UK Building Blackbook
UK Building Blackbook
The Small Works and Maintenance
Construction Cost Guide
Hutchins 2010
Small Works.indd 1
Volume One:
Small Works
08/09/2009 15:53:03
Contents
2010 Edition
Acknowledgements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi
General Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .xiii
Pricing Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxx
Preliminaries and General Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxii
Measured Unit Rates
Excavation, Earthwork and Concrete Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Brickwork and Blockwork . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Woodwork
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
Appendices
Indices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359
UK Location factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 361
Facility Benchmark Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 363
Sustainability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 366
Memoranda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 371
Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387
General Introduction
The Small Works section of Hutchins' UK Building Costs Blackbook has, this year, reverted to its
original independent state and appears as a stand-alone publication newly titled The Small
Works and Maintenance Construction Cost Guide. It continues to fully address the needs of
smaller projects within the building industry in providing an accurate, comprehensive and up-todate database of cost information. It preserves the specific format of each of the separate work
sections as previous editions, being measured consistent with a trade based structured format,
SMM6 as before.
This publication includes location factors for the UK and a memoranda section together with
average building costs for works of a minor nature, building indices which track the movement of
costs, and a section on sustainability, all which were introduced within earlier editions. The rates
have been updated to reflect the current climate within the building environment including all the
new and available wage rates for the construction industry and any cost adjustments for both
plant and material resources. The features within each section will prove invaluable to
professionals checking or producing cost estimates.
The list of location factors for locations within the UK will enable rapid cost adjustments to be
made to both feasibility and tender predictions. The memoranda section detailing useful
reference information in trade format has also been included in response to readers' requests.
Introduction
Background
The edition for this year has retained the basic content as for previous years' publications and
maintains the additional enhancements to the format, introduced in previous works, in order to
improve the value to the reader. These improvements will, hopefully, ensure that the production
of estimates and cost appraisals is made easier and more effective than before.
The measured rates sections are, wherever possible, generally trade based ensuring that the
task of locating prices is made more simple. These measured rates sections are presented with
pricing information displayed at both Net and Gross cost levels. The Memoranda section
provides general information relating to material statistics including required quantities for
selected work elements, specification information generally and other useful data.
xiii
201
NEW WORK
20101
CLASS B ENGINEERING
BRICKWORK IN CEMENT
MORTAR (1:3)
Unit
Labour
Hours
Labour
Net
Plant Materials
Net
Net
Unit
Net
Labour
Gross
Plant
Gross
Materials
Gross
Unit
Price
2010101 Walls
2010101A
half brick thick . . . . . . . . . . .
2010101B
one brick thick . . . . . . . . . . .
m2
m2
0.58
0.98
44.11
74.92
28.76
56.25
72.87
131.17
48.52
82.41
31.64
61.88
80.16
144.29
m2
m2
0.58
0.98
44.11
74.92
28.76
56.25
72.87
131.17
48.52
82.41
31.64
61.88
80.16
144.29
m2
0.44
33.87
21.84
55.71
37.26
24.02
61.28
0.74
1.49
0.74
1.49
0.81
1.64
0.81
1.64
0.16
0.17
0.04
12.00
12.84
2.83
12.00
12.84
2.83
13.20
14.12
3.11
13.20
14.12
3.11
2010104
2010105
COMMON BRICKWORK IN
GAUGED MORTAR (1:1:6)
2010201 Walls
2010201A
half brick thick . . . . . . . . . . .
