Professional Documents
Culture Documents
Road SSR 2010
Road SSR 2010
PART-II
SCHEDULE OF RATES
FOR
ROAD & BRIDGE WORKS
FOR THE YEAR 2010-11
(Effective from 1st June, 2010)
dt: 16 -7-2010.
Sub:- Schedule of Rates as per Revised Standard Data for the year 2010-11
Road & Bridge works -(part-2) - approved- Printing & Communication of
SoRs Reg.,
Ref:- 1. G.O.Ms.No.49, I & CAD (PW: Reforms) Dept., dt:.2-3-2009.
2. E-in-C (PR) Lr.No.T6/DyEE(T)/SSR/2010-11, dated.28-5-10 & 15-6-10.
3. Commissioner, labour department Lr.No:N1/2723/2010, dt: 05- 05-10.
4. Minutes of B.O.CEs meeting for Schedule of Rates held on dt.29-52010&22-6-10.
-o0oThe Government have approved Revised Standard Data vide ref 1st cited. The
Schedule of Rates part-2( for Road & Bridge works) as per A.P. Revised Standard Data
for the year 2010-11 is approved based on the following.
The Engineer-in-Chief, Panchayath Raj Department has furnished draft rates for
their works for adopting A.P. Revised Standard data (Part-2) vide ref 2nd cited.
The labour rates are obtained from the Commissioner, labour department vide
reference 3rd cited for finalizing the rates for SoR 2010-11.
Based on the proposals, the draft Schedule of Rates-part-2 (i.e., Road & Bridge
works) for the year 2010-11 were reviewed and finalized in the annual Board of Chief
Engineers meetings held on 29-5-2010 & 22-6-2010.
The
detailed calculations are incorporated in the Lead &Lift charges chapter in the I&CAD
works (Part-1) of A.P. Revised standard data.
The approved basic rates are applicable
Standard data approved by the Government vide G.O. 1st cited. The Government
approval is necessary to adopt any other data i.e., MoRT&H data for adopting the Road
& Bridge works(Part-2) basic rates as per the decision taken in Board of Chief Engineers
meeting.
One hard copy & compact disc containing Schedule of Rates -Part-2 are here
with communicated. No other items other than the items communicated by this Office
shall be introduced in the SoR-part-2.
The Heads of Department and Officers mentioned below are authorized to print
the Schedule of Rates (Part-2, i.e., Road &Bridge works) for the year 2010-11. The
unauthorized printing & selling of the SoR is strictly prohibited. The Schedule of Rates
for 2010-11 will be in force until the new SoR comes in to force.
Any discrepancies / corrections required for SoR part-2 may be brought to the
notice of undersigned for issuing corrections.
The revised rates will come into force from 1st June of 2010.
The receipt of the proceedings may be acknowledged.
Encl: CD containing SoR-part-2.
Sd/-M.K. Rahaman, 16-7-2010
Engineer-in-Chief (I.W.)
Chairman, BOCE(SoR)
I) Copy Communicated to the following Heads of Departments along with Enclosures for
information.
1) Engineer-in-Chief (Admn & NH)., Roads & Buildings Department.
2) Engineer-in-Chief (P.H.), Public Health Department.
3) Engineer-in-Chief (P.R.), Panchayath Raj Department.
4) Engineer-in-Chief (RWS) R W S, Department.
5) Chief Engineer (Buildings), R&B Department.
6) Copy of C.D containing Schedule of Rates 2010-11 -part-2 to all Engineers-in-Chief,
Chief Engineers of Irrigation & CAD Department for favour of information.
II) Copy to The Superintending Engineer, Irrigation Circle, I&CAD Department,
Red Hills, Hyderabad for necessary action.
Sd/-M.K. Rahaman, 16-7-2010
Engineer-In-Chief (IW)
Chairman, B.O.C.E (SoR)
INDEX
PART-II
ROAD & BRIDGE WORKS
Sl.
No.
Description
Page No.
From
To
Preamble
Labour Rates
12
13
21
22
26
27
31
Preamble
PREAMBLE
Preamble
PREAMBLE
Greater
Visakhapatnam
and
except Greater
Vijayawada
municipal
Greater
Visakhapatnam
and
Vijayawada
Municipal
Preamble
C) INDUSTRIAL AREA:
a. 20% over basic rates on labour component works allowed for works
situated within 10 Kms belt of Industrial area of, Jeedimetla,
Lingampally, Ibrahimpatnam, Tandur in Ranga Reddy District,
Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla,
Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram
District,
Kothur
in
Mahabubnagar
District,
Patancheru,
Preamble
2. The extra percentage under Agency / Tribal areas allowance may
be allowed on the labour component and on the labour charges in
the rates for conveyance of materials.
