You are on page 1of 2

THE SHIPPING CORPORATION OF INDIA LTD

LPG/C.ANNAPURNA

DATE

INERT GAS PLANT LOG FOR THE MONTH OF NOVEMBER 2014

AT SEA

15
NOV

TIME
POSN.
PANEL
52

STARTED

1115Hr

STOPPED
INERT GAS GENERATOR
GENERATION MODE ( IG / DRY AIR )
AIR INLET PRESSURE TO BURNER

1930Hr

IG
0.38

(BAR)
FUEL OIL PRESSURE TO BURNER
(BAR)
FUEL OIL REGULATOR(INJECTION) POSI.
FUEL OIL PUMP PRESSURE

11
8/7
18

PANEL

(BAR)
DECK SUPPLY PRESSURE

160

147

(mBAR)
CONTROL AIR PRESSURE

7.0

145
78

(BAR)
AIR INLET PRESS. TO PILOT BURNER (BAR)
S/W INLET PRES.TO SCRUBBER

1.7
1.47

10
8/9
27

81
304
276

(BAR)
S/W INLET TEMP.TO SCRUBBER
S/W OUTLET TEMP.FROM SCRUBBER
AIR OUTLET TEMP.FROM SCRUBBER.

747

COMPRESSOR SUCTION PRESSURE

759
748

(BAR)
COMPRESSOR SUCTION TEMP.
COMPRESSOR DISCH. PRESSURE

( 0C)

-14
15.5

758
749

(BAR)
COMPRESSOR DISCH. TEMP.
COMPRESSOR L.O. PRESSURE

( 0C)

42
4.6

755

(BAR)
PRE COOLER PRESSURE

4.5

755

(BAR)
PRE COOLER TEMP.

-4

902

( C)
KNOCK OUT DRUM PRESSURE

(0C)
(0C)
(oC)

30
42
34
3.5

728
DRIER
PANEL
729
901

(BAR)
KNOCK OUT DRUM TEMP.
DRIER IN USE (FWD / AFT)
DRIER OUTLET PRESSURE
(BAR)
DRIER OUTLET TEMPERATURE

( C)
I.G. BLOWER.
PANEL BLOWER IN USE (PORT / STBD)
PANEL CURRENT - AMPERE

0.11
( 0C)

9
FWD
0.04
30

(AMPS)
OXYGEN ANALYSER
OXYGEN PERCENTAGE
%

STBD
96

3.5

DUTY ENGINEER
Signature

You might also like