2010201B
one brick thick . . . . . . . . . . .
m2
m2
0.56
0.91
42.58
69.49
21.76
41.71
64.34
111.20
46.84
76.44
23.94
45.88
70.77
122.32
m2
m2
0.56
0.91
42.58
69.49
22.16
46.34
64.74
115.83
46.84
76.44
24.38
50.97
71.21
127.41
m2
0.43
32.80
17.41
50.21
36.08
19.15
55.23
m2
m2
m2
0.62
1.02
1.22
47.70
78.21
93.57
22.16
46.34
70.28
69.86
124.55
163.85
52.47
86.03
102.93
24.38
50.97
77.31
76.85
137.01
180.24
m2
m2
m2
1.13
1.36
1.67
86.62
103.59
127.44
46.34
70.28
93.67
132.96
173.87
221.11
95.28
113.95
140.18
50.97
77.31
103.04
146.26
191.26
243.22
m
m
m
m
0.19
0.48
0.27
0.91
14.14
36.93
20.26
69.49
5.66
11.01
8.04
16.81
19.80
47.94
28.30
86.30
15.55
40.62
22.29
76.44
6.23
12.11
8.84
18.49
21.78
52.73
31.13
94.93
2010204
30
Woodwork
Small Works
2010
301
NEW WORK
30154
IRONMONGERY
Unit
Labour
Hours
Labour
Net
Plant Materials
Net
Net
Unit
Net
Labour
Gross
Plant
Gross
Materials
Gross
Unit
Price
3015419
3.50
97.30
44.52
141.82
107.03
48.97
156.00
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
1.25
1.45
1.00
1.20
1.00
0.30
0.50
0.30
0.60
0.25
34.75
40.31
27.80
33.36
27.80
8.34
13.90
8.34
16.68
6.95
33.66
39.30
37.20
36.67
6.24
1.42
3.32
5.39
5.39
0.90
68.41
79.61
65.00
70.03
34.04
9.76
17.22
13.73
22.07
7.85
38.23
44.34
30.58
36.70
30.58
9.17
15.29
9.17
18.35
7.65
37.03
43.23
40.92
40.34
6.86
1.56
3.65
5.93
5.93
0.99
75.25
87.57
71.50
77.03
37.44
10.74
18.94
15.10
24.28
8.64
Each
Each
Each
1.75
1.75
0.40
48.65
48.65
11.12
105.17
13.18
4.66
153.82
61.83
15.78
53.52
53.52
12.23
115.69
14.50
5.13
169.20
68.01
17.36
3015424 Bolts
3015424A
150 mm barrel; straight . . . .
3015424B
255 mm barrel; straight . . . .
3015424C
150 mm tower; straight . . . .
3015424D
255 mm tower; straight . . . .
3015424E
455 mm monkey tail. . . . . . .
3015424F
225 mm flush . . . . . . . . . . . .
3015424G
indicator . . . . . . . . . . . . . . . .
3015424H
single door panic . . . . . . . . .
3015424I
double door panic. . . . . . . . .
Each
Each
Each
Each
Each
Each
Each
Each
Each
0.45
0.55
0.45
0.55
0.55
0.85
1.20
1.75
2.30
12.51
15.29
12.51
15.29
15.29
23.63
33.36
48.65
63.94
4.15
6.90
2.53
4.93
21.72
24.00
10.70
58.37
70.96
16.66
22.19
15.04
20.22
37.01
47.63
44.06
107.02
134.90
13.76
16.82
13.76
16.82
16.82
25.99
36.70
53.52
70.33
4.57
7.59
2.78
5.42
23.89
26.40
11.77
64.21
78.06
18.33
24.41
16.54
22.24
40.71
52.39
48.47
117.72
148.39
Each
Each
Each
0.30
0.20
0.20
8.34
5.56
5.56
7.42
7.42
7.10
15.76
12.98
12.66
9.17
6.12
6.12
8.16
8.16
7.81
17.34
14.28
13.93
Each
0.40
11.12
7.00
18.12
12.23
7.70
19.93
Each
1.75
48.65
10.27
58.92
53.52
11.30
64.81
Each
0.40
11.12
4.78
15.90
12.23
5.26
17.49
Each
0.50
13.90
4.94
18.84
15.29
5.43
20.72
Each
Each
Each
Each
0.55
1.20
0.30
0.40
15.29
33.36
8.34
11.12
5.99
5.99
3.28
5.57
21.28
39.35
11.62
16.69
16.82
36.70
9.17
12.23
6.59
6.59
3.61
6.13
23.41
43.29
12.78
18.36
3015428 Plates
3015428A
door push plate. . . . . . . . . . .