2.0
WATER LEADS:
b) Masonry
c) Plastering
Preamble
Note:- For Water leads of over 2 KMs, specific approval of Chief
Engineer concerned is necessary.
3.0
EXCAVATION OF TRIAL TRENCHES, TRIAL PITS AND
EXCAVATION IN RESTRICTED PLACES: I)
25% extra
B. TRIAL PITS:
II)
1) Up to 2 Metres depth
25% extra
50% extra
75% extra
100% extra
150% extra
200% extra
75% extra
75% extra
120% extra
120% extra
75% extra
75% extra
50% extra
Preamble
Note: 1) The extra percentage is allowed over S. S. 20 B rate for corresponding
soil. It includes the charges for all lifts and initial lead but does not
include dewatering charges if any in respect of all the items under ( A)
and (B) above.
4.0
30% of the skilled labour provided in the data may be taken as 1st Class
and the remaining 70% as 2nd Class.
5.0
III)
IV)
For the labour for the Rock Toe shall be taken as 2/3rd
of the labour charges of revetment as Chief Engineer,
Circular No. P3/ OT2/ T3/ 65167/78, Dt: 19.03.1980.
II)
- 9% extra
III)
- 12% extra
IV)
- 15% extra
V)
- 20% extra
Preamble
VI)
Beyond 30 m excavation
- 40% extra
8.0
-----
Rs.
Rs.
1.75per Km/ MT
1.50 per Km/ MT (round the trip)
SEIGNIORAGE CHARGES:
Seigniorage charges for materials as fixed by the Government in
adopted as per Road & Bridge works (Part-2) of A.P. Revised Standard data.
Labour rates
LABOUR RATES
Labour rates
LABOUR RATES
Sl.
No.
S.S.
Item
No.
Description
Unit
(per)
SoRate
for
201011
5
(A)
SKILLED WORKMEN
First Class
1
Day
258.00
Brick Layer
Day
258.00
Carpenter
Day
258.00
Painter
Day
258.00
Plumber
Day
258.00
Welder
Day
258.00
Fitter
Day
258.00
Electrician
Day
258.00
Cook
Day
237.00
10
Mechanic
Day
258.00
11
Rigger
Day
258.00
12
Rigger Syrang
Day
258.00
13
Well Sinker
Day
258.00
14
Blaster
Day
258.00
15
16
Day
Day
277.00
257.00
17
Day
224.00
18
Day
258.00
Day
Day
277.00
257.00
Day
224.00
Day
277.00
23
Tractor Driver
Day
257.00
24
Tractor Driver
Day
224.00
Pan Mixer
Day
258.00
26
Concrete mixer
Day
258.00
27
Vibrator
Day
258.00
19
20
21
22
( 7.5 T to 12 T)
upto 7.5 T
Operator
25
10
Labour rates
Compressor
4
Day
SoRate
for
201011
5
258.00
29
Jack Hammer
Day
258.00
30
Driller
Day
258.00
31
Boring Maisthry
Day
258.00
Sl.
No.
1
28
S.S.
Item
No.
Description
Unit
(per)
32
11
Pump Operator
Day
258.00
33
34
35
12
13
14
Turner Grade-I
Wireless Operator
Assistant Wireless Operator
Day
Day
Day
258.00
288.00
237.00
36
37
15
16
Jeep Driver
Work inspector with I.T.I qualification
Day
Day
250.00
288.00
38
39
17
18
Day
Day
350.00
400.00
40
19
Day
250.00
41
20
Day
258.00
42
21a(i)
a(ii)
b
Day
Day
Day
288.00
300.00
350.00
SEMI-SKILLED WORKMEN
SECOND CLASS
43
Mason
Day
237.00
44
Day
237.00
45
46
47
48
c
d
e
f
Carpenter
Painter
Plumber
Blacksmith
Day
Day
Day
Day
237.00
237.00
237.00
237.00
49
50
g
h
Welder
Fitter
Day
Day
237.00
237.00
51
Electrician
Day
237.00
52
Caulker
Day
237.00
53
Barbender
Day
237.00
54
Tinker
Day
237.00
55
Sawyer
Day
237.00
10
Labour rates
Sl.
