Professional Documents
Culture Documents
0 Answer Report
Worksheet: [MANAJEMEN SAINS.xlsx]Sheet1
Report Created: 5/26/2014 10:12:46 PM
Result: Solver found an integer solution within tolerance. All Constraints are satisfied.
Solver Engine
Solver Options
Objective Cell (Max)
Cell
$A$11
PROFIT
Variable Cells
Cell
$B$2
$C$2
NILAI X
NILAI Y
Name
Name
Constraints
Cell
$D$6
$D$7
$D$8
$B$2:$C$2=Integer
Name
JAM KERJA MESIN A LHS
JAM KERJA MESIN B LHS
JAM KERJA MESIN C LHS
Cell Value
Formula
26.2 $D$6<=$F$6
59 $D$7<=$F$7
69.8 $D$8<=$F$8
Integer
Integer
Integer
Status
Not Binding
Not Binding
Not Binding
Slack
3.8
1
2.2
PRODUK
NILAI
HARGA
Y
4
17
3000
3000
LHS
2.3
2
4.7
PROFIT
63000
1
3
3
REL
26.2 <=
59 <=
69.8 <=
RHS
30
60
72
Name
profit
Original Value
25540
Final Value
25540
Variable Cells
Cell
$B$2
$C$2
$D$2
Name
Conditioners
Ev. Coolers
Heaters
Original Value
120
31
4
Final Value
120
31
4
Constraints
Cell
$E$9
$E$12
$E$10
$E$7
$E$6
$E$11
$E$8
$B$2:$D$2=Integer
Name
ac frames LHS
jumlah pendingin LHS
cooler frames LHS
driling LHS
wiring LHS
heater frames LHS
assembly LHS
Cell Value
Formula
120 $E$9<=$G$9
151 $E$12>=$G$12
31 $E$10<=$G$10
34.5 $E$7<=$G$7
200 $E$6<=$G$6
4 $E$11<=$G$11
242.2 $E$8<=$G$8
Integer
Integer
Integer
Integer
Status
Binding
Not Binding
Not Binding
Not Binding
Binding
Not Binding
Not Binding
Slack
0
1
69
45.5
0
76
7.8
Conditioners
Ev. Coolers
Heaters
Produk
120
31
nilai
170
140
200
LHS
wiring
driling
assembly
ac frames
cooler frames
heater frames
jumlah pendingin
profit
25540
1.3
0.2
1.7
1
0
0
1
1.2
0.3
1
0
1
0
1
1.7
0.3
1.8
0
0
1
0
REL
200 <=
34.5 <=
242.2 <=
120 <=
31 <=
4 <=
151 >=
RHS
200
80
250
120
100
80
150