Professional Documents
Culture Documents
NOTES
SURVEY IS BASED ON EXISTING GRID SYSTEM
ORIGINATING FROM STATION 2 @ E 500.00, N
500.000, RL 50.000.
0
BORDER
BOTTOMOFBANK
BT
BUILDING
EDGEOFCONC
EDGEOFROAD
ELECPOLE
FENCE
FOOTPATH
GULLY
HV CABLES
KERBLINE
LVCABLES
MANHOLE
SIGNPOST
SPOTLEVELS
STREETLIGHT DUCTS
SURVEYSTNS
STORM
TOPBACKKERB
TOPOFBANK
TREE
UNCLASSTRUCTURE
WALL
WATER MAIN
EMPTY
TITLEBLOCK & BORDER
BOTTOM OF SLOPE/BANKS
BRITISH TELECOM ROUTES
BUILDING OUTLINE.
EDGE OF CONCRETE SURFACE
EDGE OF ROAD SURFACE
ELECTRIC POLE
LINE OF FENCES
EDGE OF FOOTPATH
GULLIES
HV CABLES ROUTES
KERBLINE @ CHANNEL LEVEL
LV CABLE ROUTES
MANHOLES
SIGNPOST
SPOT LEVELS
STREETLIGHT DUCTS
SURVEY STATIONS
STORM WATER MH'S, GULLY'S ETC.
TOP AND BACK OF KERB
TOP OF BANK
TREE TRUNK & FOLIAGE
UNCLASSIFIED STRUCTURE
WALLS
WATER MAIN ROUTE
Control Stations
Stn 6
100.84
MH
100.34
Gully
100.19
100.34
100.34
100.46
100.52
100.40
Orientation
Rev.
Date
Description
SESURVEYING
Client
CP6
100.34
100.40
98.2
Easting
500.000
Northing
500.000
Elevation
50.000
Stn3
488.638
499.975
49.975
Hilti nail
Point Number
Stn2
Description
Hilti nail
R1
488.233
506.164
53.327
Reflective Target
R2
486.452
525.775
51.662
Reflective Target
R3
507.894
488.366
52.338
Reflective Target
R4
485.587
489.696
51.218
Reflective Target
Nick (ACL)
Drawing Title
Sign post
Lamp
Post
Job Title
1/100 @ A1
Date
24/04/14
Surveyed by
AA
Drawn
Checked
AA
SE
006/01/15
Drawing No.
001
Rev.