No.
S.S.
Item
No.
1
56
2
6
Brick-Moulder
4
Day
SoRate
for
201011
5
237.00
57
Pot-tile turner
Day
237.00
58
Day
237.00
59
Day
237.00
60
10
Telephone Operator
Day
288.00
61
11
Hand Driller
Day
237.00
62
12
Quarry man
Day
237.00
63
13
Hammer man
Day
237.00
64
14
Thatcher
Day
237.00
65
15
Fireman
Day
237.00
66
16
Cleaner/Helper
Day
237.00
67
17
Stone Packer
Day
237.00
68
18
Jawali
Day
237.00
69
19
Day
196.00
70
20
Ratton worker
Day
237.00
71
21
Mate
Day
237.00
Description
3
(C)
Unit
(per)
UNSKILLED WORKMEN
72
Head mazdoor(Mukaddar)
Day
196.00
73
Man mazdoor
Day
196.00
74
Watch man
Day
196.00
75
Picottah man
Day
Deleted
76
Woman Mazdoor
Day
196.00
77
78
6(a)
6(b)
Day
Day
Deleted
196.00
79
NOTE: Whenever unskilled workmen are engaged for cleaning of Sewers & Septic
Tanks, they may be paid double of the above wages.
(D)
80
Day
256.00
81
Day
277.00
82
Day
266.00
83
Day
317.40
84
Day
Deleted
11
Labour rates
Sl.
No.
S.S.
Item
No.
1
85
2
6
4
Day
SoRate
for
201011
5
241.00
86
Punt thundal
Day
207.00
87
Punt lascar
Day
207.00
88
Day
Deleted
Description
3
Unit
(per)
Note: 1)The wage should not be less than the minimum wages of schedule of
employment, subject to out turn.
2)25% extra over the corresponding labour rates in respect of the work to be
done during night time subject to issue of certificate accordingly by the
concerned estimate sanctioning authority for providing in the data and by
concerned Executive Engineer in charge of the work for payment. The night
time allowance is applicable only to the works done under Greater Hyderabad
Municipal Corporation, Greater Visakhapatnam Municipal Corporation and
Vijayawada Municipal Corporation limits only.
12
13
SoRate
for 201011
1 cum
133.00
1 cum
71.00
1 cum
95.00
1
1
1
1
1
1
114.00
156.00
98
114
117
136
Sl.
No.
S.S.
Item
No.
22.a
b.I
3
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING
WEDGING, BREAKING, BURNING, SPLITING
AND STACKING
For R.R Masonary Work (other than Granite,
Dolomite and Trap)
For SS Revetment work 225 mm
b.ii
4
5
6
7
8
9
b.iii
C
d I.
d II.
d.iii
d.iv
10
11
12
E
F
G
13
Description
cum
cum
cum
cum
cum
cum
1 cum
1 cum
1 cum
114
210
155
1 cum
67
1 cum
1 cum
1 cum
218
152
1409
1 cum
69
each
each
25
30
each
each
each
each
57.50
86.00
57.50
5.30
each
7.00
COURSED
RUBBLE
STONE
QUARRYING
WEDGING,
BREAKING,
BURNING
AND
SPLITTING INCLUDING STACKING FOR SS
FIRST SORT WORKS
14
15
16
23.a
B
27
17
18
19
28
B
20
21
22
23
31
32.a
B
C
24
14
Sl.
No.
S.S.
Item
No.
Description
Unit
(per)
SoRate
for 201011
33.a
- do -
6mm
size (SS 5)
1 cum
428
26
- do -
10mm
size (SS 5)
1 cum
560
27
- do -
1 cum
688
28
- do - 20mm
1 cum
844
29
- do -
25mm
size (SS 5)
1 cum
828
30
- do -
40mm
size (SS 5)
1 cum
500
31
32
33
34
35
36
g
h
I
j
k
1
1
1
1
1
390
360
325
260
210
70
37
38
39
12mm
size (SS 5)
size (SS 5)
- do - 50mm
size (SS 5)
- do - 60mm
size (SS 5)
- do - 65mm
size (SS 5)
- do - 75mm
size (SS 5)
- do - 75 to 100mm size (SS 5)
NOTE:- (1) Add extra Rs. /- per cum for items 33
(a) to 33 (k) if the metal is obtained by blasting
(2) Add 25% extra per cum if the metal is obtained
by machine crushing excluding cost of blasting.
