Phase 1 The superstructure will be pushed from the end abutment No.

1 to a level
of 20 centimeters by above the level final of project, the cast of the diaphragms of
end abutments 1 and 12 should defined until after completing the push. The push
should (preever) guides lateral to bear effects of wind and seismic during the
mounting of the 20 ton.

Phase 2 assemble in the platform of assembly the segments D-1 to D-8 (90m), so
as the nose of launching with 12 m of length.