You are on page 1of 11

Testing: Unit Testing / User Manual

Module: Production Planning

ENVIRONMENT
SYSTEM

: SAP R/3 ECC 6.0

CLIENT

: 200

UNIT TESTING SCENARIO


SCENARIO NUMBER

: BPML PP - 13

DESCRIPTION

: Bill of Material

PREPARED BY
NAME

: ASJ

DATE

: 01/01/2009

TEAM

: Production Planning

APPROVED & TESTED BY


NAME

: Nanhe Babu (PwC)

DATE

TEAM

: Production Planning

Page 1 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

1. Transaction Code/ Path


Menu Path

Logistics Production Master Data Bill of Materials Bill of Material


Material BOM CS01 Create

T.Code

CS01

2. Input Data
1. Before creating BOM, ensure all materials available in material master of your plant.
2. Bill of material number ( Header ) & Child parts of Header should be entered in material
master with T code MM01 as per plant requirement.
3. For following material we have to create BOM,
- ZFRT ( Finish Product )
- ZSFG ( Semi finished Product ) : Sub Assemblies Or Having raw material as child part.
- ZSRP ( Spare Parts ) : Sub Assemblies Or Having raw material as child part.
NOTE: TO CREATE A RELATION OF MATERIAL BOM MODULE IS USED IN SAP.
IN SAP BOM MASTER IS CREATED & MAINTAINED PLANT WISE.
2.1

Input Screen Name Create BOM: Initial Screen

T code CS01 is used for creation of bill of material.


T code CS02 is given to do the changes in created bill of material.
T code CS03 is given to see the contents of bill of material ( View Facility )
NOTE : AT PLANT LEVEL, AUTHORITY FOR CREATION & CHANGE IS GIVEN TO PLANNING
PERSON & AUTHORITY FOR VIEW FACILITY IS GIVEN TO ALL USERS OF SAP.

Page 2 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

Entries required in initial screen,


- MATERIAL :
Header number to be entered in material filed or can be selected from F4 values.
- Plant :
GROUP BOM can be created without PLANT, with shown facilities group bom concept
is not feasible to control & monitor the document. It is decided, BOM should be created
with PLANT .
- BOM Usage :
It is a mandatory Field, List of usage is given below for reference.
For production purpose usage should be 1. Usage 2 is given for R&D data,
NOTE : In Scenario testing with shown facility it is clear that not possible to control &
monitor R&D data with usage 2, so it is decided that, for manufacturing reference R&D data
will be entered in R&D branch plant .

Page 3 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

- Alternative BOM :
This provision is given to create production version for same header material.
If nothing is entered, by default system is generating alternative 1.
NOTE : If second time bom is open with CS01 system will create alternative
2 for
same Header material.
Steps for creating production versions :
For same header material create different alternative BOMs & create relation of all
alternative BOMs ( Production Version ) in MRP4 view of material master.
-

Change Number : If ECN is released to change the BOM, ECN number to be entered
in change number. After ECN number system will give valid date & next revision level
for BOM.

Description of
the Field
Material
BOM Usage
Plant

Nature of the Field


Mandatory
Mandatory
Mandatory

Once the views are selected, Press on

Value of the Field


Material code
1
Your plant number

Tab

2.2
Input Screen Name Create Material: Overview
Screen 1:

Page 4 of 11

Testing: Unit Testing / User Manual

Description of
the Field
Base Quantity

Nature of
the Field
Mandatory

Module: Production Planning

Value of the Field


1 or as applicable

BOM text

Short text which describes the whole BOM

Alt Text.

This text describes an alternative and a variant

BOM Status
Authorisation
Group

Mandatory

01
Not to be used.

Once the views are selected, Press on

Tab

Page 5 of 11

Testing: Unit Testing / User Manual

Description
of the Field

Nature of
the Field

Item

Module: Production Planning

Value of the Field


Field is given to control item sequence in BOM, presently
10, 20, 30 etc logic is given. In future if required you can
add nine new materials to maintain sequence.
L for manufacture material, K for class used in variant
configuration, D for documents, N for non stocjk items, T
for text items.