(3) Deduct Rs. /- per cum if the metal or rubble is
obtained from surface stone and boulders.
(4) Add Rs. /- per cum for selection of stones and
boulders from excavated spoil dumps for items 33 a
to 33 k, when this addition of Rs. /- per Cum is
allowed, deduction of Rs. /- per Cum mentioned
under Note (3) above should invariably be made.
cum
cum
cum
cum
cum
25%
9
15
33.l
33.m
33.n
33.o
33.p
45
33a
- do 40 mm size ( SS 5 )
- do 50 mm size ( SS 5 )
- do 60 mm size ( SS 5 )
- do 65 mm size ( SS 5 )
- do 75 mm size ( SS 5 )
HARD BROKEN STONE OF GRANITE TRAP
DOLERITE AND DOLAMITE FREE FROM DUST
OBTAINED
BY
QUARRYING
WEDGING,
BREAKING,
BURNING
AND
SPLITTING
INCLUDING STACKING
(QUARTZITE AND
BASALT WITH AGGREGATE IMPACT OF LESS
THAN 20)
-do- 2.36 to 5 mm size (IRC&MORTH)
15
1
1
1
1
1
Cum
Cum
Cum
Cum
Cum
105
95
75
67
63
1 cum
260
Sl.
No.
S.S.
Item
No.
1
46
47
48
49
50
51
52
53
54
55
56
2
b
c
d
e
f
g
h
i
j
k
1
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
33.q
r
S
T
U
V
33.w
X
Y
33.z1
Description
3
-do- 5 to 7mm size (IRC&MORTH)
-do- 9.5 to 11.2mm size (IRC&MORTH)
-do- 12mm to 14 mm size ( IRC and MORTH )
-do- 19 mm to 22 mm size ( IRC and MORTH )
-do- 25 mm to 27 mm size ( IRC and MORTH )
-do- 40 mm to 45 mm size ( IRC and MORTH )
-do- 50 mm to 55 mm size ( IRC and MORTH )
-do- 60 mm to 63 mm size ( IRC and MORTH )
-do- 65 mm size ( IRC and MORTH )
-do- 75 mm size ( IRC and MORTH )
NOTE:- Add extra Rs. /- per cum for items 33 (a)
to 33 (j) if the metal is obtained by blasting
Add 25% extra per cum if the metal is obtained by
machine crushing excluding cost of blasting.
Deduct Rs.
/- per cum if the metal or rubble is
obtained from surface stones and boulders
Add Rs.
/- per cum for selection of stones and
boulders from excavated soil dumps for items 33 (a)
to 33 (k), when this addition of Rs.
/- per cum
allowed deduction of Rs.
/- per cum mentioned
under note (3) above should invariably be made
HARD BROKEN STONE OTHER THAN GRANITE
SUCH AS QUARTZ, QUARTZ-NAPA AND BASALT
SCREENED AND FREE FROM DUST INCLUDING
STACKING
- do - 10 mm size (SS 5)
-do- 9.5 mm to 11.2 mm size ( IRC and MORTH )
- do - 12 mm size (SS 5)
-do- 12mm to 14 mm size ( IRC and MORTH )
- do - 20 mm size (SS 5)
-do- 19 mm to 22 mm size ( IRC and MORTH )
- do - 25 mm size (SS 5)
- do - 40 mm size (SS 5)
-do- 40 mm to 45 mm size ( IRC and MORTH )
- do - 50 mm size (SS 5)
-do- 50 mm to 55 mm size ( IRC and MORTH )
- do - 65 mm size (SS 5)
-do- 60 mm to 65 mm size ( IRC and MORTH )
- do - 75 mm size (SS 5)
- do - 75 mm size ( IRC &MORTH)
- do - 75 to 100 mm size (SS 5)
- do - 75 to 100 mm ( IRC& MORTH)
OTHER ITEMS INCLUDING STACKING
Laterite 40 to 75 mm ( ring)
16
Unit
(per)
SoRate
for 201011
4
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
5
430
560
690
950
830
500
390
360
325
260
70
1 cum
25%
1 cum
1 cum
15
9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
331
331
310
310
251
251
247
146
146
129
129
122
122
101
101
80
80
1 Cum
87.5
1
1
1
1
1
1
1
1
1
1
1
Unit
(per)
SoRate
for 201011
4
1 Cum
1 Cum
5
65.5
82
1 Cum
70
1 Cum
57.5
1
1
1
1
1
1
1
Cum
Cum
Cum
Cum
Cum
Cum
Cum
35
47.5
37.5
42
37.5
31
22.5
15
9
90
3
kankar, hard broken kankar 40 to 75 mm ( ring )
Soling stone of 150 mm size of granite, trap and
Dolamite varieties.
