G.NAGA SUPRAJA
T.K.SWATHI
119X1A0413
119X1A0432
129X5A04C9
AIM:
The main aim of this project is to build a system in which the signaling time at traffic
signaling junction will be controlled according to the availability of ambulance.
PURPOSE:
The purpose of this project is to implement an automated system for clearing the traffic
for ambulances to help the people who met with accidents or the people who are in emergency
conditions without any disturbance or delay.
DESCRIPTION:
According to this project, it employs 3 sections, two are
junctions and the other section placed in Ambulance. The section placed in the ambulance
contains 5 switches for the operations Emergency, Normal, out, direction 1 and direction 2.
So according to this project, whenever the ambulance is yet to reach a traffic signal
junction, the concerned person need to press the switches like Emergency / Normal priority and
direction 1 / 2 informing the direction and priority of ambulance reaching the signal junction.
The other section placed at traffic signal receives the information and takes the control action
according to the priority.
The communication between the sections is done using Zigbee technology. Each and
every section is designed around a microcontroller as a control unit. The Zigbee module is
interfaced to microcontroller.
BLOCK DIAGRAM:
TRAFFIC SIGNAL SECTION:
POWER
SUPPLY
ZIGBEE
TRANSCEIVER
MICRO
CONTROLLER
TRAFFIC
SIGNAL
LIGHTS
LCD
AMBULANCE SECTION:
POWER SUPPLY
KEYPAD
SOFTWARES:
1. Embedded C
2. Keil IDE
MICRO
CONTROLLER
ZIGBEE
TRANCEIVER
3. Uc-Flash
HARDWARE USED:
AMBULANCE SECTION:
1. Micro Controller
2. Keypad
3. Zigbee transceiver
4. Power Supply
TRAFFIC SIGNAL SECTION:
1. Traffic Signal Lights
2. Micro Controller
3. Zigbee transceiver
4. Power Supply
5. LCD
APPLICATIONS:
1. Used for ambulance service systems.
2. Used for 108 services.
(B.Bhargavi)
(G.Naga Supraja)
(T.K.Swathi)