch


 Complete the design with hot & cold utility:
 Only use hot utility above the pinch
 Only use cold utility below the pinch

40

150 2

80

150 4

20

140

0.15

0.2
Pinch CP

0.15
0.25
1

0.20

Copyright@Dominic Foo

150

250 2

0.15

150

200 4

0.25

140

180

140

230

H82PLD - Plant Design

0.20
0.30

PDM - 16

Pinch

CP H
2 0.15 15.0

200

4 0.25 12.5

1 140

180

0.20 8.0

3
PDM - 17

250

150

150

140

203.3

7.5

8.0
181.7

12.5

H82PLD - Plant Design

0.3

Region above the pinch

 Minimum number of heat exchanger units leads to


reduced capital cost  achieved by tick-off
heuristic
 Individual units are made as large as possible, i.e.
smaller of the 2 heat duties on the matched stream
 Tick-off the stream where heat is fully recovered

Copyright@Dominic Foo

0.25

Pinch CP

Above pinch:
CPH CPC

H82PLD - Plant Design

CPH CPC

CPs in
descending
order

0.15

 Only apply at the pinch & when both end of the match are at pinch
conditions
 Away from the pinch, temp differences increase  no longer
essential to obey CP inequalities
Copyright@Dominic Foo

Above pinch

Below pinch

Copyright@Dominic Foo

205 H
7.0

230

14.5

0.30 27.0

7.5

H82PLD - Plant Design

PDM - 18

Region below the pinch

A complete network
Pinch

Pinch CP H
40
80

106.7

10.0

52.5

20
6.5

Copyright@Dominic Foo

150

150

140

10

2 0.15 16.5
80

C
10.0

6.5

0.20 24.0

1 20
6.5

PDM - 19

 Minimum number of heat exchanger units:


 The tick-off heuristic of PDM steers the network design towards
the minimum number of heat exchanger units
 The stream that has been ticked-off is no longer part of the
remaining design problem  ensures that a stream is removed
from the problem once a unit is placed.

Copyright@Dominic Foo

150

200

140

180
8.0

140
12.5

H 230
7.0

7.5

H82PLD - Plant Design

PDM - 20

 Minimum number of heat exchanger in a HEN:


Nunits = S 1

where S = number of streams including utilities


 Due to the existence of the pinch point, unit targets is
applied to both sides of the pinch:
Nunits = [SAbove pinch 1] + [SBelow pinch 1]

 The grid diagram:

Below pinch

 General steps of PDM:


Divide the region at the pinch (i.e. above/below pinch)
Start design at the pinch, moving away.
At the pinch, temp feasibility requires that CPout CPin
Loads of heat exchangers are determine by using tick-off heuristic.
Away from pinch, design is more flexible  consider other
practical factors, e.g. operability, plant layout, etc.
H82PLD - Plant Design

250

Number of heat exchange units

 Tick-off heuristic occasionally may cause problem, be aware

Copyright@Dominic Foo

17.5

Utility targets matched 3


(refer to CC & PTA for this
problem in earlier lecture)

Some remarks on PDM







150

4 0.25 17.5

17.5

H82PLD - Plant Design

40

PDM - 21

Pinch

Above pinch
Steam
1
2

CW
Nunits = (5 1) + (4 1) = 7
Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 22

The highway analogy

Do we have min # of HX?


Nunits = (4 1) + (5 1) = 7

Kajang

KL
Kajang

KL

Semenyih

80
Semenyih

KLIA
Kajang

KL

Semenyih

1.
2.
3.
4.

Hot
Hot
Cold
Cold

10.0

What is the
minimum no of
road needed to
connect all cities?

250

150

200

1 20

140

180

6.5

8.0

17.5

3 140
12.5

H82PLD - Plant Design

PDM - 23

Copyright@Dominic Foo

H82PLD - Plant Design

H 230
7.0

7.5
PDM - 24

Min # of HX units

Supply temp, Target temp, Heat capacity


flowrate, CP
TS (C)
TT (C)
(MW.K-1)
0.3
400
60
0.5
210
40
20
160
0.4
100
300
0.6

H
(MW)

 Design a HEN for maximum recovery that feature the


minimum number of units.
 Targeting from PTA:
 QH,min = 15 MW
 QC,min = 26 MW

Nunits = _____ + _____ = ____


60

400

40

210

3 20

160

4 100

 Tmin = 20C:

 Hot pinch temp = 120C


 Cold pinch temp = 100C

Copyright@Dominic Foo

150

Putrajaya

Working session
Type

Putrajaya

Copyright@Dominic Foo

Steam

40

H82PLD - Plant Design

PDM - 25

Copyright@Dominic Foo

H82PLD - Plant Design

300

PDM - 26

Complete network
60

400

40

210

3 20

160

4 100
Copyright@Dominic Foo

H82PLD - Plant Design

Practice makes perfect!


perfect!