NOTE:- (1) Add extra for items to 33(z3) Rs /- Per
cum, wherever quarrying is done by blasting. (2)
Wherever controlled blasting is resorted to the Chief
Engineer concerned shall approve the observed data
in support of SS item No. 22 a to 22 c , 22g, 23
z4
Soling stone of 150 mm size other than granite
variety
z5
Soling Stone laterite, Kankar 150mm, surface stone
z6
Field picked metal unbroken 20 mm size
z7
- do - 25 mm size
z8
- do - 40 mm size
z9
- do - 50 mm size
z10
- do - 60 mm size
z11
- do - 80 mm size
NOTE:- Add Rs. /- Per Cum for selection of stone and
boulders from excavated spoil dumps for items 33 (Q) TO
33 Z , when this addition of Rs. /- per Cum is allowed,
deduction of Rs. /- per Cum should invariably be made
towards the metal or rubble if it is obtained from surface
stone and boulders.
34
Gravel including stacking
1 Cum
50.5
91
35 a
Quarry rubbish
1 Cum
50.5
92
1 Cum
236
93
36.a
1 Cum
220
94
1 Cum
70
95
37
1 Cum
28
96
40 to
41(c
)
42
1 MT
The monthly
rates will be
communicated
by Govt.
Sl.
No.
S.S.
Item
No.
1
78
79
2
z2
z3
80
81
82
83
84
85
86
87
88
89
97
Description
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable
to the District. 3) Least of the (1) and (2 ) above may be allowed 4) The price
of cement will be reviewed and fixed on monthly basis and rates will be
communicated separately.
17
Sl.
No.
S.S.
Item
No.
1
98
99
2
C
D
3
Grinding lime mortar or Surkhi mortar
Shell lime slaked and screened
100
White cement
101
102
Description
Unit
(per)
SoRate
for 201011
4
1 Cum
1 Cum
5
78
780
1 Kg.
25
(D) MORTARS
43 to
45
Items 43 to 45
Rates
have
to
be
worked out based on
MORT&H data.
106
107
1 MT
1 MT
1 MT
1 MT
1 MT
The monthly
rates will be
communicated
by Govt.
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates
applicable to the District. 3) Least of the (1) and (2 ) above may allowed
4) The prices of steel will be reviewed and fixed on monthly basis and
rates will be communicated separately.
III RATES OF WORKS
(A) CLEARING SITE
108
109
110
111
1.a
B
C
D
112
2.a.I
113
114
Ii
2.b.I
115
116
Ii
2.c.I
117
118
Ii
d.I
119
120
Ii
eI
121
122
Ii
iii
18
1
1
1
1
Sqm
Sqm
Sqm
Sqm
2.20
2.00
2.00
3.30
Each
27.00
Each
Each
42.50
30.00
Each
Each
46.00
18.00
Each
Each
28.00
18.00
Each
Each
24.00
24.00
Each
Each
38.00
62.00
Sl.
No.
S.S.
Item
No.
1
123
2
f.I
124
125
126
127
Ii
iii
3.a
B
128
129
4.a
130
131
132
133
134
135
b.I
b.ii
c.I
c.ii
c.iii
D
Description
3
Uprooting and removing stumps of other kind of
trees including stacking of girth 30 to 100 cm.
- do - 100 to 200 cm
- do - above 200 cm
Uprooting and clearing prickly pear jungle
- do - under 2.5 meters height including burning
and burrying as directed.
- do - over 2.5 meters height including burning and
burrying with an initital lead of conveyance
Removing of natchu, goobi, thooti etc., from drains,
channels including clearance if not more than 1
metre depth of water with an initial lead of 10
metresand lift of 2 metres.
Clearing alchi, tilla
Removal of Jammu
Removal of imponea, cornea
Removal of water hyacinth upto 30 cm thick.
- do - more than 30 cm thick
Removal of natchu, goobi, thooti etc., for every
extra lead or lift over the initial lead or lift.
