You are on page 1of 2
PURCHASE REQUISITION Sunnyside Unified School District #412 PR Number: 93203 2238. Ginter Ra. . . Tucson, AZ 85706 Draft Copy PO Number: Requisition Type: Regular i suggested Vendor: PUEBLO MECHANICAL & CONTROLS Deparhoent: Maintenance, Office Suggested Vendor: NG (6771 E OUTLOOK DR) 545.1048 Requested by: Espinosa, Frank Vendor Address: 6771 E OUTLOOK DR Date Issued TUCSON, AZ 85756 Date Expected: Ship Te Maintenance, Office Phon: 545-1044 Quote Required: oral FAX: 545-1048, Quote\Bid#: QUOTES ON FILE Primary Contact: Quote\Bid Notes: Gy [Gait [Park |Description —Tiecount Coe [fax Rate [Unit Price_| Extended] 7] 800 DESERT VIEW GYMWEST | €301200-4700-6720-211-00-7107 ‘0% | $3700.39 ] $3700.37 K SMALL UNIT SCOPE OF WORK: REMOVE AND REPLACE TWO BLOWER BEARINGS PLUS NEW BEARING BRACKET AND ON OPPOSITE SIDE OF MOTOR DRIVE. REMOVE AND REPLACE DAMAGED BLOWER SHAFT. REINSULATE ENTIRE BLOWER ‘SECTION WITH 1" DUCT LINER INCLUDING NECESSARY GLUE ‘AND STICK PINS. GREASE BEARINGS. CHECK AND SIGN BLOWER AND MOTOR SHEAVE/PULLEYS. INSTALL NEW V-BELTS AND SET PROPER TENSION, PERFORM VIBRATION ANALYSIS. RUN. TEST AND CHECK AMPERAGE (OF MOTOR AND OPERATING. ‘CONDITION OF BLOWER ‘ASSEMBLY 7 [800 DESERT VIEW GYMEAST ‘SSDI TOOATOO-BTODAT-OO-TIOT 9.10% | $286.68 K SMALL REPAIRS. SCOPE OF WORK: REMOVE 2 NOISY BLOWER BEARINGS (MAJOR DAMAGE WILL OCCUR IF NOT REPLACED). PREPARE EXISTING SHAFT FOR INSTALLATION OF NEW. BEARINGS. INSTALLATION OF 2 NEW BEARINGS, GREASE BEARINGS. CHECK AND ALIGN BLOWER AND MOTOR SHEAVES/PULLEYS. INSTALL NEW V-BELTS AND CHECK TENSION. REMOVE AND. REPLACE DETERIORATED ‘SUPPLY AIR FLEX ‘CONNECTOR. PERFORM VIBRATION ANALYSIS. RUN, TEST AND CHECK AMPERAGE (OF MOTOR AND OPERATING CONDITION OF BLOWER L ASSEMBLY, Page 1 of 2 PURCHASE REQUISITION DESERT VIEW GYM WESTINORTH SYSTEM. SCOPE. (OF WORK: REMOVE 2 EXISTING DAMAGED BLOWER BEARINGS. PREPARE EXISTING SHAFT FOR INSTALLATION OF NEW. BEARINGS, INSTALLATION OF 2 NEW BLOWER BEARING (1 QTY 415/16" AND 1 QTY 1-7/16-) GREASE BEARINGS, CHECK ‘AND ALIGN BLOWER AND MOTOR SHEAVEIPULLEYS, INSTALL NEW V-ELETS AND ‘SET PROPER TENSION, PERFORM VIBRATION ‘ANALYSIS, RUNT TEST AND CHEGK AMPERAGE OF MOTOR [AND OPERATING CONDITION. OF BLOWER ASSEMBLY. 7} B00 K DESERT VIEW GYM. EASTILARGE UNIT. SCOPE OF WORK: REMOVE 2 EXISTING DAMAGED BLOWER BEARINGS. PREPARE EXISTING SHAFT FOR INSTALLATION OF NEW. BEARINGS. INSTALLATION OF 2 NEW BLOWER BEARING (ITY 4-15/16" AND 1 OTY 1-7/16), GREASE BEARINGS, CHECK ‘AND ALIGN BLOWER AND MOTOR SHEAVEIPULLEYS. INSTALL NEW V.BELTS AND SET PROPERT TENSION. PERFORM VIBRATION ANALYSIS, RUN TEST AND CHEGK AMPERAGE OF MOTOR [AND OPERATING CONDITION. (OF BLOWER ASSEMBLY. EXCLUSIONS: REPAIR OR REPLACEMENT OF ANY DEVISCE NOT LISTED OR BALANCING OF BLOWER WHEEL IF GOUND NECESSARY UPON BIBRATION ANALYSIS, BIT TOATO STOTT OO TOT 370% ‘SaB8TaE $2867a6 B50 12 00-8700-6720-277-00-7107 340% ‘S220087 fax Tax ROO ATOO RTO AAT-OOTIOT 2.00% $666.88 Ses6 as “Approved: Date Approved: Rejected By: Date Rejected: ‘Subtotal Estimate: Total Tax Estimate: TOTAL Estimate: sitz7440 _ $066.88, ‘$11041.28 ‘Comments \ Reason Rejected: ‘Richard Sanchez requesting PO for work to replace blower bearings at DVHS on east and west of, Gym. Received quotes from Pueblo Mechanical & Controls, Inc. Midstate Mechanical and HACL No Bid, Page 2 of 2

You might also like