PURCHASE REQUISITION
Sunnyside Unified School District #412 PR Number: 93203
2238. Ginter Ra. . .
Tucson, AZ 85706 Draft Copy
PO Number:
Requisition Type: Regular
i suggested Vendor: PUEBLO MECHANICAL & CONTROLS
Deparhoent: Maintenance, Office Suggested Vendor: NG (6771 E OUTLOOK DR) 545.1048
Requested by: Espinosa, Frank Vendor Address: 6771 E OUTLOOK DR
Date Issued TUCSON, AZ 85756
Date Expected:
Ship Te Maintenance, Office Phon: 545-1044
Quote Required: oral FAX: 545-1048,
Quote\Bid#: QUOTES ON FILE Primary Contact:
Quote\Bid Notes:
Gy [Gait [Park |Description —Tiecount Coe [fax Rate [Unit Price_| Extended]
7] 800 DESERT VIEW GYMWEST | €301200-4700-6720-211-00-7107 ‘0% | $3700.39 ] $3700.37
K SMALL UNIT SCOPE OF WORK:
REMOVE AND REPLACE TWO
BLOWER BEARINGS PLUS NEW
BEARING BRACKET AND ON
OPPOSITE SIDE OF MOTOR
DRIVE. REMOVE AND REPLACE
DAMAGED BLOWER SHAFT.
REINSULATE ENTIRE BLOWER
‘SECTION WITH 1" DUCT LINER
INCLUDING NECESSARY GLUE
‘AND STICK PINS. GREASE
BEARINGS. CHECK AND SIGN
BLOWER AND MOTOR
SHEAVE/PULLEYS. INSTALL
NEW V-BELTS AND SET
PROPER TENSION, PERFORM
VIBRATION ANALYSIS. RUN.
TEST AND CHECK AMPERAGE
(OF MOTOR AND OPERATING.
‘CONDITION OF BLOWER
‘ASSEMBLY
7 [800 DESERT VIEW GYMEAST ‘SSDI TOOATOO-BTODAT-OO-TIOT 9.10% | $286.68
K SMALL REPAIRS. SCOPE OF
WORK: REMOVE 2 NOISY
BLOWER BEARINGS (MAJOR
DAMAGE WILL OCCUR IF NOT
REPLACED). PREPARE
EXISTING SHAFT FOR
INSTALLATION OF NEW.
BEARINGS. INSTALLATION OF 2
NEW BEARINGS, GREASE
BEARINGS. CHECK AND ALIGN
BLOWER AND MOTOR
SHEAVES/PULLEYS. INSTALL
NEW V-BELTS AND CHECK
TENSION. REMOVE AND.
REPLACE DETERIORATED
‘SUPPLY AIR FLEX
‘CONNECTOR. PERFORM
VIBRATION ANALYSIS. RUN,
TEST AND CHECK AMPERAGE
(OF MOTOR AND OPERATING
CONDITION OF BLOWER
L ASSEMBLY,
Page 1 of 2PURCHASE REQUISITION
DESERT VIEW GYM
WESTINORTH SYSTEM. SCOPE.
(OF WORK: REMOVE 2 EXISTING
DAMAGED BLOWER BEARINGS.
PREPARE EXISTING SHAFT
FOR INSTALLATION OF NEW.
BEARINGS, INSTALLATION OF 2
NEW BLOWER BEARING (1 QTY
415/16" AND 1 QTY 1-7/16-)
GREASE BEARINGS, CHECK
‘AND ALIGN BLOWER AND
MOTOR SHEAVEIPULLEYS,
INSTALL NEW V-ELETS AND
‘SET PROPER TENSION,
PERFORM VIBRATION
‘ANALYSIS, RUNT TEST AND
CHEGK AMPERAGE OF MOTOR
[AND OPERATING CONDITION.
OF BLOWER ASSEMBLY.
7} B00
K
DESERT VIEW GYM.
EASTILARGE UNIT. SCOPE OF
WORK: REMOVE 2 EXISTING
DAMAGED BLOWER BEARINGS.
PREPARE EXISTING SHAFT
FOR INSTALLATION OF NEW.
BEARINGS. INSTALLATION OF 2
NEW BLOWER BEARING (ITY
4-15/16" AND 1 OTY 1-7/16),
GREASE BEARINGS, CHECK
‘AND ALIGN BLOWER AND
MOTOR SHEAVEIPULLEYS.
INSTALL NEW V.BELTS AND
SET PROPERT TENSION.
PERFORM VIBRATION
ANALYSIS, RUN TEST AND
CHEGK AMPERAGE OF MOTOR
[AND OPERATING CONDITION.
(OF BLOWER ASSEMBLY.
EXCLUSIONS: REPAIR OR
REPLACEMENT OF ANY
DEVISCE NOT LISTED OR
BALANCING OF BLOWER
WHEEL IF GOUND NECESSARY
UPON BIBRATION ANALYSIS,
BIT TOATO STOTT OO TOT
370%
‘SaB8TaE
$2867a6
B50 12 00-8700-6720-277-00-7107
340%
‘S220087
fax
Tax
ROO ATOO RTO AAT-OOTIOT
2.00%
$666.88
Ses6 as
“Approved:
Date Approved:
Rejected By:
Date Rejected:
‘Subtotal Estimate:
Total Tax Estimate:
TOTAL Estimate:
sitz7440
_ $066.88,
‘$11041.28
‘Comments \ Reason Rejected:
‘Richard Sanchez requesting PO for work to replace blower bearings at DVHS on east and west of,
Gym. Received quotes from Pueblo Mechanical & Controls, Inc. Midstate Mechanical and HACL
No Bid,
Page 2 of 2