Unit
(per)
SoRate
for 201011
4
Each
5
18.00
Each
Each
1 Sqm
1 Sqm
26.00
35.50
1.90
2.40
1 Sqm
2.90
1 Sqm
1.50
1 Sq.m
1 Sq.m
1 Sq.m
1 Sqm
1 Sq.m
1 Sqm
2.90
2.50
2.90
3.00
4.10
1.00
1 cum
50.00
1 RM
1 RM
1 RM
97.00
105.00
120.00
1 RM
1 RM
1 RM
110.00
121.00
133.00
1 RM
1 RM
1 RM
71.00
89.00
109.50
(B) DISMANTLING
5
136
n.(i)
7
DISMANTLING,
CLEARING
AWAY
AND
CAREFULLY STACKING MATERIALS USEFUL
FOR REUSE.
Dry rough stone revetment for aprons and stacking
within 40 metres
Drilling holes in hard granite or sheet rock
a)
I)
ii)
iii)
b)
Manually ( Hand)
20 mm dia meter
25 mm dia meter
36 mm dia meter
Pneumatic Compressor
141
142
143
I)
ii)
iii)
8
144
145
146
I)
ii)
iii)
20 mm dia meter
25 mm dia meter
36 mm dia meter
Grouting the holes with neat cement slurry
excluding cost of steel
20 mm dia meter
25 mm dia meter
36 mm dia meter
137
138
139
140
19
Sl.
No.
S.S.
Item
No.
1
147
2
AI
148
149
150
BI
B2
C1
Description
3
White washing and colour banding for guard and
guide stones including cost of materials
Screening sand and gravel
Screening chips and metal
Removing and refixing Hectometre or Demarcation
stones
(S ) ROAD WORK ITEMS
Unit
(per)
4
each
1 cum
1 cum
each
SoRate
for 201011
5
6.50
6.30
13.00
9.50
1 (I )
151
152
153
154
155
A
B
C
D
1 (ii )
40 mm thickness
50 mm thickness
75 mm thickness
100 mm thickness
(For compact thickness of soft metal)
10
10
10
10
sqm
sqm
sqm
sqm
57.20
60.50
66.00
71.50
156
157
158
A
B
C
5
50 mm thickness
75 mm thickness
100 mm thickness
10 sqm
10 sqm
10 sqm
44.00
52.80
57.20
159
5 (a)
40 mm thick ness
10 sqm
150.70
160
(b)
50 mm thick ness
10 sqm
170.50
161
(c )
75 mm thick ness
10 sqm
187.00
162
(d )
10 sqm
203.50
163
(e)
10 sqm
363.00
20
Sl.
No.
1
164
S.S.
Item
No.
2
165
166
167
168
169
170
171
172
Description
3
Gelatin(For MORTH data, for works of state &
national high ways only)
Electric Detonators(For MORTH data, for works of
state & national high ways only)
Hot applied thermoplastic compound(For MORTH
data, for works of state & national high ways only)
Reflectionising glass beads of 2 mm thick(For
MORTH data, for works of state & national high
ways only)
Road marking paint confirming to IS 164(For
MORTH data, for works of state & national high
ways only)
Labour charges for laying filters with coarse
aggregate.
Labour charges for laying filter with sand.
New Items.
Fly Ash
Binding wire
21
Unit
(per)
SoRate
for 201011
4
Per Kg
5
60.00
each
3.00
Per Litre
200.00
Per Kg
65.00
Per Kg
160.00
1 cum
45.00
1 cum
25.00
1 cum
1 Kg.
Deleted
52.00
Conveyance Charges
CONVEYANCE CHARGES
OF
MATERIALS
22
Conveyance Charges
CONVEYANCE CHARGES OF MATERIALS AS PER SoR 2010-11
(COMMON TO ALL DEPARTMENTS).
LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS
FOR THE YEAR: 2010-11
1. For total lead up to 150 m (including initial lead ) lead charges by head load only shall
be adopted irrespective of mode of conveyance.
2. For total lead exceeding 150 m conveyance by mechanical means only shall be
adopted irrespective of mode of conveyance.
3. The rates for loading at quarry including idle hire charges of trucks and hire charges
per for each kilometer and up to 5 km are cumulative and inclusive of total charges for
preceding lead.
4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and
Stones are for loose volume and not for compacted or in-situ volume.
5. The rates for lift charges, lead charges, hire charges are cumulative and inclusive of
rates for preceding lift, lead and hire charges.
6. Lift charges are not payable where conveyance of materials is by mechanical means to
final placing point.
7. Loading and unloading charges are not payable for conveyance by head load.
8. Loading charges are not payable for conveyance by mechanical means for disposal of
excavated materials beyond initial lead of 50 m wherever specified.