3015428B
letter plate and opening
through door. . . . . . . . . . . . .
3015430 Window fittings
3015430A
casement stay; 305 mm;
with two pins. . . . . . . . . . . . .
3015430B
casement fastener; wedge
pattern . . . . . . . . . . . . . . . . . .
3015430C
casement fastener; locking
with keys . . . . . . . . . . . . . . . .
3015430D
sliding sash fastener . . . . . .
3015430E
sash lift . . . . . . . . . . . . . . . . .
3015430F
quadrant stay . . . . . . . . . . . .
83
Landscaping
Small Works
2010
C01
C0106
TREE PLANTING
Unit
Labour
Hours
Labour
Net
Plant Materials
Net
Net
Unit
Net
Labour
Gross
Plant
Gross
Materials
Gross
Unit
Price
Each
0.01
0.21
0.21
0.23
0.23
Each
0.09
1.88
1.88
2.07
2.07
Each
0.16
3.34
3.34
3.67
3.67
Each
0.02
0.42
0.31
0.73
0.46
0.34
0.80
Each
0.16
3.34
2.74
6.08
3.67
3.01
6.69
Each
Each
Each
Each
Each
Each
0.29
0.10
0.12
0.15
0.19
0.19
6.05
2.09
2.50
3.13
3.96
3.96
4.26
0.60
4.67
17.58
41.03
41.03
10.31
2.69
7.17
20.71
44.99
44.99
6.66
2.30
2.75
3.44
4.36
4.36
4.69
0.66
5.14
19.34
45.13
45.13
11.34
2.96
7.89
22.78
49.49
49.49
Each
Each
0.22
0.24
4.59
5.00
41.03
49.00
45.62
54.00
5.05
5.50
45.13
53.90
50.18
59.40
Each
0.27
5.63
164.12
169.75
6.19
180.53
186.73
Each
0.01
0.21
0.21
0.23
0.23
Each
0.05
1.04
1.04
1.14
1.14
Each
0.08
1.67
1.67
1.84
1.84
Each
0.01
0.21
0.12
0.33
0.23
0.13
0.36
Each
0.01
0.21
0.88
1.09
0.23
0.97
1.20
Each
0.02
0.42
1.47
1.89
0.46
1.62
2.08
Each
0.01
0.21
0.21
0.23
0.23
Each
0.03
0.63
0.63
0.69
0.69
Each
0.04
0.83
0.83
0.91
0.91
Each
0.25
5.21
1.27
6.48
5.73
1.40
7.13
Each
0.45
9.38
2.42
11.80
10.32
2.66
12.98
337
Memoranda
EXCAVATION
Excavated material bulking
Bulking per m3
Material
Loose sand
Loose gravel
Compacted sand
Compacted gravel
Soft clay
Firm clay
Loamy soil
Vegetable soil
Subsoil
Stiff clay
Hard boulder clay
Weathered rock
Solid chalk
Unweathered rock
1.05
1.10
1.20
1.25
1.25
1.25
1.25
1.25
1.25
1.40
1.50
1.60
1.75
1.75
CONCRETE WORK
Material quantities per 1 m3 of concrete
Nominal concrete
mix (by volume)
1:1.5:3
1:2:4
1:3:6
Cement
(m3)
0.273
0.214
0.150
Moist sand
(m3)
0.545
0.572
0.600
Coarse aggregate
(m3)
0.818
0.857
0.900
Nominal concrete
mix (by weight)
1:1.5:3
1:2:4
1:3:6
Cement
(tonnes)
0.393
0.308
0.216
Moist sand
(tonnes)
0.687
0.721
0.756
Coarse aggregate
(tonnes)
1.227
1.286
1.350
372