Professional Documents
Culture Documents
Lecture 9 - Hen III - PDM
Lecture 9 - Hen III - PDM
Copyright@Dominic Foo
PDM - 2
Cost
T (C)
Total
Energy
Pinch
Capital
Heat
source
Tmin
Tmin
Heat
sink
H (MW)
QCmin
PDM - 3
Copyright@Dominic Foo
PDM - 4
Don
Dont cold above the pinch
QHmin +XP
T (C)
XP
QHmin +XP
T (C)
Heat
sink
Heat
sink
Heat
source
Heat
source
H (MW)
QCmin+XP
Copyright@Dominic Foo
XP
H (MW)
QCmin
PDM - 5
Copyright@Dominic Foo
Don
Dont heat below the pinch
QHmin
T (C)
XP
Let
Lets design together while
we go along
Heat
sink
Heat
source
H (MW)
QCmin+XP
Copyright@Dominic Foo
PDM - 7
PDM - 6
230C
140C
Feed 1
180C
20C
Reactor 1
Reactor 2
200C
250C
40C
Q = mC p T = mC p (TT TS )
Below pinch
Product 1, 40C
Supply
Target
H Heat capacity
temp,
temp,
Steam
Type
flowrate, CP
(MW) (MW.K-1)
TS (C)
TT (C)
1. Reactor 1 feed
Cold
20
180
32.0
0.20
2. Reactor 1 product
Hot
250
40
31.5
0.15
3. Reactor 2 feed
Cold
140
230
27.0
0.30
4. Reactor 2 product
Hot
200
80
30.0
0.25
Note: Heat capacity flowrate, CP = m.Cp
Copyright@Dominic Foo
PDM - 9
Pinch
40
150
250
80
150
200
20
140
180
140
230
3
QC, min = 10 MW
0.15
31.5
0.25
30.0
0.20
32.0
0.30
27.0
Copyright@Dominic Foo
PDM - 10
T (C)
Above pinch:
CPH CPC
Pinch
Tmin
Below pinch:
CPH CPC
3. The CP table
H (MW)
H
(MW)
CP inequality
Copyright@Dominic Foo
CP
(MW/C)
Above pinch
PDM - 13
Copyright@Dominic Foo
PDM - 14
CP inequality
Below pinch
The CP table
Pinch
Above pinch
40
150
250
80
150
200
20
140
180
3 140
230
Below pinch:
CPH CPC
Note:
CPH CPC
0.25
0.2
Generalisation:
CPout CPin
PDM - 15
The ticktick-off
off heuristic
40
150 2
80
150 4
20
140
0.15
0.2
Pinch CP
0.15
0.25
1
0.20
Copyright@Dominic Foo
150
250 2
0.15
150
200 4
0.25
140
180
140
230
0.20
0.30
PDM - 16
Pinch
CP H
2 0.15 15.0
200
4 0.25 12.5
1 140
180
0.20 8.0
3
PDM - 17
250
150
150
140
203.3
7.5
8.0
181.7
12.5
0.3
Copyright@Dominic Foo
0.25
Pinch CP
Above pinch:
CPH CPC
CPH CPC
CPs in
descending
order
0.15
Only apply at the pinch & when both end of the match are at pinch
conditions
Away from the pinch, temp differences increase no longer
essential to obey CP inequalities
Copyright@Dominic Foo
Above pinch
Below pinch
Copyright@Dominic Foo
205 H
7.0
230
14.5
0.30 27.0
7.5
PDM - 18
A complete network
Pinch
Pinch CP H
40
80
106.7
10.0
52.5
20
6.5
Copyright@Dominic Foo
150
150
140
10
2 0.15 16.5
80
C
10.0
6.5
0.20 24.0
1 20
6.5
PDM - 19
Copyright@Dominic Foo
150
200
140
180
8.0
140
12.5
H 230
7.0
7.5
PDM - 20
Below pinch
250
Copyright@Dominic Foo
17.5
150
4 0.25 17.5
17.5
40
PDM - 21
Pinch
Above pinch
Steam
1
2
CW
Nunits = (5 1) + (4 1) = 7
Copyright@Dominic Foo
PDM - 22
Kajang
KL
Kajang
KL
Semenyih
80
Semenyih
KLIA
Kajang
KL
Semenyih
1.
2.
3.
4.
Hot
Hot
Cold
Cold
10.0
What is the
minimum no of
road needed to
connect all cities?
250
150
200
1 20
140
180
6.5
8.0
17.5
3 140
12.5
PDM - 23
Copyright@Dominic Foo
H 230
7.0
7.5
PDM - 24
Min # of HX units
H
(MW)
400
40
210
3 20
160
4 100
Tmin = 20C:
Copyright@Dominic Foo
150
Putrajaya
Working session
Type
Putrajaya
Copyright@Dominic Foo
Steam
40
PDM - 25
Copyright@Dominic Foo
300
PDM - 26
Complete network
60
400
40
210
3 20
160
4 100
Copyright@Dominic Foo
300
PDM - 29
Stream splitting
Pinch
100
100
4
5
PDM - 31
100
90
T > 90
90
T > 90
Copyright@Dominic Foo
100
100
Copyright@Dominic Foo
Pinch
100
4
5
1
2
3
90
90
PDM - 32
Above pinch
Pinch
100 T < 100
100 T < 100
3
4
5
90
90
90
CPH CPC
SH SC
Pinch
100
90
Pinch
100
90
90
PDM - 33
Copyright@Dominic Foo
CPH CPC
SH SC
5
4
Pinch CP
90
90
4
3
Yes
CPout CPin
for pinch
matches?
Yes
100
100
PDM - 34
No
No
Split out
stream
Split in
stream
90
Place
matches
Nout Nin?
Pinch CP
Stream data
at pinch
4
3
90
Below pinch
90
Below pinch
CP
100
4
3
90
100
3
2
5
CP
5
4
4
3
Pinch
Copyright@Dominic Foo
Above pinch
CPH CPC
SH SC
PDM - 35
Copyright@Dominic Foo
PDM - 36
Working session
Steam
Type
1.
2.
3.
4.
Hot
Hot
Cold
Cold
Complete network
H
(MW)
QH,min = 9.2 MW
QC,min = 6.4 MW
Tmin = 20C:
PDM - 37
720
320
220
Copyright@Dominic Foo
520 2
3 300
900
4 200
550
Copyright@Dominic Foo
PDM - 40
Network optimisation
Useful tools:
Utility paths lines that connects between 2 utilities
Heat loops path that begins & ends at the same point
Copyright@Dominic Foo
PDM - 42
Heat loops
Heat loops
Pinch is
ignored
40
+U
250 2
40
80
200 4
80
20
180
U
Heat loop
+U
3
+V
250 2
C
V
+V
200 4
20
180
V
230
+V
3
230
+V
Heat loop
Copyright@Dominic Foo
PDM - 43
Utility paths
40
+W
C
Copyright@Dominic Foo
PDM - 44
Utility paths
Utility path
+X
C
+X
250 2
40
80
200 4
80
200 4
20
180
20
180
3
W
Copyright@Dominic Foo
H
+W
230
Utility path
PDM - 45
Copyright@Dominic Foo
250 2
+X
3
X
H
+X
230
PDM - 46
Some remarks
Working session
PDM - 47
Copyright@Dominic Foo
PDM - 48