9. Loading and unloading charges are not payable for conveyance by mechanical means
for disposal of excavated materials beyond initial lead of 1 km wherever specified.
10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate,
rubble, size stone and cut stone are inclusive of stacking.
11. Hire charges are per 1KM for tippers and trucks for transport of materials from work
site to dump yard and other places are cumulative& includes previous km up to 5 kms
12. For detailed calculations, refer to the Lead & Lift charges (Common to all
Departments) chapter of Irrigation & CAD works (Part-1), A.P. Revised Standard
data. The lead & lift charges are inclusive of 14% Contractors profit and Overhead
charges.
23
Conveyance Charges
A. (LEAD) CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD
FOR THE YEAR: 2010-11
Earth / Sand
PCC slab/
/Gravel / Murrum/ Cement /
Shahbad slab /
Total distance
Lime/ Surki/ Size ReinforceSl
CC block/ BS
( Total lead includes
stone / Cut stone
ment steel
No.
slab/ Late-rite /
initial lead )
Rubble / Coarse
Str steel
Wood Rs /
aggregate
Rs / tonne
cum
Rs/Cum
1
2
3
4
5
Total lead up to 50 m
1 (covered by item rate)
initial lead
initial lead
initial lead
2 Total lead up to 100 m
31.90
18.60
40.60
3 Total lead up to 150 m
63.80
37.20
81.30
Notes: 1. No loading or unloading charges are admissible for conveyance by head load.
2. For total lead exceeding 150 m conveyance charges by mechanical means only
shall be adopted irrespective of mode of conveyance.
3.The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges
B.( LEAD) CONVEYANCE CHARGES FOR MACHINERY PER KILOMETER
FOR TRANSPORTING MATERIALS BY TIPPERS AND TRUCKS
EXCLUDING LOADING, UNLOADING AND IDLE HIRE CHARGES OF
MACHINERY FOR THE YEAR: 2010-11
( No loading and unloading charges allowed for machinery loading and unloading )
(Lead)
(Lead)
(Lead)
(Lead)
charges
charges for
charges for charges for
(Lead) charges
for
trucks and
trucks and trucks and
for trucks and
trucks
tippers per
tippers for tippers for
tippers for
and
cu.meter for
Rubble/Size
Earth /
Cement/ Steel/
Sl
tippers
PCC slabs/
stones/ Cut
Distance
Sand
RCC poles/
No.
per
Shahabad
Stones/
/Gravel /
AC & GI
cu.meter
slabs/ CC &
Coarse
Murrum/
sheets/ Packed
water/
Laterite
aggregate
Lime/
materials/tonne
1000
blocks/
per
Surki/ per
litres
Wood/ cum
cu.meter
cu.meter
1
2
3
4
5
6
7
1 Lead up to 1 km
21.50
19.10
11.90
28.00
11.90
2 Lead up to 2 km
30.20
26.70
16.70
39.20
16.70
3 Lead up to 3 km
40.20
40.20
25.10
59.10
22.20
4 Lead up to 4 km
48.80
48.80
30.50
71.80
27.00
5 Lead up to 5 km
57.40
57.40
35.90
84.50
31.80
for Every km beyond 5 km
6 up to 30 km
8.60
8.60
5.40
12.70
4.80
7 for Every km beyond 30 km
7.20
7.20
4.50
10.60
4.00
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges
24
Conveyance Charges
C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS
( idle hire charges of trucks are not added)
Earth /
Rubble/
Sand
size stone/
brick
/Gravel
cut stone/
Description of
cement in steel in
work
Sl No.
Murrum/ Coarse
item
Rs/tonne Rs./tonne Rs/1000
/ Surki/
aggregate,
No
Lime in
Rs / cum Rs/cum
1
2
3
4
5
6
7
1 Loading
10.60
21.10
34.90
41.80
29.00
2 Unloading
5.30
10.55
34.90
41.80
29.00
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges
D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS
(including idle hire charges of trucks )
Sl No.
Description of
item
2
1 Loading
2 Unloading
Earth /
Sand
/Gravel
Murrum/
/ Surki/
Rs / cum
3
68.30
24.50
Rubble/
size stone/
cut stone/
Coarse
aggregate,
Lime in
Rs/cum
4
78.90
39.45
cement in
Rs/tonne
steel in
Rs./tonne
brick
work
Rs/1000
No
5
98.60
98.60
6
105.60
105.60
7
134.10
134.10
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges.