ICT

Mandatory

Component

Mandatory

Enter component number.

Quantity

Mandatory

As applicable for that component.

After component entry if you press enter, system will open given below window to enter quantity of
component.

Page 6 of 11

Testing: Unit Testing / User Manual

Description of Nature of
the Field
the Field
Quantity
Mandatory
Fixed Qty.

Module: Production Planning

Value of the Field


as applicable
This indicator shows that the component quantity is always the
same

Operation
Scrap

Scrap that is expected in one operation for the quantity of a


component to be processed

Component
Scrap

Percentage of scrap that occurs during production of the


material if the material is a component

Net ID

This indicator determines whether scrap for the component is


calculated on the basis of the net required quantity (the required
quantity without assembly scrap from the material master
record)

Co-Product

Indicator showing that the item is a co-product

Alternative
Group

Consolidation of alternative items within a BOM. Every material


in the assembly can be included in the alternative item group.
If two materials are to be defined as an alternative, then enter
unique letter for both material.

Priority

Mandatory
for alt item

Enter Position of an item in an alternative item group like 1, 2, 3


etc.

Strategy

Mandatory
for alt item

This value defines how items in an alternative group are


selected for withdrawal postings.
This strategy is ignored in material requirements planning (MRP)
either 1 or 2, Generally enter 2.

Usage Prob.

Mandatory
for alt item

Percentage probability that a material will be used in the


assembly like 30%, 20% etc.

MRP Data

MRP data will be capture from material master, not required in


BOM.

Page 7 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

Select component in BOM view,

Click on icon item


Above basic data already covered above.
Apart from that, if the item is 'Scrap' item or item which forms component in Repair / Conversion
BOM, negative quantity depicts stock is generated when order is confirmed for Header item

Prod. Stor. Location


above negative qty

is location where stock will be increased if keep


setup.

For Rework / Conversion BOM, separate Prod. Stor. Location will be defined for negative qty
marked Components, so that track could be kept for transactions done with these type of
Confirmation.
Basic data:

Page 8 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

Click on Status / Lng Text.

Description of the
Field
Line 1
Line 2
Spares part indicator
Costing Relevancy
Material Provision
Indicator
Bulk Material
Production stork.
location

Supply Area

Nature of the
Field

Value of the Field


Text of up to 40 characters, which forms the first of two
lines of text describing the item
Text of up to 40 characters, which forms the second of
two lines of text describing the item
Enter L to identify items supplied loose.
Controls the extent to which a BOM item, operation, or
sub operation in the routing is included in costing.
This key indicates that the BOM item is subject to
material provision, K for material provided by customer
& L for material provided by vendor.
This indicator defines a BOM item as a bulk material,
which is available directly at the work centre (for
example, washers or grease)
Number of the issue location from which the material is
issued during the production process. Back flush is
posted to this issue location if required
For selection of stor location F4 values provided
The supply area is used for material replenishment
purposes and is situated directly on the shop floor
The supply area is used in KANBAN production control
and in Warehouse Management
Not to be used.

Page 9 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

After completion of all entries, click on save button to save the document.
COPY OPTION :
If BOM is already available in different plant, use COPY FROM icon to transfer / copy BOM
contents in required branch plant.

Page 10 of 11

Testing: Unit Testing / User Manual

Module: Production Planning

Following T Codes are used for viewing different type of reports,


- CS13 : Summarised BOM
- CS11 : Display BOM Level By Level
- CS15 : Where Use Item.
- CS14 : BOM Comparison.
- CS20 : Mass changes.
- CS09 : Display Plant Assignment
- CS08 : Change plant assignment
- CS07 : Create Plant Assignment
- CS05 : Change BOM group.
- MM06 : Flag Material for Deletion.
- MM60 : Material List.
- CS05 : Change BOM group.
- CSMB : Material BOM Browser Initial Screen.
Presently BOM is single document & controlled with single revision number,
In SAP BOM contents get split in different modules & same should be controlled with different
revision level manually. Revision number control will be finalised after ECN tryout and will be
documented in ECN Manual.

Page 11 of 11

You might also like