300

PDM - 29

Stream splitting

Number of streams above pinch

 The PDM allows for minimum utility (or maximum


energy recovery) using minimum number of
units.

Pinch
100

 Stream splitting needs to be considered in the


following situations:

100

4
5

H82PLD - Plant Design

PDM - 31

100

90

T > 90

90

T > 90

Copyright@Dominic Foo

100

100

 Number of streams at the pinch


 CP inequality cannot be met at the pinch

Copyright@Dominic Foo

Pinch

100

4
5

1
2
3

90
90

H82PLD - Plant Design

PDM - 32

CP inequality above pinch

Number of streams below pinch

Above pinch
Pinch
100 T < 100
100 T < 100

3
4
5

100 T < 100

100 T < 100

90

90
90

CPH CPC
SH SC

Pinch

100

90

Pinch
100

90
90

PDM - 33

Copyright@Dominic Foo

CPH CPC
SH SC

5
4

Pinch CP

90

90

4
3

Yes

CPout CPin
for pinch
matches?

Yes

100
100

H82PLD - Plant Design

PDM - 34

No
No

Split out
stream
Split in
stream

90

Place
matches

Remark: New CP values may vary, so long as CP inequalities are satisfied.


Copyright@Dominic Foo

Nout Nin?

Pinch CP

Stream data
at pinch

4
3

Stream splitting algorithms


CPH CPC
SH SC

90

H82PLD - Plant Design

Below pinch

90

Below pinch

CP

CP inequality below pinch

100

4
3

90

H82PLD - Plant Design

100

3
2

5
CP

5
4

4
3

Pinch

Copyright@Dominic Foo

Above pinch
CPH CPC
SH SC

PDM - 35

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 36

Working session
Steam

Type

1.
2.
3.
4.

Hot
Hot
Cold
Cold

Complete network

Supply temp, Target temp, Heat capacity


flowrate, CP
TS (C)
TT (C)
(MW.K-1)
720
320
0.045
520
220
0.040
300
900
0.043
200
550
0.02

H
(MW)

 QH,min = 9.2 MW
 QC,min = 6.4 MW

 Tmin = 20C:

 Hot pinch temp = 520C


 Cold pinch temp = 500C
H82PLD - Plant Design

PDM - 37

720

320
220

 Design a HEN for maximum recovery that feature the


minimum number of units.
 Targeting from PTA:

Copyright@Dominic Foo

Nunits = _____ + _____ = ____

520 2

3 300

900

4 200

550

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 40

Network optimisation

Practice makes perfect!


perfect!

 None of the heat exchangers in a HEN synthesised


by PDM should have a temp difference < Tmin.
 Once a HEN is synthesised, it can undergo
continuous optimisation, the constraints of no heat
exchangers having temp difference < Tmin can be
relaxed (pinch is ignored).
 Heat exchanger duties will be redistributed:
 Some become bigger
 Some become smaller or removed (new duty = 0)

 Useful tools:
 Utility paths lines that connects between 2 utilities
 Heat loops path that begins & ends at the same point
Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 42

Heat loops

Heat loops
Pinch is
ignored

40

+U

250 2

40

80

200 4

80

20

180

U
Heat loop

+U
3

+V

250 2

C
V

+V

200 4

20

180
V

230

+V
3

230

+V
Heat loop

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 43

Utility paths
40

+W
C

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 44

Utility paths
Utility path

+X
C

+X

250 2

40

80

200 4

80

200 4

20

180

20

180

3
W

Copyright@Dominic Foo

H82PLD - Plant Design

H
+W

230

Utility path

PDM - 45

Copyright@Dominic Foo

250 2

+X
3
X

H82PLD - Plant Design

H
+X

230

PDM - 46

Some remarks

Working session

 For heat exchanger with new heat duty = 0, the exchanger is


removed from the network

 Evolve the HEN designed earlier by PDM to

 During optimisation, design is no longer constrained to


have temp difference > Tmin (very small Tmin should be
avoided for practical reasons)
 Pinch no longer divides design in independent
thermodynamic regions (above & below pinch)  main
concern is to reduce cost
 Heat loops, utility paths & stream splits offer degree of
freedom for manipulating network cost
 To optimise network:

simplify its structure:


 Remove smallest unit from the network by exploiting
degree of freedom in a loop
 Recalculate the network temp & identify any violations
of Tmin = 10C constraint
 Restore the original Tmin = 10C throughout the
network by exploiting a utility path

 At fixed energy consumption: loops & stream splits


 Varying energy consumption is allowed: include utility paths
Copyright@Dominic Foo

H82PLD - Plant Design

Practice makes perfect!


perfect!

PDM - 47

Copyright@Dominic Foo

H82PLD - Plant Design

PDM - 48

You might also like