E.LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS
(including idle hire charges of trucks)
Earth /
Rubble/
Sand
size stone/
/Gravel
cut stone/
Description of
Sl No.
Murrum/ Coarse
item
/ Surki/
aggregate,
Lime in
Rs / cum Rs/cum
1
2
3
4
1 Loading
34.30
68.30
2 Unloading
10.90
10.90
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges
25
Conveyance Charges
F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD
Sl
No.
Total lift
( Total lift includes
initial lift )
2
Total lift up to 3 m
(covered by item
1 rate)
For Every 1.00 Lift
beyond initial lift of
2 3 meters
Earth / Sand
/Gravel
Murrum/ Lime/
Surki/
Size stone / Cut
stone
Rubble / Coarse
aggregate
Rs / cum
3
Initial lift
3.70
PCC slab/
Cement /
Shahbad
Reinforce- slab / CC
ment steel block/ BS
Str steel
slab / Laterite
Rs / tonne / Wood
Rs / cum
4
Initial lift
2.70
Initial lift
5.00
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges
26
Hire Charges
HIRE CHARGES OF
PLANT AND MACHINERY
FOR ROAD & BRIDGE WORKS
27
Hire Charges
Sl.
No.
1
1
Machine
2
Dozer( D 80 )
Mortor Grader
Hydraulic Excavator
Activity
3
Spreading
Cutting
Cleaning
Clearing
Spreading
GSB
WMM
Soil Ordinary
Soil Marshy
Soil unsuitable
Soil loading
Aggregate loading
Transportation of soil,
GSB,WMM, Hot mix etc
Earth/Soil, GSB,
WMM
7
8
Tractor
Pulling
10
Scarifying
11
Scarifying
12
Air Compressor
General purpose
13
Wet mix
14
Surface cleaning
15
28
Unit
SoRate
for
201011
( Rupees)
4
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
tonne
Km
Per Km
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
1729.90
2600
1808.50
1320
629.80
4.5
45
1704.60
746.50
345
345
345
345
370
1320
290
940
Hire Charges
Description
Sl.
No.
1
16
17
18
19
20
Machine
2
Emulsion Pressure
Distributor
Hot mix Plant 120 TPH
capacity
Hot mix Plant 100 TPH
capacity
Hot mix Plant 60 TPH
capacity
Hot mix Plant 40 to 60
TPH capacity
Activity
3
Applying emulsion tack
coat
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
DBM/BM/SDC
/Premix
22
23
21
Unit
SoRate
for
201011
( Rupees)
4
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
5
690
23000
19550
17250
15525
Per
Hour
2530
Per
Hour
1090
Surface dressing
24
25
26
Repair of pot-holes
27
Bitumen Spraying
28
Producing GSB
29
Mastic Cooker
30
Concrete mixing
31
Transit mixer
32
Transportation of concrete
mix
Pumping of Concrete
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
33
Cranes
(a) 80 tonnes
(b) 35 tonnes
(c) 3 tonnes
(d)Crane with grab bucket
0.75 cum
Concrete mixing
Lifting purpose
Per
Hour
Well foundation
Per
Hour
29
2070
1320
1035
750
170
920
52
2130
1670
1336.80
630
950
630
280
1725
Hire Charges
Description
Sl.
No.
Machine
2
(e)Crane with grab bucket 1
cum
Activity
3
Well foundation
34
Concrete bucket
35
Kerb making
36
37
38
39
Concrete mixer
Concrete mixing
(a)0.28 cum
(b) 1.0 cum
Concrete mixing
40
41
Unit
( Rupees)
4
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Per
Hour
Generation of electric
energy
per
hour
per
hour
per
hour
per
hour
Per
K.m.
Per
Km.
Per
tonne
per km
Per
Hour
Per
Hour
125 KVA
100 KVA
35 KVA
42
43
Material transport
Material transport
44
Road marking
45
30
SoRate
for
201011
5
2875
12
250
345
520
4485
2360
7070
14880
110
1550
1090
920
620
3740
45
4.5
90
920
Hire Charges
Description
Sl.
No.
1
46
Machine
2
Plate compacter
Activity
3
For compacting in medians
Unit
SoRate
for
201011
( Rupees)
4
5
Per
40
Hour
47 Drilling equipment
For drilling
Per
1035
Hour
Note: The above hire charges of machinery & plant includes crew, oils,
conveyance of machinery to site and all other incidental charges.
31